Professional Documents
Culture Documents
PremierFireproofing - Travelodge MK - Letter of Compliance
PremierFireproofing - Travelodge MK - Letter of Compliance
Dublin 8
Tel: 00353 834631752
www.premierfireproofing.com
To whom it may concern,
I can verify the following procedure has been used in the application of
passive fire protection products at MARC's Travelodge project in Milton
Keynes:
• The products were applied as required - Through wall and floor service
penetrations as directed by the client and fire strategy drawings.
• Quality reports and benchmark reports were provided throughput the project
• In terms of logging, all installs have been recorded on the BORIS application and
presented in report form.
• All products installed to manufacturers instructions as per material data sheet
methods of installation.
• All required fixings and tapes used as directed.
• We can certify that Premier Fireproofing Ltd Have supplied and installed the
aforementioned products in accordance with regulations: BS476;Part 20 & 22
Should you need any further information regarding this detail do not hesitate to get in touch
with me,
Kind Regards
Paul Mc Gahan, Managing Director.
www.premierfi reproofing.com