FORM U-IA MANUFACTURERS DATA REPORT FOR 7_c3:. B


PRESSURE
(Alternative Form for Single Chamber, Completely Shop-Fabricated VESSELS
Vessels Only)
As Required by the Provisions of the ASME Code Rules,
Section VIII, Division t() 4;/
1. Manufactured and certified by PERFORMANCE PULSATION CONTROL, INC., 390
CLAY ROAD, S(JNNWALE, TX 75182
3c
2. Manufactured for David Brown Union Pumps Company, 4600 West Dickman, Battle(Name and address 01 mareifacejier)
it - -

Creek, MI 49015
(Name arid address 01 Psthoseil
3. Location of installation Unknown
i
fName and address)
4. Type Sphere 1301-D-5 THRU 1301-D-8 DR36X005-AA P0550.2
99 102
(Hddz. or veit tank) (Mfg’s senat No.) (CRN)
2000 -

5. The chemical and physical properties of all parts meet the requirements of (Draing no.) (Nail Bd NOT lYear &idi)
VESSEL CODE. The design, construction, and workmanship conform to ASME Rules, material specifications of the ASME BOILER AND PRESSURE
Section VIII, Division I 1998
to 1999 Year —

Addenda (Qate) Code Case Nos.


Special Ser’ice per UG 2O(d)
6. Shell:
-

Mail. (Spec. No., Gi’ade) Nom. Thk. (in.)


N/A
C. Allow. (in.) Ojam. t.D. (ft. & in.)
7. Seams: — No 100 length lovetaTlfl.TT
1125 1.67 1 Full
Long. (WeWed. Obi. RT. (Spot or Full) Elf. (%)
N/A
H.T. Temp (F) Time (hi) Gr.i (welded, Old.,
Sngi.. Lap, Butt) R.T. (Spof, Partial.
Sr,gl., Lap. BuM) or Full)
.

8. Heads: (a) Math SA-516 70N (b) Mati. SA-516 70N


pec No. l.,raoe)
(Spec No.. Gradel
Location (Top, Minimum Corrosion

Crown Knuckle Elliptical Conical Hemispherical Flat Sde to Pressure


Bottom. Ends) Thickness Allowance Radius Radius Ratio Aoex Anale Radius Diameter (Convex or Concav&
(a) End 1.560 0.0 — — —
— 1W — Concave
(b) End 1.560 0.0 — — —
— 1W — &ave
- If removable, bolts used (describe other fastenings)
— —

(t.’ai. Scec. l’.o. Cr.. Size, No.1


9 MAWP 3400 psi at max. temp.
—_________

250 F
Mm. design metal temp. -40 • F at 3400 psi. Hydro., or test pressure 5100 psi.
10. Nozzles, inspection and safety valve openings:
Purpose Diam. Nom.
(Inlet, Outlet. Drain) No. or Size Reinforcement How
Type Matl. Thk. I Mat’t. Attached Location
Inlet I :
2 2500# RTJ LWN I SA333G6 I SA35OGr LF2 I 0.436 None Welded Head
Outlet I 3 2500# RTJ LWN SA-350 Gr LF2 1.125 None . Welded Head
Drain I 1 2500# RTJ WN I SA350-LF2ISA42O-WPL6
— j 0.35W None Welded Head

11. Supports: Skirt No Lugs 1 Legs 0 Other Footpad Attached Head Welded
- —

(Yes or no) (No.) (No.)


12. Remarks: Manufacturer’s Partial Data Reports properly identified and signed by Commissioned Inspectors have 1
( loescnbel
,’dhere arid how)
been furnished for the following items of this report
None
(Nameolpaitemnumber.MfgsnameanOIdenrsarnpl
Pressure Relief valve per UG-125(a)
Designed per UG-22(a)
Tict test exemption per UG-20(f)

CERTIFICATE OF SHOP COMPLIANCE


We certify that the statements made in this report are correct and that all details of design, material, construction,
and workmanship of this vessel conform
the ASME C d or Pressure Vessels, Section VIII, Division 1. U Certificate of Authorization No. 29,537 ex es April 11 20 3 ‘

Date Co. Name PERFORMANCE PULSAEON CONTROL, INC.


,.

CERTIFICATE OF SHOP INSPECTION /


Vessel constructed by Performance Pulsation Control, Inc. at Sunnyvale, TX 75182
I, the undersigned, holding a valid commission issued by The National Board of Boiler and Pressure Vessel Inspectors and the State or Province o
TEXAS and employed by IB&M RE Arlington, TX have inspected
the component described in this Manufacturer’s Data Report on 2000 and state that, to the best of my knowledge and belief, th
— ,

Manufacturer has constructed this pressure vessel in accordance with ASME Code, Section VIII, Diviion 1.
employer makes any warranty, expressed or implied, concerning the pressure vessel described in this Manufacture By signing this certificate neither the Inspector nor
r’s Data Report.
nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connectedFurthermore, neither the Inspectc
with this inspection.
Date DO Signed Commissions

E D’S,7— A