Professional Documents
Culture Documents
Sample Front Page - Sachin
Sample Front Page - Sachin
Sample Front Page - Sachin
ABSTRACT
The project "Assay cope executive loom “is designed for the Online Lab. The objectives
of this project are to do a web page, which is used for on line Laboratory management. The
Laboratory management means the Lab maintains every detail through this web page. The web
page is mainly used for maintain all patient record of a Lab. The project registers the new patient
for the tests.
The Function of Login events details. It mainly identifies the Admin Login and Employee
Login details. The Admin Function entry of all the client details and results to be entry in the
database.
v
ACKNOWLEDGEMENT
I convey my deep sense of gratitude to the almighty, who has helped me all the way
through my life and molded me into what I am today.
I would like to express my profuse gratitude to our Founder, Correspondent and president
of K.S.R Group of institutions, Lion. Dr. K. S. RANGASAMY, M.J.F., for providing extra
ordinary infrastructure, which helped me in the completion of the project in time.
I would like to thank our respected Dean Dr. A. KRISHNAN, B.Sc., B.E. , M.E. , Ph.D.,
F.I.E., SMIEEE(USA)., MISTE., for his valuable suggestions and inspiration to make this
project a success.
I wish to thank our Head of the Department Dr. A.SUBRAMANI, M.C.A., M. Phil.,
M.B.A., Ph.D., for giving me this opportunity with full encouragement to complete this project.
I would like to thank my project guide Dr. K. K. SAVITHA, M.C.A., M. Phil., Ph.D.,
for guiding me at various stages of the project.
I whole-heartedly thank my beloved friends for their suggestions and timely help
throughout my project work. Finally I thank my parents for their moral support and
encouragement, without whom successful completion of this project would not have been
possible.
vi
TABLE OF CONTENTS
ABSTRACT iv
ACKNOWLEDGEMENT v
LIST OF FIGURES ix
LIST OF ABBREVIATIONS x
1 INTRODUCTION 1
1.1 COMPANY PROFILE 1
1.2 OBJECTIVE 1
2 SYSTEM ANALYSIS 3
2.1 EXISTING SYSTEM 3
2.2 PROPOSED SYSTEM 4
2.3 FEASIBILITY STUDY 5
2.3.1 Technical feasibility 6
2.3.2 Operational feasibility 7
3 SYSTEM SPECIFICATION 8
3.1 HARDWARE SPECIFICATION 8
3.2 SOFTWARE SPECIFICATION 9
4 SOFTWARE DESCRIPTION 10
4.1 FRONT END 10
4.2 BACK END 11
5 PROJECT DESCRIPTION 14
5.1 PROBLEM DEFINITION 14
5.2 OVERVIEW OF THE PROJECT 15
5.3 MODULES DESCRIPTION 20
5.4 USE CASE DIAGRAM 28
5.4.1. Functional Requirement 32
vii
LIST OF TABLES
LIST OF FIGURES
LIST OF ABBREVIATIONS