Professional Documents
Culture Documents
Petroleum Development Oman LLC: 3.8.3 Factory Acceptance Tests
Petroleum Development Oman LLC: 3.8.3 Factory Acceptance Tests
0
Petroleum Development Oman LLC Effective: Nov-11
(often also in an aggressive desert environment) can have serious project cost and
schedule impact later. Equipment packages which are sensitive to damage by shock or
climatic extremes, e.g. Distributed Control System (DCS) equipment, justify special
consideration during all stages of transport.