Professional Documents
Culture Documents
Dry Low NOx
Dry Low NOx
cpd
Primary Gas Purge primary flame detector
Dual fuel only
GSV
Primary
SRV GCV
FD
Secondary
GTV
Transfer
Primary Mode
Re-ignition
DLN-1 TYPICAL
START MODE
TRANSITION
PRIMARY MODE
LOADING
SEQUENCE
LEAN LEAN MODE EXTENDED
LEAN -LEAN
SELECTED
“ON”
(OPTIONAL
SECONDARY TRANSFER MODE SELECTION)
EXTENDED LEAN-
LEAN MODE
PREMIX TRANSFER MODE
PREMIX STEADY
STATE MODE
STOP DLN-1 TYPICAL
MODE
TRANSITION
IF LEAN LEAN
PREMIX STEADY BASE MODE IS UN-LOADING
STATE MODE
SELECTED “ON” SEQUENCE
EXTENDED LEAN-
RE-TGNITION LEAN MODE
PRIMARY MODE
UNIT FLAME-OUT
DLNOx-1 GAS FUEL SYSTEM
Primary Mode
cpd
Primary Gas Purge
Dual fuel only
GSV
Primary
SRV GCV
FD
Secondary
GTV
Transfer
cpd
Transfer Purge
TYPICAL DLNOx FUEL GAS SPLIT SCHEDULE
PRIMARY MODE
100
90 L83FXP
L83FXP2
80 PREMIX MODE
PRIMARY 70
SPLIT L83LLEXT
60
50 EXTENED
L83FXL1 LEAN-LEAN
40 LEAN-LEAN
30 L83FXP1
20 L84FXS1 PREMIX
10 TRANSFER
SECONDARY
0 MODE
1600 1880 1935 2020
Lean-Lean Mode
cpd
Primary Gas Purge
Dual fuel only
GSV
Primary
SRV GCV
Secondary FD
GTV
Transfer
cpd
Transfer Purge
TYPICAL DLNOx FUEL GAS SPLIT SCHEDULE
PRIMARY MODE
100
90 L83FXP
L83FXP2
80 PREMIX MODE
PRIMARY 70
SPLIT L83LLEXT
60 L83FXL1
50 LEAN-LEAN EXTENED
LEAN-LEAN
40
30 L83FXP1
20 L84FXS1 PREMIX
10 TRANSFER
SECONDARY
0 MODE
1600 1880 1935 2020
SRV GCV
Secondary FD
GTV
Transfer
cpd
Transfer Purge
TYPICAL DLNOx FUEL GAS SPLIT SCHEDULE
PRIMARY MODE
100
90 L83FXP
L83FXP2
80 PREMIX MODE
PRIMARY 70
SPLIT L83FXL1 L83LLEXT
60
LEAN-LEAN EXTENED
50
LEAN-LEAN
40
30 L83FXP1
20 L84FXS1 PREMIX
10 TRANSFER
SECONDARY
0 MODE
1600 1880 1935 2020
Secondary Only
cpd
Primary Gas Purge
Dual fuel only
GSV
Primary
SRV GCV
Secondary FD
GTV
Transfer
cpd
Transfer Purge
TYPICAL DLNOx FUEL GAS SPLIT SCHEDULE
PRIMARY MODE
100
90 L83FXP
L83FXP2
80 PREMIX MODE
PRIMARY 70
SPLIT L83FXL1 L83LLEXT
60
LEAN-LEAN EXTENED
50
LEAN-LEAN
40
30 L83FXP1
20 L84FXS1 PREMIX
10 TRANSFER
SECONDARY
0 MODE
1600 1880 1935 2020
Premix Transfer
cpd
Primary Gas Purge
Dual fuel only
GSV
Primary
SRV GCV
FD
Secondary
GTV
Transfer
cpd
Transfer Purge
TYPICAL DLNOx FUEL GAS SPLIT SCHEDULE
PRIMARY MODE
100
90 L83FXP
L83FXP2
80 PREMIX MODE
PRIMARY 70
SPLIT L83LLEXT
60
50 EXTENED
L83FXL1 LEAN-LEAN
40 LEAN-LEAN
30 L83FXP1
20 L84FXS1 PREMIX
10 TRANSFER
SECONDARY
0 MODE
1600 1880 1935 2020
Premix Steady-State
cpd
Primary Gas Purge
Dual fuel only
GSV
Primary
SRV GCV
Secondary FD
GTV
Transfer
cpd
Transfer Purge
TYPICAL DLNOx FUEL GAS SPLIT SCHEDULE
PRIMARY MODE
100
90 L83FXP
L83FXP2
80 PREMIX MODE
PRIMARY 70
SPLIT L83LLEXT
60
50 EXTENED
L83FXL1 LEAN-LEAN
40 LEAN-LEAN
30 L83FXP1
20 L84FXS1 PREMIX
10 TRANSFER
SECONDARY
0 MODE
1600 1880 1935 2020
SRV GCV
FD
Secondary
GTV
Transfer
cpd
Transfer Purge
TYPICAL DLNOx FUEL GAS SPLIT SCHEDULE
PRIMARY MODE
100
90 L83FXP
L83FXP2
80 PREMIX MODE
PRIMARY 70
SPLIT L83LLEXT
60
50 EXTENED
L83FXL1 LEAN-LEAN
40 LEAN-LEAN
30 L83FXP1
20 L84FXS1 PREMIX
10 TRANSFER
SECONDARY
0 MODE
1600 1880 1935 2020
PRIMARY MODE
cpd
Primary Gas Purge
Dual fuel only
GSV
Primary
SRV GCV
Secondary
Transfer
LEAN-LEAN MODE
cpd
Primary Gas Purge
Dual fuel only
GSV
Primary
SRV GCV
Secondary
Transfer
SRV GCV
Secondary FD
GTV
Transfer
cpd
Transfer Purge
Transfer Valve
3-way valve design Secondary Transfer
Fisher YD diverging flow
equal % trim
Actuation/Feedback:
Single hydraulic actuator
Servo controlled
LVDT position feedback
Secondary
The Gas transfer valve only controls flow split
based upon known valve and fuel system characteristics
Spark Plugs
2 per unit, Non-retracting
Capacitive discharge
FD
secondary flame detector
Flame Detection
Standard UV detectors
8 per unit - (4 primary, 4 secondary) spark plug
WATER INJECTION
Used for:
Nox Control on Liquid Fuel
Power Augmentation
Types:
Dual Stream
Emulsion
Ratios:
0.8 to 2.0 Water to Fuel ratios (site specific)
WATER INJECTION
Dual Stream:
– Used on Frame 7s & 9s for Nox & Power Aug.
– One Stop Valve, Two Control Valves
» Stop valve solenoid Controlled
» Control Valves I/P controlled
– Water injection nozzles are Purged when not in use
Purge
Primary
10x
Water
Manifold
Secondary
water skid 10x
Water
Manifold
Purge
WATER INJECTION
• Emulsion:
– Used on 6’s for Nox Control on Liquid Fuel in Lean-Lean
– Hydraulic controlled variable Stop Valve
– Hydraulic controlled variable Control Valve
– Mixes water & Fuel in fuel line near End Cover
Primary
Isolation valve Primary Liq
Fuel
10x
Purge
Stop Control
Valve Valve