JOB HAZARD ANALYSIS FORM

JHA NUMBER NO: DOD-MST-E-011 Revision: 0

Type of Job being analyzed: INSTALLATION AND TESTING OF WELDING SOCKETS AND POWER OUTLETS
JHA Members: HSE Department, Construction Manager
Department/Section originating JHA
JOB Performers: Supervisor, Electricians, Riggers, Helpers
Normal approvals: Name Signature DATE GENERAL JOB REQUIREMENTS
JHA By: George.K.Thomas COMMON PPE
Avaneesh Chaudhary 8/13/2007
GENERAL JOB REQUIREMENTS
Additional Approvals (Determined by JOB Supervisor in correlation with CTJV EHSS Manager) 1 CTJV EHSS Inducted workforce
Name Signature Date 2 Dodsal HSE Inducted
3 Daily TBT
4 Adequate supervision
Discipline Superintendent (CTJV) 5 Third Party certified, colour coded lifting
EHSS Representative (CTJV) equipments and lifting tools & tackles.
EHSS Representative (Company) 6 Valid Qatari Licenses for drivers & operators
CTJV I.H. 7 Third Party certified, competent operators,
Other (List Below) electricians, riggers.
PPE
NOMEX Coveralls, Safety shoes, Helmets
Notes: EHSS sign when required for hazardous Safety Goggles , Appropriate Hand gloves
Work details as required by CTJV PTW. 8 S.T.A.R.T CARD
APPROVAL REQUIRED FOR HAZARDOUS WORK DETAILED IN THE CTJV WORK PERMIT PROCEDURE
CHANGING CONDITIONS & EMERGENCY PROCEDURStop Work, Switch Off Equipment, Supervisor Directs Personnel to Nearest and Safest
Muster point Considering Wind direction. Supervisor accounts for all Workers.
Missing persons are reported to CTJV EHSS Dept. When all clear is given check with CTJV EHSS before resuming to work.
EMERGENCY TELEPHONE NO: Ras Gas - 473 8999
Note: If any of the tasks involves biological, physical or chemical hazards, then CTJV Industrial Hygienist must also approve the work
Use additional sheets as necessary
Details on safety (PPE, Hazards etc) and environmental requirements can be found in CTJV and Ras Gas Safety and Environmental procedure.

Page 1 of 3
Doc. #: DOD-MST-E-011 INSTALLATION AND TESTING OF WELDING SOCKETS AND POWER OUTLETS
SEQUENCE OF BASIC
POTENTIAL HAZARDS HAZARDS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS

Method statement to be explained to all employees and it must be


made available at the site.
Hazard assessed and safety
Obtain Method Statement and JHA to be made available at the site and job specific hazards &
precautions are not identified/
1.0 Safety Document & Job specific 1.1 1.1.1 control measures to be communicated to all personnel involved in Engineer, Supervisor
assessed and required control
Tool Box Talk the job by using START Card. START Card to be filled up prior to
measures not communicated.
the start of work and to be kept in the site.
Pre lift check list to be filled up before commencing the job.

Obtain PTW for Hot work/Cold work prior to the commencement of


Necessary information not
2.0 Obtain PTW. 2.1 2.1.1 the work and to be kept at the work site. Engineer, Supervisor
communicated to the facility owner.
Basic PPE to be used by all employees.

Ensure welding /drilling machines inspected and approved


Working with Welding
Ensure trained and experienced operators are assigned to the job
Welding operation/ Drilling machine/Drilling machine
3.0 3.1 3.1.1 Ensure machines are checked for their good working condition prior Site supervisor
operation Electricity
to the start of the job by operators
Damaged/ uninsulated power cables
Only competent people will be deployed for the job. 0

Ensure all hand tools are inspected and approved


Working with hand tools
Ensure trained and experienced operators are assigned to the job
(steel/plastic lead hammer, pliers,
4.0 Working with hand tools 4.0 4.1 Ensure all hand tools are checked for their good working condition Site supervisor
screw drivers, tools for hand
prior to the start of the job by operators
excavation)
No home made hand tools to be used.
0

Unwanted disturbance/personnel
movement in the work area Ensure area is barricaded and no unwanted personnel movement
Poor barrication and no safety Always secure the area of barrication and correct safety signage as
5.0 Area Preparation & Barricading 5.1 Signage 5.1.1 per activities Site supervisor
No contact person in case of Print the name and contact number of in-charge electrician are in
electrical troble. place.

DOD-MST-E-011 INSTALLATION AND TESTING OF WELDING SOCKETS AND POWER OUTLETS Page 2 of 3
Doc. #: DOD-MST-E-011 INSTALLATION AND TESTING OF WELDING SOCKETS AND POWER OUTLETS
SEQUENCE OF BASIC
POTENTIAL HAZARDS HAZARDS CONTROL RESPONSIBLE PARTY
ACTIVITY STEPS

Controlling vehicular/personnel Unwanted disturbance in the work Ensure safety sign board is provided and no unwanted
6.0 6.1 6.1.1 Site supervisor
movement if required area vehicular/personnel movement in the work site

Incompetent Supervisor and Ensure competent Supervisor assign in these Task


Fitting of tray support to the electrician Ensure welding /drilling machines inspected and approved
7.0 structure for sockets and Power 7.1 Working with power operated 7.1.1 Ensure trained and experienced operators are assigned to the job Site supervisor
outlets. equipment Ensure machines are checked for their good working condition prior
Damaged/ uninsulated power cables to the start of the job by operators

Ensure personnel working with rubber hand gloves.


Installation of welding sockets and Electric shock
8.0 8.1 8.1.1 Do not use cable and outlets without approval of CTJV Electrical Site supervisor
power outlets Loose gears/tools broken
Inspector.

Linking of cable,sockets and power


Cutting cables with cable cutting Ensure personnel are using hand gloves and proper eye protection.
outlets with earthing conductor
tools Ensure all electrical materials should be follow the specification as
9.0 and bonding. 9.1 9.1.1 Site supervisor
Using crimping tools per requirement.
Installation of welding sockets and
Hand injuries or finger cut. Do not used defective electrical outlet and sockets. 0
power outlets

Provide drinking plenty of water and Rest shelter


Heat stress Ensure the area is clear from any under foot obstacles.
No drinking water Use proper hand protection(hand gloves)
10.0 Housekeeping 10.1 10.1.1 All
No rest shelter Clear up all off cuts and tools before leaving the work place
Tripping hazards Removed all cable not using in the task.
Fire extinguiser are in place always.

CTJV (M) 580 2524


EMERGENCY CONTACT NOS. All
DODSAL (M) 588 2734

DOD-MST-E-011 INSTALLATION AND TESTING OF WELDING SOCKETS AND POWER OUTLETS Page 3 of 3