Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 5

Equipment packing list of Rig GW123 at IPPI PORT In ENDE

NO. Packing No. Description LTH WIDH HIGH VOL.(m3)


unit QTY G.W. (Kgs)
1 GW123-01 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
2 GW123-02 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
3 GW123-03 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
4 GW123-04 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
5 GW123-05 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
6 GW123-06 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
7 GW123-07 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
8 GW123-08 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
9 GW123-09 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
10 GW123-10 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
11 GW123-11 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
12 GW123-12 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
13 GW123-13 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
14 GW123-14 Main Camp Sleeper pcs 1 12,000 12.00 3.00 3.00 108.00
15 GW123-15 Bathe Room pcs 1 12,000 12.00 3.00 3.00 108.00
16 GW123-16 Laundry Room pcs 1 12,000 12.00 3.00 3.00 108.00
17 GW123-17 Dining Hall and Kitchen pcs 1 12,000 12.00 3.00 3.00 108.00
18 GW123-18 Dining Hall pcs 1 12,000 12.00 3.00 3.00 108.00
19 GW123-19 Indo Kitchen pcs 1 12,000 12.00 3.00 3.00 108.00
20 GW123-20 Refrage Room pcs 1 12,000 12.00 3.00 3.00 108.00
21 GW123-21 Refrage Room pcs 1 12,000 12.00 3.00 3.00 108.00
22 GW123-22 Recreation Room pcs 1 12,000 12.00 3.00 3.00 108.00
23 GW123-23 Water Tank pcs 1 8,000 12.00 3.00 2.20 79.20
24 GW123-24 Water Treatment Tank pcs 1 9,500 12.00 3.00 2.20 79.20
25 GW123-25 Volvo Genset pcs 1 14,000 12.00 3.00 3.00 108.00
26 GW123-26 60m3 Fuel Tank pcs 1 8,000 12.00 3.00 3.00 108.00
27 GW123-27 Rig Camp(Co-man) pcs 1 12,000 12.00 3.00 3.00 108.00
28 GW123-28 Rig Camp(NCo-man) pcs 1 12,000 12.00 3.00 3.00 108.00
29 GW123-29 Rig Camp(rig maneger) pcs 1 12,000 12.00 3.00 3.00 108.00
30 GW123-30 Rig camp(2man sleeper) pcs 1 12,000 12.00 3.00 3.00 108.00
31 GW123-31 Rig camp(2man sleeper) pcs 1 12,000 12.00 3.00 3.00 108.00
32 GW123-32 Rig camp(2man sleeper) pcs 1 12,000 12.00 3.00 3.00 108.00
33 GW123-33 Rig camp(4man sleeper) pcs 1 12,000 12.00 3.00 3.00 108.00
34 GW123-34 Rig camp(4man sleeper) pcs 1 12,000 12.00 3.00 3.00 108.00
35 GW123-35 Rig camp(4man sleeper) pcs 1 12,000 12.00 3.00 3.00 108.00
36 GW123-36 Preyer Room pcs 1 12,000 12.00 3.00 3.00 108.00
37 GW123-37 Clinic pcs 1 12,000 12.00 3.00 3.00 108.00
38 GW123-38 Rig Camp Meeting Room pcs 1 12,000 12.00 3.00 3.00 108.00
39 GW123-39 Rig office pcs 1 12,000 12.00 3.00 3.00 108.00
40 GW123-40 Rig camp water tank(white) pcs 1 10,000 8.00 3.00 2.50 60.00
45 GW123-45 rig container pcs 1 6,000 3.00 2.00 2.40 14.40
46 GW123-46 SCR system-2000hp, pcs 1 24,000 12.50 2.90 3.20 116.00
47 GW123-47 accordion cable slot, grasshopper leg pcs 1 10,700 10.50 2.10 2.00 44.10
48 main cable slot, ZJ70D pcs 1 3,700 6.80 1.60 0.50 5.44
GW123-48
49 main cable slot, ZJ70D pcs 1 5,000 8.50 1.20 0.50 5.10
50 GW123-49 1# Main Genset pcs 1 22,500 12.00 3.00 3.00 108.00
51 GW123-50 2# Main Genset pcs 1 22,501 12.00 3.00 3.00 108.00
52 GW123-51 3# Main Genset pcs 1 22,502 12.00 3.00 3.00 108.00
Equipment packing list of Rig GW123 at IPPI PORT In ENDE
NO. Packing No. Description LTH WIDH HIGH VOL.(m3)
unit QTY G.W. (Kgs)
53 GW123-52 4# Main Genset pcs 1 22,503 12.00 3.00 3.00 108.00
54 GW123-53 Auxiliary Genset pcs 1 18,000 12.00 3.00 3.00 108.00
55 GW123-54 Air Compressor Room pcs 1 12,500 12.00 3.00 3.00 108.00
56 GW123-55 Rig Fuel Tank pcs 1 12,000 12.00 3.00 2.50 90.00
57 GW123-56 Rig Fuel Tank pcs 1 12,000 12.00 3.00 2.50 90.00
58 GW123-57 1# mud pump F-1600 pcs 1 38,500 10.80 2.70 3.20 93.31
59 GW123-58 2# mud pump F-1600 pcs 1 38,500 10.80 2.70 3.20 93.31
60 GW123-59 3# mud pump F-1600 pcs 1 38,500 10.80 2.70 3.20 93.31
61 pressure manifold plank pcs 1 8,700 11.20 1.70 1.50 28.56
62 GW123-60 hight pressure manifold pcs 1 2,000 4.00 2.00 0.70 5.60
63 stand pipe pressure manifold pcs 1 2,000 3.00 2.00 1.00 6.00
64 GW123-61 Rig Water Reserve Tank pcs 1 10,000 12.00 3.00 2.50 90.00
65 GW123-62 1# Mud Tank pcs 1 22,000 12.00 3.00 2.50 90.00
66 GW123-63 2# Mud Tank pcs 1 22,000 12.00 3.00 2.50 90.00

67 GW123-64 3# Mud Tank pcs 1 22,000 12.00 3.00 2.50 90.00

68 GW123-65 4# Mud Tank pcs 1 22,000 12.00 3.00 2.50 90.00

69 GW123-66 5# Mud Tank pcs 1 22,000 12.00 3.00 2.50 90.00

70 GW123-67 6# Mud Tank pcs 1 22,000 12.00 3.00 2.50 90.00


72 GW123-69 Cooling Tank pcs 1 16,000 12.00 3.00 2.50 90.00
73 GW123-70 ladder 3 pis pcs 1 1,000 4.00 0.80 0.80 2.56

74 1# Shale shaker DERRICK-2000 pcs 1 1,500 2.80 1.60 1.50 6.72

75 2# Shale shaker DERRICK-2000 pcs 1 1,500 2.80 1.60 1.50 6.72


GW123-071
76 3# Shale shaker DERRICK-2000 pcs 1 1,500 2.80 1.60 1.50 6.72

77 mud bell pcs 1 3,000 3.00 1.00 2.50 7.50


78 flow line pcs 1 3,000 10.00 0.80 0.80 6.40
GW123-72
79 subscribe pcs 1 2,000 8.00 0.80 1.20 7.68
82 GW123-75 poor boy degasser NQF1200/1.6 c/w accessories pcs 1 18,900 8.20 3.10 3.70 94.05
83 degasser ZCQ/5, c/w accessories pcs 1 2,000 2.40 1.80 2.20 9.50
85 High speed centrifuge, LW type pcs 1 2,000 3.00 1.60 1.80 8.64
86 low speed centrifuge, LW type pcs 1 2,000 3.00 1.60 1.80 8.64
87 GW123-76 substructure of High speed centrifuge, pcs 1 1,000 3.00 1.60 2.20 10.56
88 substructure of low speed centrifuge, pcs 1 1,000 3.00 1.60 2.20 10.56
89 slug Tank c/w accessories pcs 1 20,100 12.20 2.80 3.00 102.48
GW123-077
90 mud lab room c/w accessories pcs 1 1,000 1.80 1.80 2.55 8.26
91 GW123-78 Block House pcs 1 6,000 8.00 2.50 3.00 60.00
92 crown block TC-450 c/w frame pcs 1 9,200 3.50 3.00 2.80 29.40
GW123-79
93 truvling block TC-450 c/w frame pcs 1 11,000 2.90 1.60 0.80 3.71
94 hook DG-450 pcs 1 3,500 2.50 1.00 1.00 2.50
GW123-80
95 drill line electric reeling unit pcs 1 10,000 4.50 1.80 2.20 17.82
96 GW123-81 left and right Ⅰsegment of mast JJ450 pcs 1 13,400 10.80 3.40 2.50 91.80
97 GW123-82 left and right Ⅱsegment of mast JJ450 pcs 1 18,500 9.30 3.10 2.60 74.96
98 GW123-83 left and right Ⅲ segment of mast JJ450 pcs 1 15,600 12.70 3.10 2.60 102.36
99 GW123-84 left and right Ⅳsegment of mast JJ450 pcs 1 10,600 12.40 2.90 2.50 89.90
Equipment packing list of Rig GW123 at IPPI PORT In ENDE
NO. Packing No. Description LTH WIDH HIGH VOL.(m3)
unit QTY G.W. (Kgs)
100 GW123-85 left and right Ⅴsegment of mast JJ450 pcs 1 16,100 12.30 3.10 2.50 95.33
101 GW123-86 derrick reinforced steel of mast JJ450 pcs 1 10,700 9.50 3.10 1.80 53.01
102 steel frame 1 of mast pcs 1 2,000 9.00 0.50 1.00 4.50
103 steel frame 2 of mast pcs 1 2,000 9.00 0.50 1.00 4.50
104 steel frame 3 of mast pcs 1 1,500 7.00 0.50 1.00 3.50
105 GW123-87 steel frame 4 of mast pcs 1 1,000 5.50 0.50 1.00 2.75
106 steel frame 5 of mast pcs 1 800 4.00 0.50 1.00 2.00
107 steel frame 6 of mast pcs 1 500 3.00 0.50 1.00 1.50
108 derrick connecting frame of mast JJ450 pcs 1 500 2.00 0.40 2.00 1.60
109 brail 1(2pis) of mast pcs 1 1,000 4.50 0.70 0.30 0.95
110 brail 2(2pis) of mast pcs 1 1,200 6.00 0.70 0.30 1.26
111 brail 3 of mast pcs 1 1,200 9.00 0.30 0.30 0.81
112 brail 4 of mast pcs 1 1,000 8.00 0.30 0.30 0.72
113 GW123-89 brail 5 of mast pcs 1 800 7.00 0.30 0.30 0.63
114 brail 6 of mast pcs 1 500 6.00 0.30 0.30 0.54
115 brail 7 of mast pcs 1 450 5.50 0.30 0.30 0.50
116 brail 8 of mast pcs 1 150 2.20 0.30 0.30 0.20
118 casing board pcs 1 1,500 6.00 1.00 1.00 6.00
117 GW123-88 monkey board, JJ450 pcs 1 7,800 8.50 3.30 1.80 50.49
119 left front leg of mast JJ450 pcs 1 14,500 13.50 2.50 1.60 54.00
GW123-90
120 left front leg of mast JJ450 pcs 1 14,500 13.50 2.50 1.60 54.00
121 GW123-91 left front beam of mast JJ451 pcs 1 6,000 8.00 1.00 1.40 11.20
122 high racking frame of mast JJ450 pcs 1 3,500 3.10 3.80 3.50 41.23
GW123-92
123 low racking frame of mast JJ450 pcs 1 1,000 1.50 1.20 1.60 2.88
124 GW123-093 right front of substructure DZ70D01 pcs 1 16,200 12.80 3.30 2.80 118.27
125 GW123-094 left front base of substructure DZ70D01 pcs 1 15,100 12.80 3.30 2.60 109.82
126 right back base of substructure DZ70D01 pcs 1 15,600 6.80 2.80 2.30 43.79
GW123-096
127 left back base of substructure DZ70D01 pcs 1 16,700 6.80 2.80 1.50 28.56
128 connecting frame Ⅰ of substructure pcs 1 2,000 6.00 0.80 0.80 3.84
129 brail Ⅰ of substructure pcs 1 800 4.00 0.70 0.50 1.40
GW123-097
130 connecting frame Ⅱ of substructure pcs 1 3,000 6.00 1.20 0.80 5.76
131 brail Ⅱ of substructure pcs 1 800 4.50 0.70 0.50 1.58
132 front crutch of substructure DZ70D01 pcs 1 4,200 8.10 2.50 1.80 36.45
GW123-098
133 back crutch of substructure DZ70D01 pcs 1 7,000 8.50 2.00 0.80 13.60
134 GW123-099 middle crutch of substructure DZ70D01 pcs 1 11,600 8.10 2.10 2.60 44.23
135 pcs 1 1,500 3.00 1.00 0.80 2.40
136 GW123-100 BOP lifting set pcs 1 2,000 3.00 2.00 2.00 12.00
137 BOP lifting beam pcs 2 4,000 12.00 0.70 1.00 8.40
138 GW123-101 right upper base of substructure DZ70D01 pcs 1 26,700 14.10 3.40 3.10 148.61
139 GW123-102 left upper base of substructure DZ70D01 pcs 1 24,300 14.10 3.40 3.10 148.61
140 GW123-103 air reservior tank pcs 1 7,800 7.00 2.80 2.10 41.16
141 rig floor pipe racking board pcs 1 24,700 7.80 3.40 3.10 82.21
GW123-104
142 cross beam of drawworks JC70D pcs 1 8,500 7.50 3.20 2.60 62.40
cross beam of drawworks JC71D pcs 1 4,000 7.50 0.50 2.60 9.75
143 GW123-105 drawworks JC-70D, part #1 pcs 1 42,800 7.60 3.30 3.30 82.76
144 GW123-106 drawworks JC-70D, part #2 pcs 1 15,400 6.50 1.70 2.20 24.31
147 GW123-107 rotary table ZP375 and cross beam pcs 1 16,000 5.50 2.10 1.30 15.02
148 GW123-108 gear box of rotary table ZP375 pcs 1 8,700 4.10 3.00 1.20 14.76
Equipment packing list of Rig GW123 at IPPI PORT In ENDE
NO. Packing No. Description LTH WIDH HIGH VOL.(m3)
unit QTY G.W. (Kgs)
149 drill floor table before drawworks pcs 1 800 4.50 2.50 0.50 5.63
150 drill floor table pcs 1 500 3.00 1.00 0.50 1.50
GW123-109
151 drill floor table behind drawworks pcs 1 2,000 6.00 2.50 0.50 7.50
152 driller's cabine c/w accessories pcs 1 3,600 2.60 2.20 2.60 14.87
153 GW123-110 left dog house c/w accessories pcs 1 20,100 10.60 2.80 2.50 74.20
154 GW123-111 right dog house c/w accessories pcs 1 20,100 10.00 2.80 2.50 70.00
155 hrdraulic lift, TS-1.5E pcs 1 4,300 7.50 1.30 1.60 15.60
156 ladder 1 pcs 1 3,000 14.00 0.80 1.00 11.20
GW123-112
157 ladder 2 pcs 1 2,000 10.00 0.80 1.00 8.00
158 ladder 3 pcs 1 3,000 14.00 0.80 1.00 11.20
159 slide way pcs 1 5,000 14.00 0.80 1.00 11.20
160 GW123-113 upper section of ramp, pcs 1 12,100 8.00 2.30 0.30 5.52
161 lower section of ramp, pcs 1 10,000 8.00 2.30 0.30 5.52
162 GW123-114 rig container, 40 feet pcs 1 21,000 12.00 3.10 3.00 111.60
163 GW123-115 rig container, 40 feet pcs 1 23,000 12.00 3.10 3.00 111.60
164 GW123-116 rig container, 20feet pcs 1 14,000 6.00 2.35 2.35 33.14
165 GW123-117 rig container, 40 feet pcs 1 21,500 12.00 3.10 3.00 111.60
166 GW123-118 rig container, 40 feet pcs 1 17,000 12.00 3.10 3.00 111.60
167 GW123-119 rig container, 20 feet pcs 1 15,000 6.00 2.35 2.35 33.14
168 GW123-120 rig container, 20 feet pcs 1 10,000 6.00 2.35 2.35 33.14
169 GW123-121 rig container, 20 feet pcs 1 20,000 6.00 2.35 2.35 33.14
170 GW123-122 rig container, 20 feet pcs 1 13,000 6.00 2.35 2.35 33.14
171 GW123-123 rig container, 20 feet pcs 1 8,000 6.00 2.35 2.35 33.14
172 GW123-124 rig container, 20 feet pcs 1 7,000 6.00 2.35 2.35 33.14
173 GW123-125 rig container, 20 feet pcs 1 21,000 6.00 2.35 2.35 33.14
174 GW123-126 rig container, 40 feet pcs 1 18,000 12.00 3.10 3.00 111.60
175 GW123-127 rig container, 40 feet pcs 1 14,000 12.00 3.10 3.00 111.60
176 GW123-128 rig container, 20 feet pcs 1 12,000 6.00 2.35 2.35 33.14
177 GW123-129 rig site workshop pcs 1 20,000 12.00 3.10 2.90 107.88
178 GW123-130 rig site storage room pcs 1 15,000 12.00 3.10 2.90 107.88
179 GW123-131 lobby pcs 1 9,000 12.00 3.10 2.90 107.88
180 GW123-132 skid c/w accessories pcs 1 12,000 12.00 3.10 1.00 37.20
181 GW123-133 skid c/w accessories pcs 1 12,000 12.00 3.10 1.00 37.20
182 GW123-134 log sledge #1, pcs 1 19,200 11.00 2.80 1.00 30.80
183 GW123-135 tools skid pcs 1 8,000 6.00 3.10 1.00 18.60
184 GW123-136 rig skid room c/w accessories pcs 1 12,000 8.00 3.10 2.00 49.60
185 cat walk 1#, section #1 pcs 1 6,000 8.20 2.10 0.80 13.78
GW123-137
186 cat walk 2#, section #2 pcs 1 6,000 8.20 2.10 0.80 13.78
187 GW123-138 pipe rack 1x4 pcs 1 2,400 6.30 1.00 0.80 5.04
188 GW123-139 BOP Remote control system FKQ1280-7 pcs 1 19,000 12.00 2.95 2.96 104.78

189 BOP control pipe united pcs 1 4,500 8.00 1.00 0.60 4.80

190 annular BOP, Rongsheng FH35-35/70, 5000psi pcs 1 4,100 1.80 1.70 1.70 5.20
GW123-140

191 double ram BOP, Rongsheng 2FZ35-70, 10,000psi pcs 1 8,000 1.50 1.60 1.30 3.12
single ram BOP FZ35-70, Rongsheng FZ35-70,
192 pcs 1 3,700 1.20 1.60 1.10 2.11
10,000psi

196 GW123-141 drilling spool FZ35-70 pcs 1 5,600 1.80 1.70 1.70 5.20
Equipment packing list of Rig GW123 at IPPI PORT In ENDE
NO. Packing No. Description LTH WIDH HIGH VOL.(m3)
unit QTY G.W. (Kgs)
197 high pressure hose, 5,000psi pcs 1 2,100 1.90 1.90 1.10 3.97
198 chock manifold pcs 1 7,000 6.00 3.00 1.20 21.60
GW123-142
199 kill manifold, 10,000psi pcs 1 4,200 3.50 2.20 1.00 7.70
200 adapter and spacer spools pcs 1 3,600 1.80 1.00 1.00 1.80
201 discharge pipe 8", GX200-900class pcs 1 16,200 10.50 1.70 1.50 26.78
GW123-143
202 fire line pcs 1 8,000 10.00 1.20 1.80 21.60
203 double ram BOP 2FZ54-14 pcs 1 8,100 3.50 1.60 1.90 10.64
204 GW123-144 FH54-14 annular BOP, 2000psi, c/w installation kit pcs 1 5,600 1.80 1.90 1.90 6.50
205 54-14 drilling spool, outlet (10"-class900,H=900) pcs 1 3,500 1.60 1.20 1.30 2.50
206 GW123-145 security house c/w accessories pcs 1 15,000 2.50 2.00 2.90 14.50
207 steel wooden rig matting, 5mx2mx0.21mx10 pcs 1 13,500 5.00 2.00 2.10 21.00
GW123-146
208 steel wooden rig matting, 5mx2mx0.21mx10 pcs 1 13,500 5.00 2.00 2.10 21.00
209 steel wooden rig matting, 4mx2mx0.21mx10 pcs 1 10,000 4.00 2.00 2.10 16.80
GW123-147
210 steel wooden rig matting, 4mx2mx0.21mx10 pcs 1 10,000 4.00 2.00 2.10 16.80
211 GW123-148 steel wooden rig matting, 3mx2mx0.21mx50 pcs 1 7,500 3.00 2.00 2.10 12.60
212 GW123-149 fitting box for mast (JJ450) 1#, c/w accessories pcs 1 1,900 1.90 1.10 1.30 2.72
213 GW123-150 drill pipe box pcs 1 19,267 12.00 2.80 1.00 33.60
214 GW123-151 drill pipe box pcs 1 20,556 12.00 2.80 1.00 33.60
215 GW123-152 drill pipe box pcs 1 18,584 12.00 2.80 1.00 33.60
216 GW123-153 drill pipe box pcs 1 20,584 12.00 2.80 1.00 33.60
217 GW123-154 drill pipe box pcs 1 17,584 12.00 2.80 1.00 33.60
218 GW123-155 drill pipe box pcs 1 17,584 12.00 2.80 1.00 33.60
219 GW123-156 drill pipe box pcs 1 17,584 12.00 2.80 1.00 33.60
220 GW123-157 drill pipe box pcs 1 18,584 12.00 2.80 1.00 33.60
221 GW123-158 drill pipe box pcs 1 19,267 12.00 2.80 1.00 33.60
222 GW123-159 drill pipe box pcs 1 17,584 12.00 2.80 1.00 33.60
224 GW123-165 3 1/2"drill pipe *80pis pcs 1 21,000 10.00 2.80 1.00 28.00
225 GW123-166 3 1/2"drill pipe *80pis pcs 1 21,000 10.00 2.80 1.00 28.00
226 GW123-167 3 1/2"drill pipe *80pis pcs 1 21,000 10.00 2.80 1.00 28.00

227 GW123-168 3 1/2"drill pipe *80pis pcs 1 21,000 10.00 2.80 1.00 28.00

231 GW123-172 light unit *4pis pcs 1 4,000 1.20 1.20 6.00 8.64
233 GW123-174 water pump 2# pcs 1 10,000 8.00 3.00 1.80 43.20
234 GW123-175 water pump 3# pcs 1 4,000 6.00 2.00 1.50 18.00
235 GW123-176 welding house pcs 1 4,000 6.00 2.00 2.00 24.00
236 GW123-177 water pipe pcs 1 5,000 10.00 2.80 1.00 28.00

2,090,384 Total 11,133.71


Total

You might also like