Title: Investigation Report Rev No: 00


Customer: Sterlite

Document No Category : Page Date Prpd. By


SE/GP/T/NP/BIC/F RCA 1/3 05/12/2020 Ahmer Hasan
Y21/03

Product Type : 420kV CVT


Serial-No. : 4CV1956
Project : Sterlite

History:

1 no. of CVT was found to be leaked from the insulator cementing joint.

Findings:

We found the following observations:


1. The CVT is verified for the damage and oil leakage is observed from the porcelain
and cementing joint. Minor oil leakage is observed from the joint as per below photos.

2. Insulator is found to be opened from cementing joint and due to this oil was coming
out.
3. Oil level in the EMU box is found to be ok.

Unrestricted
Siemens Ltd. India
Computer Original

Title: Investigation Report Rev No: 00


Customer: Sterlite

Document No Category : Page Date Prpd. By


SE/GP/T/NP/BIC/F RCA 2/3 05/12/2020 Ahmer Hasan
Y21/03

Probable Root Causes:

As per the above observations the damages in the CVT may be due to the transport
jerks due to abnormal road conditions and improper damping on the CVT’s in
packing which can be improved.

Corrective action:

1. Rubber pad of higher shore hardness to be used between CVT and packing
case and also on the hardware as per below sketch and photos.

2. More awareness / information to be given to the transporters for the safe


driving of vehicle to avoid this transport damage issues.

Unrestricted
Siemens Ltd. India
Computer Original

Title: Investigation Report Rev No: 00


Customer: Sterlite

Document No Category : Page Date Prpd. By


SE/GP/T/NP/BIC/F RCA 3/3 05/12/2020 Ahmer Hasan
Y21/03

Repair / Replacement:

The lower stack of CVT to be replaced with the new stack followed by all Routine
Tests before dispatch to the site.

Hasan Digitally signed by Hasan Ahmer


DN: cn=Hasan Ahmer, o=Siemens,

Ahmer email=ahmer.hasan@siemens.com