3 A CM Engineer employrnl In Ilse private 'odor Who nig

and seals urn Clv i I' noinoming plans spocificalions a


SI Clli iff 5
other related documents of n certain project for and in bah
of his employers shall be compensated wall a minimum
10% of the professional fee for the project. over and a Total Project Cost
the basic monthly salary.

GENERAL
able total cost is a major concern of the client throughout the
nine desi gn, and construction phases of a project The
Ole total capital cost. often used to establish budgets for a
I project. is made up of.

Professional engineering costs.


Construction cost

Legal and and costs

Owner's costs. including project administration, staffing.


financing, and other overhead

Contingency allowance for unknowns.


PROFESSIONAL ENGINEERING COSTS

Civil Engineer is often engaged to make a study and to render a


planning report on the contemplated project, including alternative
solutions, layouts, and locations along with initial estimates of
the probable project cost. These may involve alternative or
phased implementation schemes which add flexibility to the
project

The study and report phase may include the cost for field or
traffic surveys, planning analyses, geotechnical
explorations and analyses, in addition, to the direct engineering
costs.