Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

L

E OF THE EXECUTIVE ENGINEER P.W.D. DIVISION


HOSHA\GABAD {NI.P.}

a
LETTER OF ACCEPTANCE (LOA)
by....tp.fr /sAC/ D
^t"
d...?. !:.:/. 1.. ?a
)

U/S.rambh Construction, (pro. Shri piyuslr pawar)


246, ward no.7, Gadipura
Harda (M.P.)

-:ub:- B.T. Patch rcpairs on Seonimalwa bypass roarl, (p.A.C. _ 19.5i Lacs)
*)k*+**;k*+**
Dear Sir(s).

Your bid 1br thc work melltioned above has bcen accepted on bahalf ofthe
Covcmor of
Madhya Pradesh at your bidcd percentagc 26.99 below/above or at par the
Bill of euantities and
item rvise rates given thercin.

You are requested to submit within 15 (Fifteen) days from the date of issue
of this
Ietter.

a. The pcr.fbrmance sccurit,"- / peritrrmance guurxntre of Rs. (5yo p.G.) jl44} + ll.ggyo Ad.
P-G.)- 171311/- = 242j541- ( in figure llupees Two Lacs Fourty
Two Thousand Seven
Hundrcd Fifty Four Rupees in rvords only)..fhc perforrnance security shall be in
the
shape of'temr deposit receipl / ba,k guarantee of any nationalized / schedule
commercial
bank valid upto three nonths aft,.,r thc expJr5 ofilcfecis lirbiliq period.
b. Sign the cottract agreculerrt.

Plcase note that the time allorved fbr carryiDg out thc work as entered in
the bid is Three
months including / exeludir4 rainy season. shall bc reckoned l-rorn the date
of signing the
contract agrcemel1t.
Sig,ing the contract agreement shall bc reckoned as inlination to com,,encement
.
and no separate letter ibr corrrmetrcernenl ot work is required. Therelbre,
ofwork
after signing of thc
agreement, 1'ou arc directed to contact thc Engi,cer-in-charge for taking
the possessioin oisite and
necessary instluctiols to stal.t the trork.

Yours Faithfully
---,e-
Signature Not
Executive Verified
Engineer
P.W.D.
Digitally Dn.by
signed MOHAMMAD RASHID
E$hangabad
KHAN
61fof 15:39:11
Date: 2020.12.18 Govemor ISTof M.P.l
13 Location: Madhya Pradesh-MP

You might also like