Printed: 06/12/2020
Type : Ship
Approved : Yes
Instruction
Information obtained from Operators, Charterer, Agent, Port
authorities and Pilot to be considered for all calculations. The
Vessel to comply with company Under Keel Clearance requirements Master must discuss with the pilot the anticipated under-keel
as given in SMM 02.01.03. The CATZOC might cause a need for clearance and the Master must obtain as much information as
deviating, but this must under no circumstances jeopardise the possible from the pilot regarding the transit to the port or terminal.
safety of the vessel. Prior to navigating into such areas the Master The discussion must be prioritised and is meant for the master to
must communicate the recommended safe Under Keel Clearance to gain a proper understanding of the Pilot's recommendations and
the relevant vessel group for approval according to SMM 07.10.08 concerns and must be completed prior proceeding. During the
Management of Change procedure. Updated and recent Information approach the master must be vigilant and challenge the Pilot in his
from Operations, Charterer, Agent, Port Authorities and Pilot to be commands and take over command if in doubt of the Pilots
obtained. Past experience from transit/approach/arrival/departure at intentions. Bridge Management Team must be level 4 before pilot
the port to be obtained from the company; i.e. ECDIS track from station, and level 5 from Pilot has boarded until alongside or in safe
other vessels if available, experiences from other vessels etc. waters. Continuous monitoring of echo sounder during transit.
Passage planning made with special consideration to surrounding Maintain lowest possible speed allowing safe steering and
and shallow spots and monitoring of depths via echo sounder to be manoeuvring of the vessel. Both anchors ready and crew standby
prioritized during arrival, and the speed kept at minimum speed to let go.
allowing full control of the vessel. When vessel is alongside the
ECDIS passage plan/track must be updated to correspond with the
actual track and spot soundings to be included in the ECDIS using
the MAPS function for future reference. In case the vessel can
depart without waiving CATZOC it is recommended to depart using
a track in order to obtain more soundings which can be plotted in
the MAP for the ECDIS and saved for future calls.
srvvesselapp01:5000/work/riskassessments/view/384 1/5
12/6/2020 Health and Safety at Sea
Instruction
Navigate with lowest possible speed allowing a safe manoeuvring
of the vessel.
Vessel is double hull with ballast tanks and voids spaces protecting
cargo tanks. Some bunker tanks might be exposed to damages in
the event of a grounding.
Instruction
In the event of main engine stopping the vessel must be
navigated towards safe area using the inertia as well as
All manoeuvring equipment (main engine, rudder etc to be tested environmental conditions. Anchors ready to let go and crew
prior arrival/approach, both normal command standby on forecastle Limitations for sea, swell, wind and
but also local control Latest weather forecast obtained by SPOS, current to be assessed and defined in the Management of
Sat C and local weather institute change, and in the event the prevailing conditions exceeds these
limitation the transit/approach/arrival/departure must be aborted
and postponed until the conditions are within limits.
srvvesselapp01:5000/work/riskassessments/view/384 2/5
12/6/2020 Health and Safety at Sea
Instruction
Equipment to be tested prior arrival/approach
Instruction
Echo sounder in operation and bridge team monitoring the
actual depth. Bridge team to be vigilant and constantly updated and
Updated and recent Information from Operations, Charterer, aware on vessel position versus shallow spots and danger areas.
Agent, Port Authorities and Pilot to be obtained. Past experience Abort and return to safe waters if depths are less than anticipated.
from transit/approach/arrival/departure at the port to be obtained
from the company; i.e. ECDIS track from other vessels if available,
experiences from other vessels etc.
srvvesselapp01:5000/work/riskassessments/view/384 3/5
12/6/2020 Health and Safety at Sea
Instruction
Spare rope available replacement of tug line. Heaving lines ready
and crew standby on mooring decks
Tug(s) to avoid excessive force on tug line. Heaving lines and
mooring lines on deck ready to be send ashore to assist in
controlling vessel movements and have vessel brought safely
alongside.
Weather
Yes Regular check for weather conditions via SPOS and EGC messages.
conditions
Noise Crew member to keep clear of noisy conditions to ensure a safe and clear communication. All requests and
Yes
conditions orders to be acknowledged by repeating it to the sender
Cargo related
No
matters
Geographical conditions might require special precautions to the limitations for sea, swell, wind and current
Geographic Yes
as the port might be exposed.
AS PER THE INFORMATION FROM AGENTS, CHANNEL MAX SAFE DRAFT FOR AGEO BERTH IS 12.20M.
srvvesselapp01:5000/work/riskassessments/view/384 4/5
12/6/2020 Health and Safety at Sea
6 Catastrophic 6 Low risk 12 Medium risk 18 High risk 24 High risk 30 High risk 36 High risk
5 Major 5 Low risk 10 Medium risk 15 Medium risk 20 High risk 25 High risk 30 High risk
4 Serious 4 Low risk 8 Medium risk 12 Medium risk 16 Medium risk 20 High risk 24 High risk
3 Moderate 3 Low risk 6 Low risk 9 Medium risk 12 Medium risk 15 Medium risk 18 High risk
2 Minor 2 Low risk 4 Low risk 6 Low risk 8 Medium risk 10 Medium risk 12 Medium risk
1 Negligible 1 Low risk 2 Low risk 3 Low risk 4 Low risk 5 Low risk 6 Low risk
Risk Legends
1-6
Low risk
May be acceptable; however, review task to see if risk can be reduced further.
7 - 17
Medium risk
Task should only proceed with appropriate authorisation by shore management. Where possible, the task should be redefined to take account of the
hazards involved or the risk should be reduced further prior to task commencement. Approval from Head of Technical Department or 2 VGM or 1 VGM &
DPA
18 - 36
High risk
Task must not proceed. It should be redefined or further control measures put in place to reduce risk. The controls should be re-assessed for adequacy
srvvesselapp01:5000/work/riskassessments/view/384 5/5