RISK RISK
Instruction
job involve immobilisation of engine for more than 6 hours .
continuous monitoring of weather condition & weather forecast
vessel at anchorage and same discussed with master and deck required.
officers.
RISK 2 : ENVIRONMENT - VESSEL WILL NOT ABLE TO PROCEED OUT TO SEA IF WEATHER DETERIORATE
RISK RISK
Instruction
Weather condition and broadcast continuously monitored on
SPOS and SAT C
Weather condition and forecast to be checked before starting the
work.
srvvesselapp01:5000/work/riskassessments/view/19 1/4
07/10/2020 Health and Safety at Sea
RISK RISK
Instruction
Use leather gloves while contacting hot surfaces.
RISK 4 : ENVIRONMENT - INJURY TO PERSONNEL DUE TO EXPOSURE TO HOT WATER , FUEL & HOT SURFACES
RISK RISK
Instruction
Confirm personnel protective equipment to be used from PPE
matrix.
All personnel to wear proper PPE. Lifting gears to be inspected
before using.
RISK 5 : ENVIRONMENT - INJURY DUE TO HANGING WEIGHTS WHILE DOING CRANE OPERATION
RISK RISK
Instruction
all personal to stay clear of the overhanging weights, only one
person to give instruction to crane operator.
One person to be incahrge of crane operations only. should be in
a postion to view the whole work area & should not be involved
in any other job.
srvvesselapp01:5000/work/riskassessments/view/19 2/4
07/10/2020 Health and Safety at Sea
RISK RISK
Instruction
Any oil Or water spill must be cleaned immediately . proper work
posture to be adopted while carrying out the job.
All personal must take care of their posture & work area
cleanliness.
srvvesselapp01:5000/work/riskassessments/view/19 3/4
07/10/2020 Health and Safety at Sea
6 Catastrophic 6 Low risk 12 Medium risk 18 High risk 24 High risk 30 High risk 36 High risk
5 Major 5 Low risk 10 Medium risk 15 Medium risk 20 High risk 25 High risk 30 High risk
4 Serious 4 Low risk 8 Medium risk 12 Medium risk 16 Medium risk 20 High risk 24 High risk
3 Moderate 3 Low risk 6 Low risk 9 Medium risk 12 Medium risk 15 Medium risk 18 High risk
2 Minor 2 Low risk 4 Low risk 6 Low risk 8 Medium risk 10 Medium risk 12 Medium risk
1 Negligible 1 Low risk 2 Low risk 3 Low risk 4 Low risk 5 Low risk 6 Low risk
Risk Legends
1-6
Low risk
May be acceptable; however, review task to see if risk can be reduced further.
7 - 17
Medium risk
Task should only proceed with appropriate authorisation by shore management. Where possible, the task should be redefined to take account of
the hazards involved or the risk should be reduced further prior to task commencement. Approval from Head of Technical Department or 2 VGM or
18 - 36
High risk
Task must not proceed. It should be redefined or further control measures put in place to reduce risk. The controls should be re-assessed for