SITE MEMO-To Construct RC Plinth For Pump at Level 5, Pump Room

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
ORANGEBEAM CONSTRUCTION Sdn. Bhd. Doc.Ret.: SLPPCJV/140/PQHSEP/SM. Page 1 of | SITE MEMO Project: Hospital Pendang Site Tel No.: 04 - 759 5882 Project Ret. : OBC/140 Site Fax No. Ho [Deiik Venture San. Bhd From [ORANGEBEAM Construction Sdn laifention —|En. Rasidi /En. Nawowi Date 21272020 HetNo.__- Reference No, _JOBC/140/ewaa/ALLISMT OF 86 FoxNo. Pages 2_lincluding this page) TICK FOR Tick FOR information [Comments T__|immediate Action [Approval Reference v [Construction Record [as Request Ret : To construct RC plinth for pump at Level 5, pump room ‘We refer to above matter and attached part plan, please construct the RC plinth as per highlighted area {follow the RC plinth detail shown inside construction drawing, Please refer to OBCSB site representative if the any queries, Regard [MOHD RIFDIE BIN MOHD SOPIAN syatiq, Project Manager lec. ¥Jxaicm En, Zainal Azhar b Zainuddin [4] contract: &n. Muhammad Hilmi b Kasim PM vjcm En, Daud Abu Hashim: RE (C&S) RA(ARC) a ——— —— LULU 2) WEL I ILL LILITH ULL I ’ LL ict Fr TTT TT ca n ta) resol eso Ss Ley et lt ee ky ft x4 ME ie Nin St = (Cem lm et HES

You might also like