Al Ghurair Real Estate

Tender Package 03 - Changes Made in Drawings and BOQ as per DM Comments

Al Mankool 317-1003

Ramp from GF to B1 amended to ensure constant slope @ 1:12


Architectural
Speed Hump Added

Roof Water tank capacity revised


Water Supply Water supply pipe work and valves
Allow for treatment of condensated water before distribution

Drip Tray to Attic slab


Drainage Drainage pipe work revisions

CO Sensors added
HVAC Chilled water pipe work revisions

Al Mankool 317-1000

ARCHITECTURE
Basement traffic circulation directions and radiuses adjusted
speed bumps added
ramp exit location / drain adjusted
domestic water tanks and water pumps relocated
corners of both lift lobbies adjusted

Ground level traffic circulation directions and radiuses adjusted


speed bumps added
guard house eliminated
2x doors in substation eliminated
electric room corner adjusted
garbage room corner adjusted
1x handicap parking added

Level 1 Landscaped courtyard planters eliminated


all apartment shafts adjacent to corridor moved 20mm inside
all common shafts adjacent to corridor reduced 20mm
shafts located in studios behind shower were slightly relocated to increase shower size

Typical level all apartment shafts adjacent to corridor moved 20mm inside
all common shafts adjacent to corridor reduced 20mm
shafts located in studios behind shower were slightly relocated to increase shower size

Roof Deck "Resident's Lounge" renamed to "Female Gym"


Door to male toiled relocated to open from inside female gym
"Male toilet" is now "Female toilet" and vice versa

STRUCTURE
New Column name C3BB introduce along grid B-2 & B-4'
New Column C10 and beams-FB6-RB7 introduce along grid L-1 in exchange of Shear wall-W2C
beams FB1 and RB1
Small Shaft Openings shifted along Grid-6' to Grids D-H.

LANDSCAPE
No changes from Tender Rev 02

MEP
Mechanical 1. ground floor basement ventilation has been added
2. 1 no primary standby pump has been added.

Drainage 1. sump location changed.


2. seperation of high level and low level drainage changes.

Electrical 1. Power added for 1 no. of primary standby pump


2. Power added for ground floor ventilation fan
3. Electrical service drawings updated as per revised location of water tank and driveway
4. Basement Telephone incoming cable tray size revised