NO KONTRAKTOR COORDINATOR EMAIL

1 HIVE PAK PRISKO prisko.galaxy@colliers.c

2 TRIMATRA PAK PRISKO prisko.galaxy@colliers.c


3 WBP PAK RINALDI / PAK INDRA
4 TRADEINDO PAK PRISKO prisko.galaxy@colliers.c
5 ASRI PAK INDRA
6 RMK PAK INDRA
7 KIRANA PAK RINALDI / PAK INDRA
8 KARUNACON PAK INDRA
9 HAP PAK RINALDI / PAK INDRA
10 TAWADA PAK MUGINO mugino@euroasiatic.com
11 GREENSHIP BU RANA rana.nafisa@colliers.com
12 ADEMCO PAK ERIK
13 DATA SYSTEM PAK ERIK
14 SWADAYA PAK MUGINO mugino@euroasiatic.com
15 DWIJAYA PAK MUGINO mugino@euroasiatic.com
16 MACHESA PAK MUGINO mugino@euroasiatic.com
17 IKP BU RANA rana.nafisa@colliers.com
16 SML PAK MUGINO /ERIK
17 SML PAK MUGINO /ERIK

Pak Rahmat 082170960667 Rahmat.Alam@colliers.com


Pak Prisko 081219886066 prisko.galaxy@colliers.com
Bu Rana 081311455569 rana.nafisa@colliers.com
Pak Ilyas 08122016022 ilyas.pradiwa@colliers.com
Pak Jarot 081318820309 jarot@technicalsoutheastasia.com
Pak Mugino 081311243072 mugino@euroasiatic.com
Pak Renaldi 081286862885 m.rinaldi@euroasiatic.com
Pak Indra 081210292407 indra.fandi@euroasiatic.com
Pak Erik 085691772274 egunawan@technicalsoutheastasia.com

Coordinator
review shopdwg, BQ & schedule
monitoring design, schedule dan BQ
koordinasi dgn user & kontraktor
Pengajuan approval dwg ke user
Review & approve PTW
Draft COR
Draft SI (kerja tambah / kurang)
Koordinasi dgn project admin untuk pembuatan COR dan SI

Site manager
review shopdwg, BQ & schedule
koordinasi dgn user & kontraktor
Koordinasi antar kontraktor
Review & approve PTW
Monitoring schedule
Lead meeting coordination dgn kontraktor
Review COR dan SI

Weekly meeting all contractors


Meeting internal contractor
TBM tiap senin
HSE patrol
No. HP
081219886066 v

081219886066 v

081219886066

081311243072
081311455569
085691772274
085691772274
081311243072
081311243072
081311243072
081311455569

@colliers.com
@colliers.com
colliers.com
@colliers.com
calsoutheastasia.com
oasiatic.com
uroasiatic.com
euroasiatic.com
echnicalsoutheastasia.com
Project Manager Arthur
Site Manager Yongki
SPV Salim
Drafter
Admin Dewi
HSE Indra

Outstanding works
PT. HIVE ERA (PT. Hexagonal Indonesia Visi Eramandiri)

NO WORK ITEMS AREA/LOCATION

A MAIN OFFICE
Railing tangga atrium
Pintu Container Auditorium
Listplank gypsum tambahan Lift
Bongkar keramik bordes lantai 3 tangga atirum Atrium
Tutup gawangan diding compartment Compartment wall GF
Meja fotokopi Photocopy area GF,2F, 4F
Kaca R. Direktur R. Direktur sisi kanan 4F
Pole MEP R. IT R. IT 2F
Meja & cermin vanity Toilet wanita GF - 4F
Meja toilet disable Disable toilet GF-4F
Meja & partisi open pantry Open Pantry 2F
Scada room Scada 2F
Tanggulan spider lift Lift GF-4F
Pengadaan pipa air bersih dan air kotor pantry 4F Pantry 4F
Compartment wall cover Compartment wall GF
Meja resepsionis Resepsionis
Lemari presdir & direktur Main office 4F
Meja meeting Main Office GF Main office GF r. meeting

B ANNEX I
Railing tangga Tangga Annex 1
Cover plat besi beam tangga Tangga Annex 1
Meja fotokopi Photocopy area GF,2F, 3F, 4F
Meja & cermin vanity Toilet Wanita GF
Cover spandrel dengan expanded Area Pantry & Manager
Bongkar pasang plint area manager 3F Area Manager 3F

C ANNEX II
Pergeseran & penambahan partisi wiremesh managerArea Manager 2F

D CAFETARIA
Meja toilet disable Disable toilet GF
Meja & cermin vanity Toilet Wanita GF
Wastafel kitchen Kitchen

E SPORT & UTILITY


Pemasangan keramik lantai & dinding shower toilet sSports toilet 2F

F Warehouse
Meja besi TSEA TSEA Warehouse
Acian dinding warehouse D1 Warehouse D1
08159359741 design@hiveera.com; hafele@gmail.com
081312147645
0818715906

081646045424
085722469622

TARGET DATE ISSUE / OUTSTANDING

W1 Des 2020
TBD On progress klarifikasi harga
W4 Nov 2020 On progress
W4 Nov 2020 Menunggu penawaran harga
W4 Nov 2020 Menunggu CII rilis SI
TBD Menunggu schedule dari HIVE
TBD Untuk pintu menunggu penawaran closer di bawah pintu
W4 Nov 2020 Menunggu penawaran harga
6 minggu dari DP cair Menunggu PO rilis
6 minggu dari DP cair Menunggu PO rilis
TBD Menunggu penawaran harga
TBD Menunggu revisi gambar
TBD Menunggu CII rilis SI
TBD On progress klarifikasi harga
TBD Menunggu revisi gambar
TBD Menunggu revisi gambar
TBD Menunggu penawaran harga
TBD Markingan baru approve, on progress discuss design

9 minggu dari DP cair Menunggu PO rilis


TBD On progress klarifikasi harga
TBD Menunggu schedule dari HIVE
6 minggu dari DP cair Menunggu PO rilis
TBD Menunggu penawaran harga
W3 Nov 2020 Cek on site

TBD Menunggu kesiapan lokasi

6 minggu dari DP cair Menunggu PO rilis


6 minggu dari DP cair Menunggu PO rilis
W4 Nov 2020 On progress klarifikasi harga (ada penambahan instalasi pipa akibat
perubahan lokasi)

TBD On progress klarifikasi harga

TBD On progress klarifikasi harga


TBD Menunggu ceklist dengan owner
delay

update ?
update ?
update ?

update ?
update ?
Project Manager Supriyanto 0815-9273-893
Site Manager Dimdim Wardiman 082114111210
SPV Rio 087808484847
Drafter Revmen 081374347300
Admin Irma
HSE Rio 087808484847

Outstanding works
PT. Trimatra Tata Graha
NO WORK ITEMS AREA/LOCATION TARGET DATE
A VO 02
1 Finishing canopy 4 MAIN OFFICE 20-Nov-20

B VO 05
2 Revolving door MAIN OFFICE 15-Nov-20

C VO 01 - VO 06
1 Kaca exterior main office (lt.234) - area BAR W4 Nov 2020
D VO 07
1 ACP List plank Main Office - Lt. 3 & 4 25-Nov-20

2 Spider lift Main Office - Lt. 1 - 4 10-Dec-20

3 Bongkar-pasang ACP Main office - balkon lt. 3 TBD

4 Stool B ANNEX I - Lt. 3 W4 Nov 2020

E VO 8
1 Canopy void ANNEX I 15-Nov-20

2 Class room Main Office TBD


3 Gawangan lift Main Office 7-Dec-20
4 Gawangan lift ANNEX I 15-Dec-20
maspriyanto65@gmail.com
dimdimwardiman19@gmail.com

engtmt.euroasiatic@gmail.com; revmen.trimatra@gmail.com

ISSUE / OUTSTANDING

Cleaning , sealent Delay - Update ?


25/11 : sealent sudah. Tinggal cleaning dan checklist --> 30 Nov

- Finish cat pintu --> target 15 Nov (3 pintu) --> 30Nov Delay - Update ?
- Finish GRC --> target TBC --> update 5 Nov. Kendala belum ada man power

Pemasangan backing spandrel Delay - Update ?

ACP onsite 20 Nov 2020 Delay - Update ?


25/11 : ada sprinkler, FU ke SML. Target 30 Nov selesai
Kaca onsite 16 November 33 lembar. Targer start pasang kaca 21 Nov 2020 --> 26 Nov Delay - Update ?

Revisi SI menjadi penutupan celah dengan ACP di main office 2F. Menunggu schedule
pemasangan ACP
SI HIVE sudah rilis Delay - Update ?

Kaca start onsite 23 Nov 2020 Delay - Update ?


25/11 : Trimatra update schedule

Hold, perlu assessment struktur. Desain belum final. Material hoollow sudah on site
Target pasang mockup 23 Nov 2020 --> 25 nov baru pasang mockup Delay - Update ?
Target pasang mockup 23 Nov 2020 --> 25 nov baru pasang mockup Delay - Update ?
Project Manager Asmara 08161670522
Site Manager Wisnu 081585270945
SPV N/A
Drafter N/A
Admin N/A
HSE N/A

Outstanding works
PT. TRADEINDO

NO WORK ITEMS AREA/LOCATION TARGET DATE

A MAIN OFFICE
1 Pole 1st FL N/A
2 Workstation 1st FL N/A
3 Louvre 1st FL N/A
4 Open Shelves 1st FL N/A
5 Pole 2nd FL DONE
6 Workstation 2nd FL DONE
7 Louvre 2nd FL 2-Dec-20
8 Open Shelves 2nd FL N/A
9 Pole 3rd FL N/A
10 Workstation 3rd FL N/A
11 Louvre 3rd FL N/A
12 Open Shelves 3rd FL N/A
13 Pole 4th FL DONE
14 Workstation 4th FL DONE
15 Louvre 4th FL 2-Dec-20
16 Open Shelves 4th FL N/A
B ANNEX I
1 Pole 1st FL, Area manager & b W1 Dec 2020
2 Workstation 1st FL, Area manager & b W1 Dec 2020
3 Louvre 1st FL 4-Dec-20
4 Open Shelves 1st FL 1-Dec-20
5 Pole 2nd FL DONE
6 Workstation 2nd FL DONE
7 Louvre 2nd FL 4-Dec-20
8 Open Shelves 2nd FL 1-Dec-20
9 Pole 3rd FL DONE
10 Workstation 3rd FL DONE
11 Louvre 3rd FL 4-Dec-20
12 Open Shelves 3rd FL 1-Dec-20
13 Pole 4th FL DONE
14 Workstation 4th FL DONE
15 Louvre 4th FL 4-Dec-20
16 Open Shelves 4th FL 1-Dec-20
C ANNEX II
1 Pole 1st FL DONE
2 Workstation 1st FL DONE
3 Louvre 1st FL 27-Nov-20
4 Open Shelves 1st FL 30-Nov-20
5 Pole 2nd FL DONE
6 Workstation 2nd FL TBD
7 Louvre 2nd FL 27-Nov-20
8 Open Shelves 2nd FL 30-Nov-20
9 Pole 3rd FL DONE
10 Workstation 3rd FL DONE
11 Louvre 3rd FL 27-Nov-20
12 Open Shelves 3rd FL 30-Nov-20
13 Pole 4th FL N/A
14 Workstation 4th FL N/A
15 Louvre 4th FL N/A
16 Open Shelves 4th FL N/A
asmara@tradeindo.com
wisnu@tradeindo.com

ISSUE / OUTSTANDING

Delay - update ?

Delay - update ?

menunggu instalasi kaca kanopi void & lampu selesai Delay - update ?
menunggu instalasi kaca kanopi void & lampu selesai Delay - update ?
Delay - update ?
Delay - update ?

Delay - update ?
Delay - update ?

Delay - update ?
Delay - update ?

Delay - update ?
Delay - update ?
Delay - update ?
Delay - update ?

Menunggu staff EA pindah lokasi


Delay - update ?
Delay - update ?

Delay - update ?
Delay - update ?

Delay - update ?
Delay - update ?
Project Manager Yanto
Site Manager N/A
SPV N/A
Drafter N/A
Admin Dona
HSE N/A

Outstanding works
PT. WIJAYA (WBP)
NO WORK ITEMS AREA/LOCATION

A MAIN OFFICE
Corrective defect Fasad

B ANNEX I
Corrective defect Fasad

C ANNEX II
Corrective defect Fasad & tangga

D CAFETARIA
Corrective defect Janggutan koridor luar Cafetaria 2F & 3F

E SPORT & UTILITY


Corective defect Fasad

All Work
087784729848 sabian.alkeinan01@gmail.com

085784935004 wbp_painting@yahoo.co.id

TARGET DATE ISSUE / OUTSTANDING

TBD Pembersihan cipratan cat Update ?


25/11 : Pak Prisko bantu bridging kontraktor WBP -
dengan Pak Rinaldi untuk pembahasan outstanding dan
corrective defect. Buat mapping dan list punchlist defect.
Jalan bareng pembahasan batasan scope pekerjaan WBP
--> siang 25/11

TBD Pembersihan cipratan cat Update ?

TBD Pembersihan cipratan cat (terutama area tangga) Update ?

TBD Textur & warna cat belang Update ?


Pembersihan cipratan cat

TBD Pembersihan cipratan cat (dinding & cladding Update ?

14/12: Menunggu man power Update ?


Project Manager Slamet asri_landscape@yahoo.com
Site Manager N/A asrijayaabadi@gmail.com
SPV Abu 087870254556
Drafter Riyadh 085782117980
Admin N/A
HSE N/A

Outstanding works
PT. ASRI

NO WORK ITEMS AREA/LOCATION TARGET DATE

1 Penanaman tanaman rambat daun dollar Pagar perimeter 18-Nov-20

2 Penanaman tanaman semak (pisang-pisangaPagar perimeter TBC

3 Re-design Westplaza West Plaza TBC

4 Penambahan tinggi tiang bendera posisi ten Flag pole 12-Nov-20

5 Penanaman tanaman semak & groundcover Lobby Entrance 21-Nov-20

6 Pemasangan batu andesit di area display Lobby Entrance TBC

7 Pek. Waterproofing Water feature (Innercourt) TBC


8 Pek. Pemasangan batu andesit Water feature (Innercourt) TBC

9 Pek. Pemasangan nozzle + pemipaan Water feature (Innercourt) TBC

10 Penanaman kamboja fosil --> additional worWater feature (Innercourt) TBC

11 Pek. Pemasangan batu andesit Container café TBC

12 Pek. Groundcover Container café TBC

13 Re-design Amphitheatre Amphitheatre 16-Nov-20

14 Pek. Pemasangan biopori Innercourt 19-Nov-20

15 Pek. Coating andesit Pedestrian 26-Nov-20

16 Pek. Bak sampah All area TBC

17 Finishing andesit di bawah canopy 4

18 Finishing rabat gedung di main office - annex 1

19 untuk penyiraman taman seperti apa desainnya


20 Other
cape@yahoo.com
adi@gmail.com

ISSUE / OUTSTANDING

tunggu pekerjaan finishing dinding RMK


25/11 : FU RMK untuk pemasangan geotextile --> 28 Nov
14/12: Tanaman sudah on site, target pengerjaan dalam 2 minggu (akhir tahun)

tunggu pekerjaan finishing dinding RMK


25/11 : target finishing dinding bagian dalam RMK --> 28 Nov
14/12: minta update schedule

Lihat penjelasan di email Ibu Mei, ajukan Shopdwg ke Ibu Stephanie untuk approval
25/11 : propose dwg masih review Ibu Stephanie
14/12 : Gambar masih direvisi oleh Asri, dan minta update jadwal pekerjaan

minta shopdwg ke ASRI untuk approval ke Ibu Stepahanie, no cost impact


25/11 : Diskusi dgn ASRI untuk propose pemotongan tiang bendera bagian kanan-kiri. ASRI
update schedule
14/12: Gambar dan schedule akan diajukan

Sesuai design, desain ada di link dwg


25/11 : submit dwg ke Bu Steph untuk approval --> 25/11
14/12 : sudah terpasang tanaman semak

Additional work --> update ke schedule ke ASRI


14/12 : Check status history dari Bu Mei,
Akan ada pengurangan area green yg akan dikoordinasi dg Greenship

tunggu RMK selesai relokasi pulau pohon


25/11 : RMK sudah planter box selesai. Cek desain dwg pemipaan di area water feature
14/12 : On going, minta update schedule
tunggu RMK selesai relokasi pulau pohon
14/12 : On going, minta update schedule
tunggu RMK selesai relokasi pulau pohon
14/12 : Masih menunggu

tunggu RMK selesai relokasi pulau pohon


25/11 : minggu ini akan survey untuk penanaman kamboja fossil
14/12 : akan survey, dan schedule survey perlu ditanya kembali

tunggu RMK selesai pekerjaan rumah pompa


25/11 : push RMK untuk pekerjaan tangga di rumah pompa
14/12 : Menunggu screeding tambahan tambahan

tunggu RMK selesai pekerjaan rumah pompa


25/11 : push RMK untuk pekerjaan tangga di rumah pompa
14/12 : Masih menunggu

Lihat penjelasan di email Ibu Mei, ASRI on going


25/11 : on going pekerjaan redesain --> target 26/11 done
14/12 : Done

Dilanjutkan sesuai posisi pemasangan biopori yang disetujui


25/11 : dibandingkan gambar awal titik biopori dengan perubahan yang sekarang
14/12 : hari ini manpower datang, target dan schedule di update

pekerjaan terakhir, setelah semua andesit terpasang


14/12 : ?

Lihat penjelasan di email Ibu Mei --> propose untuk takeout, provide by owner
25/11 : desain bak sampah serahkan ke ASRI apakah mereka mau mengerjakan/tidak
14/12 : belum ada update

rencana SI ke ASRI --> survey bersama dgn ASRi untuk pengajuan COR / SI
14/12 : material belum datang dan check tracking dari Bu Mei,
Penawaran minta dikirim di hari selasa

rencana SI ke ASRI --> survey bersama dgn ASRi untuk pengajuan COR / SI
14/12 : Akan dikasih ke contractor lain (CLOSED - BY OTHER)

cek antara desain dan BQ apakah sudah masuk pekerjaan kontraktor ?


14/12 : Design ditanya ke ASRI
14/12 : Semua tanaman akan selesai di akhir tahun (pohon2, dll)
Delay - update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?
Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?
Update ?
Project Manager Ivan Ignatius 087870828079
Site Manager N/A
SPV Odang 082113048196
Drafter N/A
Admin N/A
HSE N/A

Outstanding works
PT. RAJO MINANG KONSTRUKSI

NO WORK ITEMS AREA/LOCATION TARGET DATE

1 Repair dinding Pagar Perimeter 2-Dec-20

2 Finishing cat dinding Pagar Perimeter 2-Dec-20

3 Spike Pagar Perimeter 2-Dec-20

4 Geotextile Pagar Perimeter 19-Nov-20

5 Urugan tanah Pagar Perimeter 9-Nov-20

6 Finishing cat dinding Rumah B3 12-Nov-20

7 Tutup grill Rumah B3 12-Nov-20

8 Tutup lubang atap Rumah B3 12-Nov-20

9 Grendel pintu Rumah B3 12-Nov-20

10 Instalasi penerangan Rumah B3


11 Instalasi air bersih Rumah B3
12 Planter Box Water Feature 9-Nov-20

13 Pintu Shaft Annex I 12-Nov-20

14 Perbaikan pintu Ruang Genset 12-Nov-20

15 Tangga Rumah pompa 2-Dec-20

desain container di atas rumah pompa seperti apa ? --> perlu informasi bukaan pintu, instalasi elektrikal,

Other
ignatiusivanharyadi@gmail.com

ISSUE / OUTSTANDING

Ajak ibu checklist hasil repair


25/11 : done
outstanding di bagian yang nabrak ke pipa hydrant
14/12 : DONE, akan proses punchlist

Ajak ibu checklist hasil repair sebelum di cat


25/11 : RMK bisa mulai cat pagar bagian dalam sisi utara
14/12 : Done

Mockup sudah disetujui Ibu, kapan RMK mulai pasang ?


25/11 : info RMK hari ini material on site
14/12 : Done

Ajak ibu checklist pagar depan, kondisi planterboxnya


25/11 : FU RMK untuk dipasang minggu ini
14/12 : Done

Hanya urug tanah, finishing ground cover belum masuk scope kontraktor
25/11 : ajukan surat permohonan ke Sinarmas. Push RMK kapan schedule
mereka untuk pengambilan tanah di area sinarmas
14/12 : Done

25/11 : push RMK minggu ini selesai


14/12 : Done
25/11 : info RMk masih produksi, minggu ini harus terpasang
14/12 : Done

25/11 : push RMK minggu ini selesai


14/12 : Done
RMK minta ajukan propose type grendel
25/11 : Hari ini terpasang
14/12 : Done

Belum masuk scope kontraktor


Belum masuk scope kontraktor
25/11 : tinggal finishing, hari ini selesai
14/12 : Done

25/11 : info RMK sedang produksi, push minggu ini terpasang


14/12 : Done

25/11 : push RMK minggu ini selesai. Minta RMK kirim man power tambahan Update ?
14/12 : minta diperbaiki sampai beres. Finishing dinding belum rapi, warna
belum sama dengan existing

25/11 : on going
14/12 : Done

an pintu, instalasi elektrikal,

Proses Closing document dan Final Account


Project Manager Perdi 081388008881
Site Manager Satrio 082121308355
SPV Paul 085772966442
Drafter N/A
Admin N/A
HSE N/A --> karunacon harus provide dedicated PIC HSE

Outstanding works
PT. KARUNACON INDOTAMA

NO WORK ITEMS AREA/LOCATION TARGET DATE

A POLISHED CONCRETE
1 Polisher onsite

2 Cleaning area
3 Wiremesh
4 Screeding beton
5 Polished concrete

B SUPER ELEVATION
1 Persiapan Jalan selatan

2 Pekerjaan beton Jalan selatan

3 Kabel PLN
4 BA pekerjaan kurang dan persiapan
terhadap BQ
5 Other
karunacon.indotama@gmail.com
satriowahyunurhidayat475@gmail.com

con harus provide dedicated PIC HSE

ISSUE / OUTSTANDING

PO untuk purchasing polished concrete sudah release ke


Karunacon, bisa mulai proses pembelian material polish

Polished concrete bisa ulai setelas selesai BAF dan


instalasi plumbing kolam

Karunacon start setelah DP release dr EA, minta


Karunacon revisi schedule setelah DP keluar
14/12 : Done

Karunacon submit shopdwg jalan selatan


Karunacon submit shopdwg area warehouse
25/11 : mulai pekerjaan bobokan area dalam. Update ?
Sedang bobokan pinggiran warehouse, dekat rolling door.
Schedule penulangan ? Dan cor beton ?
Kabel listrik di jalan (milik PPE) belum diputus/dicabut.
Tunggu instruksi dari user
14/12 : Minggu ini selesai

Update ?
14/12 : Belum di pindah
Update ?
14/12 : Minta disiapkan
14/12 : pekerjaan di minggu ini akan selesai Update ?
Project Manager
Site Manager
SPV
Drafter
Admin
HSE

Outstanding works
CV. HASRTA ABADI PERKASA

NO WORK ITEMS

A KOLAM ATRIUM
1 PEK. SIPIL INSTALLASI PIPA KOLAM

2 PEK. INSTALLASI PIPA SUPPLY dari MAIN OFFICE ke KOLAM - KOLAM

3 PEK. INSTALLASI OVER FLOW dari KOLAM - KOLAM ke SUMP PIT

4 PEK. INSTALLASI PIPA INLET dari POMPA KOLAM ke AREA DALAM KOLAM

5 PEK. INSTALLASI PIPA PENGURASAN dari KOLAM - KOLAM ke SUMP PIT

6 TEST COMM PIPA TERPASANG

7 PEKERJAAN SUMP PIT (UK. 1500 x 1500 x 1000 mm)

8 EQUIPMENT & ACCESSORIES KOLAM dan SUMP PIT

9 PEK. ELEKTRIKAL & PANEL


B POS SECURITY - UTARA
1 PEKERJAAN STRUKTUR BAWAH

2 PEKERJAAN STRUKTUR ATAS

3 PEKERJAAN DINDING

4 PEKERJAAN ATAP

5 PEKERJAAN PINTU, JENDELA, LOVRE

6 PEKERJAAN CEILING

7 PEKERJAAN LANTAI

8 PEKERJAAN FINISHING

9 PEKERJAAN ELEKTRIKAL

10 PEKERJAAN PEMASANGAN HOLLOW & TURN STILE

11 PEKERJAAN BENCH

12 PEKERJAAN SLIDING GATE


C POS SECURITY - BARAT
1 PEKERJAAN STRUKTUR BAWAH

2 PEKERJAAN STRUKTUR ATAS

3 PEKERJAAN DINDING

4 PEKERJAAN ATAP

5 PEKERJAAN PINTU, JENDELA, LOVRE

6 PEKERJAAN LANTAI

7 PEKERJAAN FINISHING

8 PEKERJAAN SLIDING GATE


9 PEKERJAAN ELEKTRIKAL

10 PEKERJAAN PLUMBING
Riswanto 087880258332 riswanto.tato@gmail.com
N/A
N/A
N/A
Salsa 085860808801 agustiaslsa@gmail.com
Rizky 083821272468

AREA/LOCATION TARGET DATE ISSUE / OUTSTANDING

14-Oct-20 HAP buat mockup pemipaan


25/11 :
HAP belum submit dwg instalasi pipa (komposit) --> puch ke
Pak Riswanto - Done
HAP hari ini akan ambil pompa, disimpan di gudang HAP -
Belum diambil
14/12 : Minta submit revisi schedule,
setelah direview akan diajukan ke Bu Stephanie,
Kurang man power

21-Oct-20

21-Oct-20

28-Oct-20

28-Oct-20

16-Dec-20

4-Nov-20

25-Nov-20

2-Dec-20 Instalasi elektrikal ada 2 kontraktor (SML dan HAP), keluarkan


salah satu dari kontrak
28-Oct-20 14/12 : Done

4-Nov-20 14/12 : Done

25-Nov-20 Ibu Stephanie sudah approve Bu Stephanie.


14/12: design bukaan pintu dan jendela

18-Nov-20 Pakai atep existing / baru ? FU ke Bu Stephanie --> pake atap


baru
25/11 :
HAP belum ajukan material approval untuk atap --> 27 nov -
Belum

16-Dec-20 14/12 : Menunggu design final

23-Dec-20 14/12 : Belum

30-Dec-20 14/12 : Belum

2-Dec-20 14/12 : Belum

23-Dec-20 - Instalasi MEP konsep exposed sama dengan gedung utama


- Instalasi stop kontak, saklar dll ada di 2 BQ kontraktor (SML
dan HAP), take out salah satu
- Elektrikal connect ke panel lampu outdoor
- FU HAP propose gambar arsitektur, MEP (titik lampu, stop
kontak dll)
14/12 : Akan dikerjakan oleh SML

23-Dec-20 14/12 : Belum

23-Dec-20 14/12 : Belum

23-Dec-20 FU HAP propose gambar gerbang, turnstyle dan pintu lipat

Potong pohon sudah approved Sinarmas, dikerjakan oleh HAP


14/12 : No Issue
HAP proposes dwg area tangga ke area BERM, minta approval
ke Bu Steph dan pihak Sinarmas (Ibu Angela)
14/12 : Done

Ajukan ke sinarmas gambar rencana penambahan


jembatan, untuk mendapatkan approval tertulis
Cek ke Karunacon dan HAP untuk pengerjaan jembatan
tambahan
14/12 : Gambar belum masuk
Plot gambar box hydrant ke gambar layout, ajukan untuk
approval
14/12 : Done
Minta HAP buat gambar elektrikal : lampu, stop kontak, saklar,
dll -- By SML
FU ke HAP untuk gambar rencana pintu dan jendela
14/12 : Dikoordinasikan
Manhole existing (yg dalam) , cek HAP apakah bsa dimodif /
tidak ?

28-Oct-20 Titik pondasi perlu koordinasi dengan Ibu Marini untuk


perubahan titik. Desain struktur dari Ibu Marini
25/11 : FU ke HAP untuk submit drawing posisi pondasi sesuai
dengan kondisi actual lapangan --> 25/11 HAP submit revisi
dwg ke Bu Steph
14/12 : Done

4-Nov-20 14/12 : Baru gambar

25-Nov-20 14/12: design bukaan pintu dan jendela

23-Dec-20 14/12 : Belum

30-Dec-20 14/12 : Menunggu design final

2-Dec-20 14/12 : Belum

23-Dec-20 14/12 : Belum

23-Dec-20 FU HAP propose gambar gerbang


23-Dec-20 FU HAP propose gambar arsitektur, MEP (titik lampu, stop
kontak dll) -- By SML
23-Dec-20

Update ke Bu Stephanie untuk update/revisi schedule. Karena


ada klausul penalti di PO
Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?
Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?
Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?

Update ?
Update ?

Update ?
Project Manager Andre Gunawan 087880573126
Site Manager Aries 081222742535
SPV ???
Drafter ???
Admin ???
HSE ???

Outstanding works
PT. TAWADA CLEANTECH
Outstanding works TAWADA

NO WORK ITEMS AREA/LOCATION TARGET DATE

A MAIN OFFICE - ATRIUM End Dec 2020


1 Perkuatan struktur
2 Instalasi kabel CAT5
3 Instalasi kabel power (by SML)
4 Setting controller
5 Setting panel VFC
6 Install FAN 1 (20 FT)
7 Install FAN 2 (24 FT)
8 Termination DB V'AC - VFC
9 Termination VFC - FAN
10 Termination Controller - FAN
B MAIN OFFICE - LOBBY End Dec 2020
1 Instalasi kabel CAT5
2 Instalasi kabel power (by SML)
3 Setting controller
4 Setting panel VFC
5 Install FAN 3 (12 FT)
6 Install FAN 4 (12 FT)
7 Termination DB V'AC - VFC
8 Termination VFC - FAN
9 Termination Controller - FAN
andre@tawadacleantech.com

ISSUE / OUTSTANDING

Update ?
Proses nego
Proses nego
Proses nego
Proses nego
Proses nego
Proses nego
Proses nego
Proses nego
Proses nego
Proses nego
Update ?
Proses nego
Proses nego
Proses nego
Proses nego
Proses nego
Proses nego
Proses nego
Proses nego
Proses nego
Project Manager Afrizal 081113908567
Site Manager Roi Manulang 085813751395
SPV N/A
Drafter N/A
Admin Enggar Kaneko 082114567896
HSE Fuam 085715394047

Outstanding works
PT. ADEMCO SECURITY INDONESIA
Outstanding works ADEMCO

NO WORK ITEMS AREA/LOCATION TARGET DATE


Access Control & Time Attandance : 85%
CCTV : 69%
Booking Meeting : 5%
Meel Allowance : 39%

A MAIN OFFICE
1 Access Control 1st FL W-4 Nov 2020

2 Time Attendance 1st FL W-1 Dec 2020

3 CCTV 1st FL W-4 Nov 2020

4 Meeting Booking 1st FL W-1 Dec 2020

5 Access Control 2nd FL W-4 Nov 2020

6 Time Attendance 2nd FL


7 CCTV 2nd FL W-4 Nov 2020
8 Access Control 3rd FL W-4 Nov 2020
9 Time Attendance 3rd FL
10 CCTV 3rd FL
11 Access Control 4th FL W-4 Nov 2020

12 Time Attendance 4th FL


13 CCTV 4th FL W-4 Nov 2020

B ANNEX I
1 Access Control 1st FL
2 Time Attendance 1st FL
3 CCTV 1st FL
4 Access Control 2nd FL
5 Time Attendance 2nd FL
6 CCTV 2nd FL

7 Access Control 3rd FL


8 Time Attendance 3rd FL
9 CCTV 3rd FL

10 Access Control 4th FL


11 Time Attendance 4th FL
12 CCTV 4th FL
C ANNEX II
1 Access Control 1st FL
2 Time Attendance 1st FL
3 CCTV 1st FL
4 Access Control 2nd FL
5 Time Attendance 2nd FL
6 CCTV 2nd FL
7 Access Control 3rd FL
8 Time Attendance 3rd FL
9 CCTV 3rd FL
10 Access Control 4th FL
11 Time Attendance 4th FL
12 CCTV 4th FL
D CAFETARIA
1 Access Control 1st FL TBD

2 Time Attendance 1st FL


3 CCTV 1st FL TBD

4 POS (Kitchen) 1st FL TBD

5 Access Control 2nd FL


6 Time Attendance 2nd FL
7 CCTV 2nd FL Belum cek
8 Access Control 3rd FL
9 Time Attendance 3rd FL
10 CCTV 3rd FL Belum cek
E SPORT & UTILITY
1 Access Control 1st FL
2 Time Attendance 1st FL
3 CCTV 1st FL
4 Access Control 2nd FL
5 Time Attendance 2nd FL
6 CCTV 2nd FL

F WH - AREA PAK HERMAN


1 Access Control 1st FL
2 Time Attendance 1st FL
3 CCTV 1st FL
G WH - AREA TSEA
1 Access Control 1st FL W-4 Nov 2020

2 Time Attendance 1st FL


3 CCTV 1st FL

H WH - AREA D1 & D2
1 Access Control 1st FL
2 Time Attendance 1st FL
3 CCTV 1st FL TBD

I WH - 2nd FL
1 Access Control 2nd FL
2 Time Attendance 2nd FL
3 CCTV 2nd FL
4 Defect Pipa W-3 Nov 2020

J WH - 3rd FL
1 Access Control 3rd FL
2 Time Attendance 3rd FL
3 CCTV 3rd FL
4 Defect Pipa W-3 Nov 2020
K WH - 4th FL
1 Access Control 4th FL
2 Time Attendance 4th FL
3 CCTV 4th FL
4 Defect Pipa W-3 Nov 2020
L WH - AREA EXISTING
1 Access Control 1st FL
2 Time Attendance 1st FL
3 CCTV 1st FL TBD

M WH - POS SECURITY (NORTH & WEST)


1 Access Control 1st FL
2 Time Attendance 1st FL
3 CCTV 1st FL

N EXTERIOR
1 Access Control 1st FL
2 Time Attendance 1st FL
3 CCTV 1st FL W-4 Nov 2020

TESTCOMM
1 Main Office
2 Annex I
3 Annex II
4 Sport
5 Cafetaria
6 Warehouse

7 Exterior
afrizal@ademcosecurity.com
roi.manulang@ademcosecurity.com

enggar.kaneko@ademcosecurity.com

ISSUE / OUTSTANDING

sisa 9 ttk di rg. Meeting, menunggu pemasangan booking meeting syst. Update ?
Kamis 12 Nov jam 10 ada test alat booking meeting (mockup)
25/11 : FU ademco untuk schedule pekerjaan
14/12 : Minggu ini akan marking di lapangan dan koordinasi jalur kabel

hanya ada di GF, 3 unit. Baru terpasang 1 unit. 2 masih pabrikasi pole. Update ?
Dok approval done. Pemasangan fix pole tunggu lantai poloshed
concrete
25/11 : sudah terpasang 2 unit, sisa 1 unit. Pole terpasang saat ini baru
temporary
14/12 : Sudah selesai kecuali Klem plat ke lantai dan pemindahan,
Bisa BAST bersarat

Belum dipasang karena area masih kotor debu Update ?


14/12 : Masih on progress (2/6 titik)

Meeting kamis bahas mockup Update ?


25/11 : FU ademco untuk schedule pekerjaan
14/12 : Akan marking di minggu ini

testcomm rabu 11 nov. hari ini semua titik terpasang Update ?


25/11 : 1 pintu dekat jembatan belum di test --> jadwalkan test fungsi
14/12 : Sudah semua, keluali 1 pintu belum di test

N/A
Done
Belum, bukan prioritas. Seluruhnya target akhir november Update ?
14/12 : Belum, masih nunggu box dari HIVE
N/A
N/A
Sisa 3 titik ( dekat jembatan, akses ke office dekat lift, dan depan lift) Update ?
25/11 : Ada instalasi kabel listrik kerja, menghalangi pemasangan CCTV
14/12 : Sisa 2 titik (Pintu belum terpasang di satu titik dekat akses ke
office dekat lift, dan 1 titik dekat tangga atrium)
Design pintu dari Hive

N/A
kurang 2 titik
25/11 : sisa 1 titik
14/12 : Done

Done
Done
Done
Done
N/A
Done, cabling data sistem belum dicek
Update ?
14/12 : Masih ada 1 titik yang belum terpasang area rooftop
N/A
Done, cabling data sistem belum dicek Update ?
25/11 : ada 1 titik kabel belum connect
14/12: akan dicheck

Done
N/A
Done

Done
Done
Done
Done
Done
Done
Done
Done
Done
Done
N/A
N/A
sisa 2 pintu, belum ada pintunya. Tunggu pekerjaan fit out interior Update ?
selesai
14/12 : Done kecuali pintu yang belum terpasang,
akan di exclude dari BAST

N/A
Tunggu pekerjaan fit out interior selesai Update ?

Tunggu pekerjaan fit out interior selesai Update ?


25/11 : perlu power outlet 3 titik. Perlu SI ke SML - Sudah masuk ke SI

Done
N/A
Done
Done
Done
Done

N/A
N/A
N/A
N/A
N/A
Terkendala site office Update ?
25/11 : koord dgn Ademco apakah bsa dikerjakan dengan bantuan
scaffolding

Done
Done
Done

Sisa satu titik (kerja tambah --> target TBC). On going


25/11 : W4 nov target sudah bisa testcomm
14/12: Done, meunggu testcomm

N/A
Done, cek defect ada salah hanger - Done
25/11 : ada perubahan bracket 2 ttk CCTV, target 29 Nov
14/12 : Done

N/A
N/A
TBD Update ?
25/11 : sisa 2 titik CCTV. Kendala koordinasi dengan Pak Herman
karena banyak barang2 milik EA. Minta Ademco kirim schedule
14/12 : W-3 Dec 2020

N/A
N/A
Done
OPEN

N/A
N/A
Done
OPEN

N/A
N/A
Done
OPEN

N/A
N/A
Ada 1 titik, schedule --> TBD Update ?
25/11 : outstandng area ex. TSEA/PPE (setelah TSEA pindah ke area
WH baru)
14/12 : W-3 Dec 2020

N/A
N/A
Ada 3 titik (utara dan barat), tunggu konstruksi selesai Update ?
25/11 : tarikan kabel utara sudah, barat belum
tarikan kabel di pos barat koord dengan HAP untuk galian sipil
14/12 : Ditargetkan minggu ini

N/A
N/A
20 titik, baru terpasang 1 titik. Target semuanya 30 nov selesai. Update ?
Instalasi kabel sudah selesai.
Drawing marking sudah ada approval Bu Stephanie
14/12 : selesai sekitar 6 atau 7 dari 19 titik
Hanya Lantai 2 Update ?
OPEN (belum dijadwalkan) Update ?
DONE
OPEN (belum dijadwalkan) Update ?
OPEN (belum dijadwalkan) Update ?
Hanya Area Pak Herman Office, Pantry & ToolShop Update ?
Area TSEA belum jadwal Open

OPEN Update ?
Project Manager Jefri 08121109995
Site Manager Warsito 081284781869
SPV N/A
Drafter N/A
Admin N/A
HSE N/A

Outstanding works
PT. DATA SISTEM GLOBAL TECHNOLOGI

NO WORK ITEMS AREA/LOCATION TARGET DATE

A MAIN OFFICE
1 Instalasi data meja meeting 1st FL W-3 Nov 2020

2 Outlet data meja 1st FL TBD

3 Outlet data dinding 1st FL W-4 Nov 2020

4 Instalasi CCTV 1st FL W-4 Nov 2020

5 Instalasi data 2nd FL


6 Outlet data meja 2nd FL W-4 Nov 2020

7 Outlet data dinding 2nd FL TBD


8 Instalasi CCTV 2nd FL
9 Instalasi data meja 3rd FL N/A
10 Outlet data meja 3rd FL N/A
11 Outlet data dinding 3rd FL N/A
12 Instalasi CCTV 3rd FL N/A

13 Instalasi data meja 4th FL TBD


14 Outlet data meja 4th FL TBD

15 Outlet data dinding 4th FL W-4 Nov 2020

16 Instalasi CCTV 4th FL W-4 Nov 2020

B ANNEX I
1 Instalasi data meja 1st FL

2 Outlet data meja 1st FL W-3 Nov 2020


3 Outlet data dinding 1st FL W-3 Nov 2020

4 Instalasi CCTV 1st FL


5 Instalasi data meja 2nd FL
6 Outlet data meja 2nd FL W-3 Nov 2020
7 Outlet data dinding 2nd FL W-3 Nov 2020

8 Instalasi CCTV 2nd FL


9 Instalasi data meja 3rd FL
10 Outlet data meja 3rd FL W-3 Nov 2020
11 Outlet data dinding 3rd FL W-3 Nov 2020

12 Instalasi CCTV 3rd FL

13 Instalasi data meja 4th FL


14 Outlet data meja 4th FL W-3 Nov 2020
15 Outlet data dinding 4th FL W-3 Nov 2020

16 Instalasi CCTV 4th FL


C ANNEX II
1 Instalasi data meja meeting 1st FL
2 Outlet data meja 1st FL
3 Outlet data dinding 1st FL
4 Instalasi CCTV 1st FL
5 Instalasi data meja meeting 2nd FL
6 Outlet data meja 2nd FL
7 Outlet data dinding 2nd FL
8 Instalasi CCTV 2nd FL
9 Instalasi data meja meeting 3rd FL
10 Outlet data meja 3rd FL
11 Outlet data dinding 3rd FL
12 Instalasi CCTV 3rd FL
13 Instalasi data meja meeting 4th FL
14 Outlet data meja 4th FL
15 Outlet data dinding 4th FL
16 Instalasi CCTV 4th FL
D SPORT & UTILITY
1 Instalasi CCTV di Sport
2
3
4

E WH - AREA PAK HERMAN


1 Instalasi data meja 1st FL
2 Outlet data meja 1st FL W-3 Nov 2020
3 Outlet data dinding 1st FL
4 Instalasi CCTV 1st FL
F WH - AREA TSEA
1 Instalasi data meja meeting 1st FL
2 Outlet data meja 1st FL W-4 Nov 2020
3 Outlet data dinding 1st FL W-4 Nov 2020

4 Instalasi CCTV 1st FL


G WH - AREA D1 & D2
1 Instalasi data meja 1st FL
2 Outlet data meja 1st FL
3 Outlet data dinding 1st FL
4 Instalasi CCTV 1st FL
H WH - 2nd FL
1 Instalasi data meja meeting 2nd FL
2 Outlet data meja 2nd FL
3 Outlet data dinding 2nd FL
4 Instalasi CCTV 2nd FL
I WH - 3rd FL
1 Instalasi data meja meeting 3rd FL
2 Outlet data meja 3rd FL
3 Outlet data dinding 3rd FL
4 Instalasi CCTV 3rd FL
J WH - 4th FL
1 Instalasi data meja meeting 4th FL
2 Outlet data meja 4th FL
3 Outlet data dinding 4th FL
4 Instalasi CCTV 4th FL
K WH - AREA EXISTING
1 Instalasi data meja meeting 1st FL
2 Outlet data meja 1st FL
3 Outlet data dinding 1st FL
4 Instalasi CCTV 1st FL
L WH - POS SECURITY (NORTH & WEST)
1 Instalasi data meja meeting 1st FL W-1 Des 2020

2 Outlet data meja 1st FL


3 Outlet data dinding 1st FL W-1 Des 2020
4 Instalasi CCTV 1st FL
M EXTERIOR
1 Access Control 1st FL
2 Time Attendance 1st FL
3 CCTV 1st FL
Ceklist material cabling untuk BAST 2
jefri.setiawan@datasistemglobal.com
warsito@datasistemglobal.com

ISSUE / OUTSTANDING

Sudah approve SI, material ready, belum dijadwalkan Update ?


25/11 : schedule mundur awal mgg depan 30/11 - Belum

Menunggu Ukuran Meja dan jalur menuju box penyimpanan outlet Update ?
14/12 : kooridnasi dg Interior

Approval ulang ke Ibu Stephanie untuk outlet di dinding ukuran Update ?


posisinya
25/11 : propose marking lapangan di gambar
14/12 : Masih belum ada approval untuk beberapa unit

Koneksi kabel ke posisi kamera di listplank (cek layout ademco 4 feb) - Update ?
Belum

DONE
Ruang manager wing kiri belum menunggu marking meja 2-D-095 --> Update ?
Fu ke SML untuk relokasi ducting
Ruang IT server menunggu pole dan meja
14/12 : Meja belum ada detail dan belum terpasang - Wing selatan

Scada room menunggu design interior - Belum Update ?


DONE

Instalasi printer di wing kiri (tambahan, sudah SI) belum turun Update ?
menunggu dinding interior.
25/11 : dinding sudah ada, minta datasistem schedulekan
pekerjaannya - Belum
14/12 : Minta update schedule
Ruang Direktur menunggu posisi meja - Belum Update ?
Ruang BOD & Meeting room BOD menunggu posisi meja - Belum
Bar menunggu posisi meja (IP Phone) - Belum

IP Phone Pantry Basah menunggu approval Update ?


Data di pantry kering approval posisi ulang
14/12 : Perlu drawing approval ke Bu Stephanie - Follow up

Perubahan posisi CCTV berdasarkan layout Ademco 4 Feb 2020, Update ?


14/12 : 1 titik kabel belum connect ke camera

Area kasir - Belum Update ?


rg. Manager 1 ttk - Belum,
2 WS depan tangga belum terpasang - Belum

Area Manager belum - Done Update ?


Area Printer belum Update ?
14/12 : belum
DONE
DONE
Area Manager belum - Done
Update ?
Area Printer belum, area pantry perlu approval ulang untuk posisi data
IP Phone
14/12 : belum
DONE
DONE
Area Manager belum - Done
Area Printer belum Update ?
14/12 : belum
Update ?
DONE, ada perubahan mengikuti posisi CCTV Ademco gambar 4 Feb
2020
14/12 : Belum
DONE
Area Manager belum - Done
Area Printer belum Update ?
14/12 : belum
DONE

DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE
DONE

DONE, CCTV belum terpasang Update ?

DONE
2 Unit lagi belum, masih standby di bawah pole --> DONE
DONE
DONE

DONE
Tarikan instalasi sudah siap, Menunggu posisi meja Update ?
Update ?
IP Phone di workshop area posisi perlu approval. Approval sudah ada
DONE

Area existing TSEA - 1 titik belum terpasang Update ?


N/A
N/A
DONE

N/A
N/A
DONE IP Phone
DONE

N/A
N/A
DONE IP Phone
DONE

N/A
N/A
DONE IP Phone
DONE
N/A
N/A
N/A
N/A

Pos North stand by di area hijau pos, Pos West instalasi belum Update ?
menyeberang
N/A
Approval posisi IP Phone, Monitor, CPU Update ?
Standby Update ?

N/A
N/A
DONE
Project Manager Tumpak 082111339155
Site Manager Sandy 081294234834
SPV Eko Prasetyo 082230798280
Drafter N/A
Admin N/A
HSE N/A

Outstanding works
PT. SWADAYA HARAPAN NUSANTARA

NO WORK ITEMS AREA/LOCATION TARGET DATE

1 Corrective defect
2 Test running

3 As build dwg
tumpak.sidabutar@shn.co.id
sandi.putro@shn.co.id

ISSUE / OUTSTANDING

Done, minta approval defect Ibu


Reschedule test running genset 5 Dec Update ?
25/11 : reschedule TBD, menunggu perbaikan radiator
genset

FU ke Pak Mario untuk approval ABD. Update ?


25/11 : ada comment dari Pak Mario, perlu revisi dari
Swadaya. Target resubmit 30 Nov

Swadaya cetak kalkir A1 untuk ABD jika sudah approval Update ?


Pak Mario

Name plate stainless kirimkan contoh ke Swadaya. --> 26 Update ?


Nov Pak Jarot kirim ke CII

Update ?
14/12: Sudah close semua, tinggal menunggu Testcomm
Project Manager
Site Manager
SPV
Drafter
Admin
HSE

Outstanding works
PT. DWIJAYA

NO WORK ITEMS AREA/LOCATION TARGET DATE


1 Permit IPAL STP Room
2 masa retensi 3 bulan dari Agustus
ISSUE / OUTSTANDING
DONE
FU kontraktor untuk BAST 2
25/11 : FU dwijaya untuk submit invoice
Closed
Project Manager Hendrik 08112316678
Site Manager Siswanto 087734941789
SPV Ihsan 087721852413
Drafter N/A
Admin Mulya 082120782507
HSE N/A

Outstanding works
MACHESA TECH

NO WORK ITEMS AREA/LOCATION TARGET DATE

A LIFT MAIN OFFICE


1 Gawangan opening - by Trimatra W2 Dec
2 Partisi kaca spider - by Trimatra
3 Cleaning lift pit W2 Nov
4 Perbaikan finishing railling TBD

5 SLO TBD

6 Setting current overload W2 Nov


7 Emergency call TBD

B LIFT ANNEX I
1 Instalasi lampu ruang mesin - by EA
2 Cleaning lift pit W2 Nov
3 SLO TBD

4 Setting current overload W2 Nov


5 Rubah bentuk tombol lift TBD

6 Emergency call TBD

7 Gawangan opening - by Trimatra W2 Dec


C LIFT WAREHOUSE
1 Instalasi lampu ruang mesin - by EA
2 Cleaning lift pit W2 Nov

3 SLO TBD

4 Setting current overload W2 Nov


5 Emergency call TBD

Jadwal training LIFT 27-Nov


hendri@machesaliftindo.com; info@machesaliftindo.com; gm@machesaliftindo.com

mulya.machesa@gmail.com

ISSUE / OUTSTANDING

DONE
TBD --> request baru . Target 27 Nov Update ?
14/12 : Target minggu ini
Machesa submit form untuk depnaker. Update ?
Machesa submit form ke EA 27 Nov
14/12 : Form ada di EA

DONE
instalasi by SML Update ?
25/11 : instalasi by Machesa, minta kirim penawaran
harga
14/12 : Penawaran ditargetkan minggu ini

DONE
Machesa submit form untuk depnaker. Update ?
Machesa submit form ke EA 27 Nov
14/12 : Form ada di EA

DONE
Request baru. Machesa akan ajukan cost ?? Update ?
25/11 : tidak ada stock di Machesa. Pengerjaan 1-2 bulan,
import dari China
14/12 : Tidak bisa tukar tambah, harus beli baru

instalasi by SML Update ?


25/11 : instalasi by Machesa, minta kirim penawaran
harga
Bongkar tombol oleh trimatra. Ajukan posisi tombol ke Bu
Stephanie
14/12 : gawangan stainless di Lt.1 ada yg gak rata - Follow
up ke Machesa
Masih ada di pintu folding Update ?
14/12 : akan di check
Machesa submit form untuk depnaker. Update ?
Machesa submit form ke EA 27 Nov
14/12 : Form ada di EA

FU ke Machesa Update ?
instalasi by SML Update ?
25/11 : instalasi by Machesa, minta kirim penawaran
harga

Defect cutting besi masih belum lurus Update ?


Update ?
14/12 : Issue - kaitan kunci folding door perlu perapihan
DONE
14/12 : Semua plastic harus dibuka dulu dan dicheck Update ?
Project Manager Ryan Deflin 081319770897 ryan.devlin@kiranakitchen.com
Site Manager N/A
SPV N/A
Drafter N/A
Admin Era 08129746149 supervisor.sm@kiranakitchen.com
HSE N/A

Outstanding works
PT. KIRANA KITCHEN

NO WORK ITEMS AREA/LOCATION TARGET DATE ISSUE / OUTSTANDING


1 Water heater Kitchen Ajukan approval ke Ibu posisi water heater dan instalasi
plumbing ke titik sink --> issue posisi kran air panas -
dingin. Dan type kran dishwash dan bucther&fruit
21/12 : Instalasi pipa air panas akan dikerjakan HIVE.
Target terpasang ?

2 Relokasi pipa gas Kitchen No cost impact ?? karena ada perubahan layout --> cek
kondisi layout saat tender dan forcon. Knp sampai perlu
perubahan instalasi gas
21/12 : tidak jadi direlokasi. Akan dipasangkan proteksi
thd pipa gas

3 Insect killer Kitchen Metode pemasangannya belum diterima oleh Ibu -->
kirana submit approval shopdwg metode pemasangan
insect killer
21/12 : submit ke KIRANA titik pemasangan insect killer

4 Cover gutter Kitchen 30-Nov-20 On going di workshop. Jika lewat akan kena penalti -->
tinggal action di lapangan. Kirana proposed pengerjaan
berbarengan dgn jadwal testcomm, relokasi pipa gas dan
insect killer. Durasi pengerjaan 7 hari
21/12 : KIRANA akan rework cover gutter yang tidak bisa
dipasang
5 Testing commissioning Kitchen Kirana tunggu instalasi listrik, koordinasi dengan Pak
Mario untuk supply listrik kebutuhan testcomm
25/11 : arrange meeting dengan tim Pak Mario dan
kontraktor
21/12 : testcomm akan dilakukan seteah lampu, stop
kontak, dan pipa air panas-dingin terpasang. Target : W1
Feb'21

Koordinasi dgn SSP untuk pemasangannya


6 Instalasi air bersih sink Kitchen 21/12 : akan dikerjakan HIVE. Target ?
7 Cleaning kitchen equipment Kitchen Sebelum serah terima

8 Gas detector ?? Kitchen Belum masuk scope kerja kontraktor --> sudah masuk ke
KIRANA, dan sudah terpasang di lapangan

Proteksi Pipa Gas 14/12: MK akan kooridnasi ke Pak Erus terkait pekerjaan
ini
21/12 : akan dikerjakan oleh KIRANA - no cost impact

Hallway akses trolley sampah 21/12 : posisi kitchen equipment akan disesuaikan
mengakomodasi hallway akses trolley sampah
Project Manager Ivan Agustunus 081212202616
Site Manager Rangga Samiaji 087780297655
SPV 1 - Electrical Dody 081393344363
SPV 2 - Mechanical Eddy 081299217544
SPV 3 - Fire Fighting Sarno 085695450524
SPV 4 - Electronic Dody 081393344363
Drafter Hamam
Admin Fajar 082299394418
HSE Fajar 0895636971992

Outstanding works
PT. SURYA MARGA LUHUR

Outstanding works di update di file SML

NO WORK ITEMS AREA/LOCATION TARGET DATE

ISSUE
Pipa hydrant perimeter utara perimeter utara
Pipa hydrant pos security utara pos security utara
Tray main office lt. 3
Speaker salah type

Roof fan bocor


Grill exhaust bocor
Lampu/titik sprinkler kitchen
Kabel Tray

FIRE FIGHTING
APAR Main Office
APAR Annex I
APAR Annex II
APAR Caffetaria
APAR Sport & Utility
Instalasi pipa hydrant & sprinkler Warehouse existing
OHB Pos Utara
Relokasi pipa hydrant Perimeter utara

HVAC
Instalasi roof fan Warehouse Existing
Pemasangan instalasi ducting area Warehouse Existing
Perubahan instalasi pipa refrigrant Main office
Perubahan instalasi pipa refrigrant gedung
annex 2 dan Warehouse Lt. 3 Annex II & Main Office
Perbaikan bocor grill/louvre ducting Warehouse lt 1 - 4
Perapihan dinding bekas pemasangan
grill/louvre fresh air Main office
Relokasi thermostat AC Main office

FIRE ALARM SYSTEM


Smoke detector Sport area
Smoke detector Warehouse existing

SOUND SYSTEM
Speaker Warehouse existing

ELECTRICAL
Stop kontak dinding Main Office - GF
Stop kontak dinding Main Office - 2nd FL
Stop kontak dinding Main Office - 3rd FL
Stop kontak dinding Main Office - 4thFL
Stop kontak dinding Annex I - GF
Stop kontak dinding Annex I - 2nd FL
Stop kontak dinding Annex I - 3rd FL
Stop kontak dinding Annex I - 4th FL
Stop kontak dinding Cafetaria - GF
Stop kontak dinding Kitchen
Stop kontak dinding Cafetaria - 2nd FL
Stop kontak dinding Cafetaria - 3rd FL
Stop kontak dinding Sport Utility - GF
Stop kontak dinding Sport Utility - 2nd FL
Stop kontak dinding WH - Pak Herman
Stop kontak dinding WH - TSEA
Stop kontak dinding WH - D1 & D2
Stop kontak dinding WH - Existing
Stop kontak dinding WH - 2nd FL
Stop kontak dinding WH - 3rd FL
Stop kontak dinding WH - 4th FL
Stop kontak dinding Pos Security - Utara
Stop kontak dinding Pos Security - Barat
Stop kontak dinding Shelter barat ??
Lampu & saklar Main Office - GF
Lampu & saklar Main Office - 2nd FL
Lampu & saklar Main Office - 3rd FL
Lampu & saklar Main Office - 4thFL
Lampu & saklar Annex I - GF
Lampu & saklar Annex I - 2nd FL
Lampu & saklar Annex I - 3rd FL
Lampu & saklar Annex I - 4th FL
Lampu & saklar Cafetaria - GF
Lampu & saklar Kitchen
Lampu & saklar Cafetaria - 2nd FL
Lampu & saklar Cafetaria - 3rd FL
Lampu & saklar Sport Utility - GF
Lampu & saklar Sport Utility - 2nd FL
Lampu & saklar WH - Pak Herman
Lampu & saklar WH - TSEA
Lampu & saklar WH - D1 & D2
Lampu & saklar WH - Existing
Lampu & saklar WH - 2nd FL
Lampu & saklar WH - 3rd FL
Lampu & saklar WH - 4th FL
Lampu & saklar Pos Security - Utara
Lampu & saklar Pos Security - Barat
Lampu & saklar Shelter barat ??
Lampu - Bollard green area
Lampu - Spotlight (pohon) all pohon
Lampu - Spotlight (pedestrian) all pedestrian
Lampu - Canopy all canopy
Lampu - Wall light Innercourt selatan
Lampu - PJU Jalan timur - barat
Lampu - Submersible water feature
Tray Main office - lt. 3
iv4n_ak79@yahoo.com; sml_euroasiatic@yahoo.com
ranggasamiaji@yahoo.com

ISSUE / OUTSTANDING

kronologis proses pengadaan speaker. PO - approval dwg - material on site


14/12: Sudah purchasing tanpa approval dari EA

14/12 : Masih ada kebocoran di sisi selatan dan utara warehouse

14/12 : Semua spesifikasi kabel tray akan dicheck di BQ, material approval
dan ditanya ke WTP (consultant)

Done
HOLD, tunggu finalisasi interior
Proses SI
Project Manager Deas 0811121526
Site Manager Winoza 081366415369
SPV
Drafter
Admin
HSE

Outstanding works
PT. INDO KARYA PERMATA

NO WORK ITEMS AREA/LOCATION TARGET DATE

Permit SLF
deas_anita@yahoo.com

ISSUE / OUTSTANDING

masih proses PO resmi Update ?


25/11 : revisi PO belum release ke IKP
Argo schedule start setelah dokumen lengkap

Schedule masih TBD, tunggu PO keluar Update ?


estimasi 6 bulan dari dokumen lengkap Update ?

14/12 : Dokumen masih dicompile oleh EA Update ?


Project Manager Ibu Dian 081383024178
Site Manager N/A
SPV N/A
Drafter N/A
Admin N/A
HSE N/A

Outstanding works
PT. ASDI (Greenship)

NO WORK ITEMS AREA/LOCATION TARGET DATE


1 As build DWG kontraktor

2 Mapping used material

3 Pengelolaan sampah pihak ke 3


dian.fitria@pt-asdi.com

ISSUE / OUTSTANDING
Baru masuk dari SSP Update ?
Belum :
Trimatra
SML
ASRI --> luasan area hijau
HIVE
RMK --> B3

Target Kamis --> 12 nov Update ?

tunggu konfirmasi dari Ibu Stephanie Update ?

Perlu surat pernyataan terkait material dari Tradeindo


NO KONTRAKTOR COORDINATOR EMAIL No. HP
1 HIVE PAK PRISKO
2 TRIMATRA PAK PRISKO prisko.galaxy@colliers.com 081219886066
3 TRADEINDO PAK PRISKO
4 ASRI PAK INDRA
5 RMK PAK INDRA indra.fandi@euroasiatic.com 081210292407
6 KARUNACON PAK INDRA
7 WBP PAK RINALDI / INDRA
8 KIRANA PAK RINALDI / INDRA m.rinaldi@euroasiatic.com 081286862885
9 HAP PAK RINALDI / INDRA
10 TAWADA PAK MUGINO
11 SWADAYA PAK MUGINO
12 DWIJAYA PAK MUGINO mugino@euroasiatic.com 081311243072
13 MACHESA PAK MUGINO
14 SML - Mechanical PAK MUGINO
15 ADEMCO PAK ERIK
16 DATA SYSTEM PAK ERIK egunawan@technicalsoutheastasia.com 085691772274
17 SML - Electrical & lighting PAK ERIK
18 IKP (SLF) BU RANA
rana.nafisa@colliers.com 081311455569
19 ASDI (GREENSHIP) BU RANA

Pak Rahmat
Pak Prisko
Bu Rana
Pak Ilyas
Pak Jarot
Pak Mugino
Pak Renaldi
Pak Indra
Pak Erik

Coordinator
review shopdwg, BQ & schedule
monitoring design, schedule dan BQ
koordinasi dgn user & kontraktor
Pengajuan approval dwg ke user
Review & approve PTW
Draft COR
Draft SI (kerja tambah / kurang)
Koordinasi dgn project admin untuk pembuatan COR dan SI

Site manager
review shopdwg, BQ & schedule
koordinasi dgn user & kontraktor
Koordinasi antar kontraktor
Review & approve PTW
Monitoring schedule
Lead meeting coordination dgn kontraktor
Review COR dan SI

Weekly meeting all contractors


Meeting internal contractor
TBM tiap senin
HSE patrol