OBJECTIVE FOR EXPRESSION OF INTEREST

To explore the global market for purchase/acquire newly built offshore jack up rigs,
meeting the Technical requirement as attached at Appendix 1.

SCOPE OF WORK FOR EXPRESSION OF INTEREST


To offer newly built offshore jack up rigs for sale, meeting the minimum Technical
requirement as attached at Appendix 1 Column A.

1 Newly built rig means, rigs under construction, rigs with completed construction but not
delivered & rigs which are delivered but not contracted/operated.

To provide technical details of the offered rig as per Appendix 1 Column B.


2

To provide build cost of each offered rig along with a cost analysis/component-wise
3 breakup.
Appendix 1
TECHNICAL SPECIFICATIONS OF CANTILEVER TYPE HIGH SPEC. OFFSHORE
JACK UP RIG

A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
1. Type of Rig 1. Owner/Manager:
2. Rig Name:
The Jack-up Rig(s) is/are to be of High
Specification, Cantilever type, Self- Type & Design:
elevating, Independent legs, which can 3. Classification:
operate round the year in weather conditions
prevailing in India Water. Rig should be Date of construction:
equipped with state of art equipment. 4. Length:
Breadth:
 Mast, Travelling Block & Crown 5. Displacement:
Block should have load capacity of Load Line Draft:
750 S.Ton
Operating Draft:
 Draw Works should have rated power
of 3000 HP
 Draw Works should have Disc Brake. 6. Design Criteria:
 Joy Stick Control
7. Limiting Factor
(a) for Field Tow:
(b) for Ocean Tow:

Mast capacity:
Draw Works HP:
Joy Stick control:
2. Design of Rig (For Foot Print) Design of Rig :
(a) MLT-116 C/ BMC-300
Or (b) Equivalent
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
3 Spud Can Spud Can
Spud Can pressure with full pre load should Spud Can Dimensions:
not exceed 39 Ton/Sq Meter.
Dia.
Maximum spud can diameter = 56 ft
Height:
Details of Spud Can Pressure:
4. Operating Water Depth Capability Operating Water Depth Capability:

Minimum Operating Water Depth: 30 feet Minimum Operating Water Depth:


Maximum Operating Water Depth: 300 feet Maximum Operating Water Depth:

5. Drilling Depth Capability 1) Drilling Unit:


a) Depth rating of rig:
Rig(s) should be capable of drilling b) Basis:
exploratory/ development, high angle wells up
to a depth of 25,000 ft and for operations
2) Hoisting equipment: -
including short drift side-track, long-drift side-
track, drain hole & multi-lateral hole drilling,
re-entry in the well and well control.
a) Mast (Derrick) Mfgr.
The Draw Works should have disc brake.
Size:
Load capacity:
Racking capacity

a) Draw works Mfgr.


Model:
Rated Power:

b) Crown Block
Mfgr.
Model:
Capacity:
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
c) Traveling Block
Mfgr.
Model:
capacity:

d) Drilling hook:
Mfgr.:
Model:
Capacity:

3) Drilling line
Size:
4) Rotating equipment
a) Rotary table
Mfgr -
Model:
size:

5) Disc Brake:

6) Iron roughneck:
6. Illumination Illumination
Illumination of light on various places on the
rig should be as per API RP 14F standard.
7. Leg Length Leg Length
a) Useable leg length below the Hull:
Total useable leg length below the hull b) Total leg Length:
should be minimum 360 feet (excluding leg c) Distance between Aft (Port & Star board) Leg
reserve) centers:
d) Distance between Forward and Aft (Port / Star
board) Leg centers:
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
f) Distance between Aft (Port / Star board) Leg
centers and Hull Stern Edge:
8. Jetting System Leg Jetting System:

The rig should be equipped with low High Pressure:


pressure and high-pressure leg jetting Low Pressure:
system. High pressure jetting should be of
minimum 1500 PSI.
(Specify Pressure rating):

9. Variable Load (excluding hook load) Variable load in Metric Tons (excluding hook load)

Variable load capacity, while in


Operation/Drilling Condition should be 2000 (a) During operating condition:
Metric Tons excluding hook load. (b) During Jacking/Afloat condition:
(c) During Storm condition:

(Final dead weight and lightship will be verified


after inclining tests only)
10. Cantilever Movement Cantilever Movement

Minimum longitudinal movement of


cantilever should be such that centre of Rotary Centre line movement from Stern of the
rotary table can be extended 70 ft. from the SHELL
stern of the rig. Minimum transverse i) LONGITUDINAL:
movement of the substructure should be such
that center of rotary table can be skidded 15 ii)TRANSVERSE FROM CENTRE LINE :
ft port & starboard side from center line of
the rig.
Distance rotary table centre to the edge of the outer
side of the rig floor

11. Jacking System 1) Jacking system:


Type:
Rack & pinion type.
Make:
Jacking speed:
No. of pinions:
Pinions capacity during
a) Storm:
b) Holding:
c) Jacking/Operation:
d) Emergency jacking:
e) Wedges if any:

2) Derrick Skidding system

Type: Rack & Pinion / Hydraulic /Others


Make:
Speed

3) Preload requirement/Capacity:
4) Mooring: -

a) Anchors
(i) No.
Size:
Type:
Condition:
4 Nos Anchor Racks
(ii) No.-------- Size--------Type---------Condition ---
---

b) Anchor Wire Line


No.
Length-
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
Size
type:
Condition:

c) Winch
No.
Type:
Power
Wire size:
Capacity

d) Other equipment
i) Buoys: , Pendants No. , Size: Length:
ii) Towing arrangement (describe):

12. Cellar & Texas Deck. Cellar & Texas Deck.

 Cellar Deck Cellar deck:


 Texas Deck
Texas Deck:
Note: Both the decks should be available on
the rig

13. Raw Water Pumps: Raw Water Pumps


Type:
Deep well Pumps at Raw Water Tower of Tower/ Hose reel/ Others:
adequate capacity.
i) Make: Capacity per day:
ii) Make: Capacity per day:
iii) Make: Capacity per day:
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
14. Accommodation Accommodation :

Air-conditioned accommodation for not less


than 100 persons. Quarter compliments :
Galley :
Hospital:
Office accommodation:

15. Pollution Control Equipment Pollution Control Equipment

Suitable Sewage Treatment Plant meeting Make:


required standards for the treated affluent
discharge.
As per MARPOL Convention.
16. Mud Pumps 1) Mud Pumps

3 Nos. Triplex Mud Pumps each rated for Details MP-1 MP-2 MP-3
minimum 2200 HP complete with suitable
supercharging pumps and suitable pulsation Mfgr
dampeners. Model
Input BHP
Available Liner
and Piston sizes
in Inch
Discharge (GPM)
as per Liner
Size(s)
Max. Pressure
(psi), as per liner
Size(s)
Details of
Pulsation
Dampeners
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
Details of
Supercharger
Pumps
Provision of Yes
Suction Strainer
and Dampeners

2) Rotary Hoses Details:


Nos: , Size: , Length:
Pressure Rating: Make :
End Connections:

17. Mud Mixing System: Details of Mud Mixing System


The system should consist of the following:
- a) LP Hoppers Qty:____ , Size:___
(a) Mud Mixing System consisting of 2 Nos.
Low Pressure Hoppers and electric motor Mud Mixing System:
driven suitable centrifugal pumps with
separate suction and discharge lines from / to b) Jet Shearing Device (provide Details):
each mud tank. c) Slug Pit:
d) Chemical Mixing Tanks:
(b) Jet shearing device e) Provision of Transfer Pumps:
(c ) Slug tank f) Mud Tanks: -
(d) Chemical mixing tanks Mud 1
1 2 3 4 5 6 7 8 9
Tank 0
(e) Suitable transfer pumps
Use Liquid Mud
(f) All mud tanks to be provided with mud
agitators, bottom guns and drill water, Dim
Seawater & Base oil supply lines. ensi
on
Total mud volume capacity excluding Base (m3)
oil tank should be approximately 3500
bbls. Volu
me
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
(bbls
)
(g) Additional 150 bbls capacity tank for
storage of environmental friendly spotting Agit
pills ator
Mud
(h) Facilities for handling SOBM: Gun
 Base Oil storage capacity – 800 Bbls s
 The elastomer of the rig should be suitable
for SOBM as per standard industry
practice. Total mud tank capacity excluding base oil tank:
 Rigs should be equipped with Verti G
Cutting Drier capable of reducing oil on
cuttings to less than 10%. g) Additional 150 bbls capacity tank for storage of
- Cuttings handling capacity – Min 60 environmental friendly spotting pills:
Tons/hr.)
- G Force upto 400 (h) Facilities for handling SOBM:
- Screw conveyor (Minimum size  Base Oil storage capacity:
 The elastomer of the rig should be suitable for
requirements - 9 Mtrs L) SOBM as per standard industry practice :
- Monopump for Cutting drier 01 no with  Rigs should be equipped with Verti G Cutting
Drier capable of reducing oil on cuttings to less
broad specs as follows: than 10% :
- Cuttings handling capacity – Min 60 Tons/hr.) :

- Explosion proof body - G Force upto 400 :

- Maximum speed (rpm) – 450 - Screw conveyor (Minimum size


requirements – 9 Mtrs L):
- Flow rate (max)– 40 m3 /hr (water)
- Monopump for Cutting drier 01 no with broad
- Drive system : Variator with motor specs as follows:
- Explosion proof body
Other SOBM requirements: - Maximum speed (rpm) – 450
- Drains from the rig floor to be installed - Flow rate (max)– 40 m3 /hr (water)
leading up to holding Pit/Tanks.
- Pressure washers and Mud vacuum for - Drive system : Variator with motor
SOBM cleaning
- Mud savers
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
- Flow meter to record receipt of Base oil Other SOBM requirements:
& SOBM
- Drains from the rig floor to be installed leading up
to holding Pit/Tanks.:
- Pressure washers and Mud vacuum for SOBM
cleaning:
- Mud savers:
- Flow meter to record receipt of Base oil & SOBM:
18. Mud Processing Equipment Mud Processing Equipment
SHALE SHAKERS
Mud Processing Equipment
a)Scalping type/Conventional type Shale
a) Shale Shaker
A suitable number of Scalping type Shakers Shakers
cascading into a minimum of four (4) Shale Mfgr.
Shakers or alternatively a minimum of four
(4) Nos. Shale Shakers with in-built Scalping Model :
type Shakers along with replacement Screens Capacity :
(API Screen No 20 to 270 as per API RP 13C
designation). Each Shaker should be capable 4 Sets Shale Shakers + 1 Mud Conditioner
of handling a minimum of 350 GPM using
Linear Motion Shale Shakers
API No. 120 screens when running 12.0ppg
water based mud. The Shale shakers must be
Linear / Balanced Elliptical / Progressive
Elliptical / Tuned Elliptical Motion shale Minimum G Force :-
shakers of NOV Brandt/ Thule/Derrick/ MI
Swaco/ Axiom make only
(b) Screen Washer : High Pressure Low Volume
Water Spray System :
Minimum G Force should be 6 G
(c) Degasser:-
(b) Screen Washer: High Pressure, low Mfgr.
volume water spray system.
Model:

(c) Degasser, capacity 800-1000 GPM Capacity-

(d) Mud Gas Separator (Poor Boy (d) Mud Gas separator : (poor-boy degasser)
Degasser)
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
Mfgr.:
Model:
Capacity:
(e) Centrifuge: Two Nos. Mud Centrifuge
with fully variable speed independent main
drive and back drive motors and a maximum (e) Centrifuge (Variable speed design)
G force of 1900G or more and with :

(i) Mfgr.
Bowl size – 14 inch to 18 inch Model:
Capacity:
Bowl speed (rpm) – 3000 or more (variable)
(ii)Mfgr.
Feed Volume –240 GPM or more
Model:
Capacity:

Two Nos. Mud Centrifuge with fully variable


speed independent main drive and back drive
motors and a maximum G force of 1900G or more
and with:
Bowl size – 14”
Maximum bowl speed (rpm) variable – 3200 rpm
Feed Volume – 240 GPM or more

(f) Mud Lab testing equipment - Rig


(f) Mud testing equipment:
should have an air conditioned mud
laboratory with all drilling fluid testing Rig should have a air conditioned mud laboratory
apparatus and a desk top computer with with all drilling fluid testing apparatus and a desk top
drilling fluid reporting system along with computer with drilling fluid reporting system along
printer. with printer.

(g) Brine filtration unit (optional) (g) Brine Filtration Unit as per specification
(optional): Available / Not available.
Details, if available
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
19. Trip Tank: One trip tank of adequate Trip Tank
capacity, complete with centrifugal pump
and mud level indicator readable from the Volume:
driller’s station, sensitivity ½ bbl Sensitivity: 1/2 bbl
Trip tank complete with Centrifugal pump & Mud
Level indicator readable from Driller’s station.

20. Top Drive System Details of Top Drive System – Electrical

Electric “Top Drive System” with all


accessories including pipe handler. Capacity a) Manufacturer:
750 st, Torque rating continuous 60,000 ft-
lbs Minimum. b) Model:

c) Capacity

d) Torque rating
i) Continuous:
ii) Intermittent

e) Power requirement:
Power:
Source:

f) Inside BOP: Rating


i) Upper:
ii) Lower:

g) Pipe Handler details:


Mfgr.
Model:
Tonnage Capacity:
Torque:
21. Rig Power and Power Management Power Plant:

The rig should have Power Packs having


minimum power of 8500 HP. (Excluding No. of Engines,
Emergency Generator) Mfgr.
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
Model:
Rig Power and Power Management: HP:

Rig should have AC-VFD power Other details:


management system
No. of Alternators:
Mfgr.
Minimum Power available at Bus Bar should
not be less than 7650 HP. Model:
HP:
Other details:

AC-VFD: -

Minimum Power available at bus bar:

Detail of Emergency Generator:


Mfgr.
Model:
HP:

22. Cranes Cranes

3 Deck-cranes of adequate boom length and


lifting capacity which can cover complete 1. Mfgr.
deck area/drill floor etc. Minimum lifting Type:
capacity of Port side crane - 45 T.
Load capacity:
Boom length:
2. Mfgr.
Type:
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
Load capacity:
Boom length:

3. Mfgr.
Type:
Load capacity:
Boom length:

23 Rotary Diverter: Rotary Diverter:

Mfgr: Vetco Model/Type KFDJ or equivalent Details


Size 49-1/2" Rating 500 PSI H2S Trim for
30” & 26” with side arms etc.,
24 Hydraulic Cat-head Hydraulic Cat Head Unit:

Drillco Ezy-Torque or equivalent, complete Mfgr.


with motor etc.
Model:
Capacity:
25 Choke and Kill Manifold Choke and Kill Manifold
Rig should be equipped with sour treated / Details to be provided:
H2S trimmed, 10,000 psi WP Choke & Kill
Manifold with minimum 4 nos. of Chokes,
out of which two should be Hydraulic and
two should be manual & complete with
Choke & Kill lines along with Remote
Choke Control Panel as per API Spec 16C,

26 BOP Control Unit BOP Control Unit


BOP Hydraulic Control Unit for operating all Details to be provided:
BOPs, Hydraulic Choke & Kill line Valves.
The rig should be equipped with two nos. of
BOP Remote Control Panels located at drill
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
floor & Tool Pusher’s office. The control
system should meet API recommendations.

27 Communication Equipment Communication Equipment:


a) As per MODU Compliance
a) As per MODU Compliance
List of communication equipment available
The bidder must provide list of onboard:-
communication equipment available
onboard.
b) All instrumentation required for b) All instrumentation required for Barge
Barge movement movement
Details to be provided:

28 Helipad Helicopter Deck Size:


Suitable for taking off / landing of : S-61 or MI-8
Helipad suitable for taking off and landing of helicopters-
S-61 or MI-8 helicopters.
Compliant to CAP 437 for night landing. Compliant to CAP 437 for night landing:
Details to be provided such as TDPM & H lights
and HAPI lights etc.

29 Safety Equipment and Fire Fighting Fire fighting equipment:


Equipment

All necessary fire fighting and safety 1. Provide complete details:


equipment as per the SOLAS and IMO
regulations should be on board. Bidder
should clearly specify in detail about the fire 2. Does it confirm to IMO/SOLAS regulations :
fighting equipment and safety equipment on
board.
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
30 Life Saving Equipment: Rig should be Life Saving Equipment
equipped with - Complete details to be provided.:

Life rafts, Life boats, Rescue boats, Life Does it confirm to IMO/SOLAS regulations :
Vests, Ring Life Buoys.

31 Compliances of Different Regulatory Body Compliances of Different Regulatory Body


Requirements : Bidder has to comply the Requirements as mentioned:
following
1) MODU Safety Certificate from concerned
classification society
2) Rig should be equipped with AIS
(Automated Information System) (ODAG)
3) Rig should be equipped with CCTV at
Helideck
4) International Oil Pollution Prevention
(IOPP) Certificate to be taken
5) Sewage Pollution Prevention (SPP)
Certificate to be taken

32 Drilling Instrumentation: Drilling Instrumentation:


Drilling Instrumentation System with digital Drilling instrumentation (list drilling recorders etc
display of all the drilling parameters (NOV installed) -
Rig Sense or equivalent)

Instruments Make Model


1. Weight indicator complete with suitable wire
line anchor.
2. Mud gauge assembly.
3. Tong torque indicating system.
4. Rotary RPM.
5. Rotary torque.
6. Mud pump SPM tachometer system.
7. Mud volume totalizer.
8. Mud flow fill and stroke indicating system
9. Pit level indicator.
10. Pen Recorder to record
Parameters which can be recorded; -
a. Weight.
b. Mud pressure.
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
c. Rotary torque.
d. Rotary rpm.
e. Mud pump SPM
f. Rate of penetration.

(v) Calibrated Flow Meters for diesel, Drill and


Potable water.
(vi) Welding Gen Sets, Gas Cutters, Torches and
accessories.
(vii) Cargo nets, cargo boxes, personnel baskets,
towing lines, hoses for transferring barites,
cement, potable water, drill water, diesel etc as
required should be provided.

Details of Storage Equipment:-


1. Drilling Water :
2. Fresh(Potable)Water :
3. Fuel Oil :
4. Dry bulk storage :
Cement ( Neat & Blended):
Silo No. 1 :
Silo No. 2 :
Silo No.3 :
Silo No.4 :
Barite :-
Silo No. 1 :
Silo No. 2 :
Silo No.3 :

5. Liquid Mud : _______bbls (Total Usable


Capacity)
6. Dry Sack Storage: _______ sacks
A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
33 Rig should be equipped with Detection Details to be provided:
equipments to detect Combustible & sour
gases as per international practices.
34 Ventilation and Air-conditioning System Ventilation and Air-conditioning System

Suitable ventilation and air-conditioning Details to be provided:


system.
35 Water-maker Water Maker
Type- Heat / RO/ Other
Water-maker(s) of minimum Total capacity
35 M.Tons per day.
1. Make :
Capacity in Metric Ton per day :

36 Cementing Unit: Details of Cementing Unit


Mfgr. Schlumberger / BJ /Halliburton

Mfgr.: Dowell Schlumberger / BJ / (Provide complete details) -


Halliburton

37 Rig should be equipped with – Rig should be equipped with –

(i) Transfer hoses on both port and starboard (i) Transfer hoses and its replacements on both sides
side and its replacements (Starboard & Port).
(ii) Mooring lines and its replacements (ii) Mooring lines and its replacements:
(iii) Oil and Gas burner boom assembly (iii) Oil and Gas burner boom assembly
38 1 year operational Spare parts for Details to be provided:
equipment / tool are to be provided for rig
operations.

39 Any other detail bidder likes to share:


A B
S. Minimum Technical Specification Details of the Rig to be filled by Rig
No. Owner/Seller
40 Any other equipment available onboard Details to be provided:

END OF SPECIFICATIONS

You might also like