Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

Equipment installation

instruction

Taizhou Bafu Machinery Co.,Ltd.


Mould parts
Step 01
• Installation the Feed Plate

1.1) Clean the base, no sundries allowed;


1.2) Install according to positioning hole;
1.3) Tighten with a wrench;
Step 02
• Installation the Bottom Plate

2.1) Turn the handwheel to a suitable position;


2.2) Place in the Bottom Plate and fix the screws;
Step 03
• Installation the Side Plate

3.1) Turn the handwheel to lower the rod;


3.2) Place in the Side Plate and fix the screws;
3.3) Keep a distance of 1-1.5 mm to the Feed Plate;
3.4)Align the edge with the slot;
Step 04
• Installation the Guide Block

4.1) Place in the Guide Block and fix the screws;


4.2) Align the edge with the slot;
4.3) Adjust the width of the guide;
Step 05
• Adjust the Guide Rail

5.1) Adjust the Guide Rail according the confection;


5.2) Adjust the height of cross-bar,height 1-2mm
to the confection;
Step 06
• Installation the Push Block and Stopper

6.1) Fasten the Push Block and Stopper;


6.2) Adjust the length let the confection goes into
the Feed Plate completely;
Step 07
• Installation the Top Plate

7.1) Place in the Top Plate and fix the screws;


7.2) Keep 1-2mm distance to the Confection;
Step 08
• Installation the Top Block

8.1) Turn the handwheel to upper the rod;


8.2) Fasten the Top Block;
Step 09
• Installation the Pressing Rod

9.1) Place in the Pressing Rod and fasten the screws;


9.2) Adjust the screw to maintain proper pressure to
the confection;
Step 10
• Installation the Frock Clamp

10.1) Place in one set of Frock Clamp on bottom side of the turnplate;
10.2) Turn the handwheel to turn the Top Block to the topper position;
10.3) Close the Frock Clamps, make the left and right spaces equal,
then fasten the screw and install the spring;
10.4) Install the other 3 sets in the same way;
Step 11
• Installation the Top Stereotyped Board

11.1) Installation the Top Stereotyped board;


11.2) Adjust the distance to the Flock Clamp as 1-
2mm and fasten the screw;
Step 12
• Installation the Top and Bottom Press Block

12.1) Installation the Top and Bottom Press Block;


12.2) Turn the handwheel to turn the Flock Clamp
to the topper position and the Top and Bottom
Press Block close to the confection;
12.3) Fasten the screw;
Step 13
• Installation the Lower Stereotyped Board

13.1) Installation the Lower Stereotyped board;


13.2) Turn the handwheel to turn the Top Block to
the topper position;
13.3) Adjust the position so that the spacing
between the sides is equal;
Step 14
• Installation the Push Block

14.1) Place in the Push Block and fix the screws;


14.2) The centers of Push Block and Frock Clamp
are kept level;
Step 15
• Installation the Origami Plate

15.1) Place in the Origami Plate and fasten the screws;


15.2) The center of Origami Plate is aligned with the
center of the confection and the spacing between the
sides is equal;
Step 16
• Installation the Pedestal and Shaper

16.1) Installation the Pedestal and Shaper;


16.2) The Shaper close to the confection and can
not affect the Folck Clamp, the spacing between
the sides is equal,then fasten the screw;
Step 17
• Installation the Paper Feeder

17.1) Place the paper feeder on the mounting position;


17.2) Connect the connecting rod of paper cutting
without tightening;
Step 18
• Installation the Lower Origami Plate

18.1) Place the Lower Origami Plate and fasten


the screws;
Step 19
• Installation the Left and Right Origami Plate

19.1) Place the Left and Right Origami Plate;


19.2) Adjust the distance let the Left and Right Origami
Plate not affect the Lower Origami Plate;
19.3) Fasten the screws;
Step 20-1
• Adjust the Paper Feeder

20-1.1) Adjust the height of the paper outlet,1-2mm above the


confection and fasten the screws;
20-1.2) Move the Paper Feeder to the marker and fasten the
screws on the bottom;
20-1.3) Adjust the blade distance 2-3mm,then faster the screw;
Step 20-2
• Adjust the Paper Feeder

20-2.1) Press the belt sheave and fasten the screws;


20-2.2) Connect the pressure air;
20-2.3) Adjust the blade distance 2-3mm,then faster the screw;
20-2.4) Installation the Color Mark Sensor;
Step 21
• Adjust the Spray Adhesive Head

22.1) Adjust the Spray Adhesive Head to the right


side and fasten the screw;
Step 22
• Installation the Hopper

22.1) Place in the Hopper Holer and fasten the screws;


22.2) Install the Hopper;

You might also like