Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

hitungan tukang

dinding samping upah 40.000


p1 p2 l t volume bata
tp 0.7 1.2 0.52 0.494
p 4 1.2 4.8
p 3.9 0.8 3.12
tp 1.85 0.8 1 1.325
p 1.85 2.75 5.0875
p 2.3 1.7 3.91
p 2.3 0.65 1.495
volume total 20.2315 m2
20.2315 x 40000 809,260

hitungan tukang
dinding samping upah 75.000
p1 p2 l t volume bata
sg 3.35 3.75 6.28125
tp 1.85 3.75 2.7 8.36
p 2.3 2.4 5.52
p 1.2 3.7 4.44
tp 1.55 2.25 1.1 2.09
p 0.4 2.25 0.9
p 0.8 1.5 1.2
tp 1.3 2.9 2.34 4.914
tp 2.3 2.9 0.4 1.04
sg 5.15 1.63 4.19725
volume total 38.9425 m2
38.9425 x 75000 2,920,688

ringbalk atas upah 40000


p1 satuan volume
0.8 m'
4
3.9
1
2.75
1.7
0.65
volume total 14.8
14.8 x 40000 592,000
ringbalk atas upah 50000
p1 satuan volume
5.03
3.35
3.2
0.4
2.3
1.2
1.5
0.4
1.5
2.9
0.8
2.4
3.2
2.8
30.98
30.98 x 50000 1,549,000

tiang kolom tambahan

2.3
2.3
2.9
2.4
9.9
9.9 x 45000 445,500
pasangan bata atas
p1 p2 l t volume bata
3.7 0.4 1.48
3.4 0.4 1.36
2 0.4 0.8
volume total 3.64 m2
3.64 x 75000 273,000

You might also like