Professional Documents
Culture Documents
Part Number Qty Material Descriptions Item
Part Number Qty Material Descriptions Item
D D
HLUD-MA
Project Title :
tiang Body Belakang
C - C
Client :
Approved : Date :
B 1 : 20 1 of 5 B
SIGN BY OWNER
Name :
Company :
Date :
APPROVED REJECTED
APPROVED WITH COMMENTS
Signature :
NOTE
MEASURES IN MILLIMETERS.
Assy Landing Frame Door Panel
File loc :
D:\EGI\2020\07. Home Lift Altura
Diamon\3D\2D\KIT\CABIN.iam
6 5 4 3 2 1
6 5 4 3 2 1
Item Descriptions Material Qty Part Number
Guide Rail CTW MS 2 mm 12 HLUD-HGCTW1
D D
Drawing No :
HLUD-HGCTW1
Project Title :
C C
Client :
Drawn : Date :
2400
East Gylet Intl 9/21/2020
116,10
Checked : Date :
Approved : Date :
A-A ( 1 : 2 )
Scale : Page Rev :
B 2400 1 : 10 2 of 5 B
10
SIGN BY OWNER
A Name :
Company :
Date :
40
APPROVED REJECTED
APPROVED WITH COMMENTS
A Signature :
46
NOTE
Warning: please consider the parts without
measures as provisional. In case you need
specific measurements please ask the CAD
dept.
A TOLERANCES IN THE SHAFT
PREDISPOSITION AND HOLES FOR A
LANDING DOORS: +20/-0mm.
MEASURES IN MILLIMETERS.
File loc :
D:\EGI\2020\07. Home Lift Altura
Diamon\3D\mechanizm\Guide Rail CTW.ipt
6 5 4 3 2 1
6 5 4 3 2 1
Item Descriptions Material Qty Part Number
Guide Rail CTW atas MS 2 mm 2 HLUD-HGCTW2
D D
Drawing No :
HLUD-HGCTW2
Project Title :
C C
Client :
116,10
Drawn : Date :
Approved : Date :
200 10
Scale : Page Rev :
B 1:2 3 of 5 B
SIGN BY OWNER
40
Name :
Company :
Date :
APPROVED REJECTED
20 APPROVED WITH COMMENTS
Signature :
NOTE
Warning: please consider the parts without
measures as provisional. In case you need
specific measurements please ask the CAD
dept.
A TOLERANCES IN THE SHAFT
PREDISPOSITION AND HOLES FOR A
LANDING DOORS: +20/-0mm.
MEASURES IN MILLIMETERS.
File loc :
D:\EGI\2020\07. Home Lift Altura
Diamon\3D\mechanizm\Guide Rail CTW atas.ipt
6 5 4 3 2 1
6 5 4 3 2 1
Item Descriptions Material Qty Part Number
fish plate ctw MS 5 mm 12 HLUD-HGCTW4
D D
Drawing No :
HLUD-HGCTW4
Project Title :
100
C C
Client :
Drawn : Date :
46
Checked : Date :
Approved : Date :
B 1:1 4 of 5 B
SIGN BY OWNER
Name :
Company :
Date :
APPROVED REJECTED
APPROVED WITH COMMENTS
Signature :
NOTE
Warning: please consider the parts without
measures as provisional. In case you need
specific measurements please ask the CAD
dept.
A TOLERANCES IN THE SHAFT
PREDISPOSITION AND HOLES FOR A
LANDING DOORS: +20/-0mm.
MEASURES IN MILLIMETERS.
File loc :
D:\EGI\2020\07. Home Lift Altura
Diamon\3D\mechanizm\fish plate ctw.ipt
6 5 4 3 2 1
6 5 4 3 2 1
Item Descriptions Material Qty Part Number
Guide Rail clip ctw Ms 2 mm 54 HLUD-HGCTW3
37,95
D D
20,00
Drawing Title :
Drawing No :
HLUD-HGCTW3
Project Title :
C - C
Client :
37 -
Drawn : Date :
Approved : Date :
B 3:1 5 of 5 B
SIGN BY OWNER
Name :
Company :
Date :
APPROVED REJECTED
APPROVED WITH COMMENTS
Signature :
15 NOTE
Warning: please consider the parts without
measures as provisional. In case you need
specific measurements please ask the CAD
4
dept.
A TOLERANCES IN THE SHAFT
PREDISPOSITION AND HOLES FOR A
LANDING DOORS: +20/-0mm.
135
° MEASURES IN MILLIMETERS.
20
File loc :
D:\EGI\2020\07. Home Lift Altura Diamon\3D\Guide
Rail clip ctw.ipt
6 5 4 3 2 1