No. Inspection activity Performed
23 UT zero point check.
24 Review hardness test reports.
25 Review production test plate reports.
26 Review of other tests, e.g. ferrite number, "Positive Material Identification" (PMI / AV)
27 Review post-weld heat treatment and stress relieving records, time-temperature charts.
28 Witness leak testing, i.e. on reinforcement pads.
29 Witness pressure testing.
30 Check applied torque values on bolted connections.
31 Check cleanliness and surface treatment, i.e. pickling and passivating, sand-blasting.
32 Check painting/coating: type of coat, film thickness, bonding strength.
33 Review final Manufacturer's Data Report (vessel data book).
34 Review and / or signing of "Fabrication and Inspection Plan" / "Quality Plan".
35 Verify completeness of loose delivered items, i.e. gaskets, bolts, foundation ring, internals
etc.
36 Check closure of openings and tell-tale holes, N2 filling, shipment supports, marking.
37 Check transport saddles: dimensions, distance to external attachments.
38
39
40
41
Note: Reports shall be properly prepared by manufacturer Records shall be available.
Table 2: Supplementary Activities for Tray Columns
No. Inspection activity Performed
50 Check tray support rings 1): Cleanliness of contact surface to tray floors, attachment welds.
Distance between support rings.2)
51 Verify downcomer orientation of trays.
52 Check downcomer support bars 1): clean corner (no fillet welds), attachment welds.
53 Check vortex breakers, draw-off sumps, feed distributor boxes, chimney trays, dividing
walls, wire mesh, impingement baffles.
54 Ensure unrestricted site erection: adjacency of externals and nozzles to lifting lugs or
trunnions.
55 Check for leaks on bolted connections, i.e. chimney trays, where "fluid tight" condition is
specified.
56 Inspect tray floor assembly 1).
57 Check seal welding of tray floors and downcomer to supporting structure 3).
58
59
60
61
62
1) Check lists are provided acc. to flow type.
2) Separate dimensional report shall be prepared; example of check list can be provided.
3) For columns with non-removable trays.
Table 3: Supplementary Activities for Packed-Bed Columns
No. Inspection activity Performed
80 Check holding-down grid and supporting grid: Seal welds to shell, bolt spacing, grid
fastening, level.
81 Check distributor floors: Orientation, dimensions, seal welding to shell, fastening.
82 Verify distance between feed nozzles and first tray, distributor floor and holding-down grid.