1. LV LINE
150-PL-3008-151430X 17 17 - 2 1 - 1 COMPLETE
150-PL-3108-151430X 17 17 - 2 1 - 1 PENDING
TOTAL 59 51 8 14 8 - 2
SUPPORTING DOCUMENTS
1. Isometric drawings
2. Pipe support drawings
3. Instrument
4. ITP Painting
5. Paint Matrix
6. Paint batch certs
7. Condy phase 2 – QAQC Closeout Report (Onshore Prefab)
8. Condy train B schedule
EQUIPMENT
1. QAQC/ST/06/14
2. QAQC/WF/02/13
3. QAQC/MM/02/18
4. QAQC/WH/03/18
5. QAQC/DFT/03/14