Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

BGR MINING & INFRA: HIGH-FIVE

1. We are a $ 242.483 million USD Company (FY 2015-16)


UNEARTHING
2. Over 25 years of dedicated Mining Operations & Civil Engineering Projects TREASURES
BGR Mining & Infra Private Limited
3. Workplace for over 10000 talented, skilled team members- and growing!

4. Proud to be working on 15 ongoing projects for leading clientele across India

5. Ultra-modern machinery with about 2100 hi-tech pieces of equipment

GLOBAL BENCHMARKS AND CERTIFICATIONS


We are on the quest for improving quality and exceeding
customers’ expectations. Our precision, punctuality and high
standards have been recognized and rewarded with many
global benchmarks and certifications.

SAFETY
BGR Mining & Infra Pvt. Ltd. RELIABILITY
Design: Scintilladigi.com

8-2-596/R, Road No.10, Banjara Hills, + 91-40-23351 932


Hyderabad, Telangana,
India -500034.
+91 40-233-51 931,
ho.hyd@bgrmining.com
SUSTAINABILITY

BGR Brochure-A4-final-5.indd Spread 1 of 6 - Pages(12, 1) 11/10/2016 6:49:10 PM


ABOUT BGR MINING PROJECTS IN INDIA
COMMITTED TO THE HIGHEST STANDARDS OF SERVICE. MAJOR PARTNER IN MAKING INDIA WORLD LEADING
RESPONSIBLY COAL PRODUCER
A much-respected name today, BGR Mining & Infra Pvt. Ltd. was envisioned in the year 1988. From our humble
With 15 of our major ongoing projects spanning the length and breadth of India, we are determinedly focused on
beginnings as Engineering contractors, we established ourselves as a formidable player in the industry with several
contributing to make our country a world-leading coal extractor. The cost-efficiency in executing our mission-critical in
PWD related projects in a short span of two years.
a timely manner has time and again ensured high productivity and profits for our stakeholders. While these operations
Today, we are one of India’s largest private-sector Coal Mining, OB Contractors, Mine Developer and Operating
result in substantial employment opportunities across the states, they also generate growth for the economy.
Companies. Coal mining operations across 15 project sites in India create a strategic advantage for our production,
output and snowball into great benefits for all our stakeholders.

TEAM & KEY LEADERSHIP Uttar Pradesh Jharkhand


INSPIRED BY EXCELLENCE, DRIVEN BY COMMITMENT Northan Coalfields Ltd. Central Coalfields Ltd.
Dudhichua OCP, P.O: Khadia, Amrapali OCP-OB
Headquartered at Hyderabad, the company has established a distinctive edge over other players in the Indian Mining Snebhadra (Dist) Amrapali OCP-Coal
marketplace as the quality OB Contractor and results-oriented Mine Developer cum Operator. Our management Krishnashila OCP Parej OCP
cornerstone commitments steer us in the direction of our shared vision- Jharkand OCP
Madhya Pradesh
Tapin OCP
• Leading from the front and inspiring with exemplary performance Northern Coal Fields Ltd.
Magadh OCP
• Building a positive work environment that personifies company values Nigahi OCP
Bhrat Coking Coal Ltd.
• An open-door policy that promotes a healthy working relationship at all levels Block B OCP. P.O: Gorbi,
Singrauli (Dist) Dobari
• Staying abreast of all external trends and market forces that influence our business ecosystem
West Bengal Power Development Corporation

Gujarat Pachhwara North Coal Mine, Pakur (Dist)


OUR TEAM OF VISIONARIES, UNLEASHING INDIA’S ENERGY POTENTIAL.
Gujarat Mineral Development
We at BGR Mining & Infra Pvt. Ltd. are fortunate to be led by the Senior Management of visionary professionals whose Corporation Ltd. (GMDC)
commitment to excellence is coupled with leading best-in-class practices to give us the definitive edge over our Umarsar
competition. Not only are the core management actively involved in the day-to-day operations, they have strengthened Uttar Pradesh

our resolve and inspire us to reach higher with the successful completion of each and every project coming our way.

Jharkhand
Gujarat Madhya Pradesh

Odisha
Odisha
Mahanandi Coalfields Ltd.
Lakhanpur OCP, Lakhanpur Area,
Telangana
(Coal Excavation & Coal Transportation
Lakhanpur OCP, Lakhanpur Area, OB Work
(Quarry-1)
Lakhanpur OCP, Lakhanpur Area, OB Work
(Quarry-5)
Mr. B. Girijapathi Reddy Mr. B. Umapathi Reddy Mr. I. Sudhakar Reddy Mr. Raghurami Reddy
Founder Managing Director Director CEO

Tamilnadu
Tamilnadu
Telangana
The Singareni Collieries Company Ltd.
Khairagua OCP, Bellampalli Area,
Adilabad (Dist)

Tamilnadu
Neyveli Lignite Coporation Ltd.
Block-1, Neyveli
Mr. B. Karthik Reddy Mr. B. Rohit Reddy Mrs. B.Vijaya Lakshmi Mr. Deepak Reddy Mr. Dheeraj Reddy
Director Director Director Director Director

2 11

BGR Brochure-A4-final-5.indd Spread 2 of 6 - Pages(2, 11) 11/10/2016 6:49:15 PM


VISION & MISSION, OUR COMMITMENT
VISION
“Our vision is to be the ‘preferred mining partner’ for all our stakeholders that include our
clients, business associates, employees and the communities within which we operate.
We strive to be India’s leading coal mining company, enabling economic prosperity and
making a positive change for a better quality of life.”

MISSION
“We aim to be India’s leading mining company with a sensitive, responsive
approach to each of our projects. We will create superior value by ensuring
efficiency and excellence without compromising on Quality, Safety and
Responsibility.”

OUR COMMITMENT

SAFETY RELIABILITY
At BGR, Safety is a way of life. Every day, at every office We are accountable for our own success. We work in
and operation site, we strive to operate incident free, an transparent and ethical manner, applying continuous
with zero injuries, occupational illnesses and property improvement and technology-driven solutions to operate
damage. Hundreds of safety observations are conducted cost-effectively. It is in the DNA of every member of the
daily, across the company to recognize best practices BGR family, from the M.D to Excavator Operator to work
and immediately correct potential unsafe acts. We also towards achieving our shared vision.
collaborate with government agencies to advance safety
technologies and best practices towards our vision of
zero tolerance.

SUSTAINABILITY
As an eco-friendly and environmentally-sensitive company, we are dedicated to providing clean solutions towards coal
mining. All our efforts are rooted in the philosophy of growing responsibly by taking initiatives such as nature-friendly
technology, streamlining water usage, utilizing energy efficiently, curbing wastage, land restoration and planting of trees.

10 3

BGR Brochure-A4-final-5.indd Spread 3 of 6 - Pages(10, 3) 11/10/2016 6:49:18 PM


SERVICES (RANGE OF SOLUTIONS) Description Make Model Capacity Total Grand Total

Surface Miners Writgen 2200SM/3.8 950 HP 2 2


CONTRACT MINING SERVICES Caterpillar 950 H/GC 217 HP 2
We have our roots firmly planted in domain expertise, strengthening our Caterpillar 966 H 286 HP 2
Wheel Loaders 22
competence in expeditiously executing operations in excavation works. By Volvo L150G 300 HP 5
focusing on operational efficiencies through meticulous mine design, operations TATA TH86 86 PS 13
planning and equipment maintenance, we are able to seamlessly achieve the ACE 14XW 14 Tons 9
Cranes 13
targets well within stipulated time frame, every time. Escort 14 Tons 59HP/14 Tons 4
HM 28 KL 28 KL 1
Ashokleyland 12 KL 2
LAND ACQUISITION
Water Sprinklers Eicher Terra 25 18 KL 70 98
Though the process of land acquisition is the responsibility of the owner of the
Actros 4840 12 KL 22
coal mine, our customer-oriented team extends its support wholeheartedly. The
TATA 20 KL 20 KL 3
initiatives taken include liaising with Government Departments for early completion
Volvo India 3
of the process as well as related issues such as replacement and rehabilitation for
Actros 6
the landowners, villagers and so on.
Diesel Bowsers Eicher 41 60
COAL QUALITY MANAGEMENT Ashokleyland 2
TATA 8
Fuelled by the passion to raise standards, the coal from the coal benches/face
is extracted with utmost care while laying adequate emphasis on avoiding Mobile Service Eicher 25
33
contamination of waste rock, particularly where the thickness of coal seams Vans Actros 8
is very less. Furthermore, proper supervision is made while extracting as well TATA 5
as loading of coal into trucks by the excavator operator. VAN Bharat Benz 11 53
Eicher 37
TATA 2
SKILLED MANPOWER Bus 28
Eicher 26
Over 10000 employees and counting work with BGR Mining & Infra Pvt. Bolero Mahindra 31
Ltd. across various sites in India. The company focuses on training and Bolero Camper Mahindra 45
developing the skills of its each and every operator/workman on an ongoing
Bolero Pickup Mahindra 17
basis. A dedicated Human Resources division works towards enrolling the
Jeep Mahindra 3 117
best possible hands.
Scorpio Mahindra 18
Car Alto 1
LOCAL LIAISON Auto TATA 2

The top brass at BGR Mining & Infra Pvt. Ltd. keenly gathers information Total 2054 2054
related to local issues and addresses them properly and immediately. Their
initiative reflects in the harmonious works in Amrapali Project of Jharkhand
State. Similar local issues etc. have been tackled amicably here and there.
Since the projects mostly exist in remote areas, away from commercial
opportunities and poor transport system, the trouble shooters are resolved
through work opportunities for a win-win situation.

MINE DEVELOPING & OPERATIONS


The company offers quality services in the following key areas: Mine planning and
engineering, Construction of mine infrastructure, Construction of haul roads and
service roads, Illumination of mine and dump areas, Dewatering arrangements,
Drilling & blasting, Excavation, loading & transportation, Unloading/dumping,
levelling and related activities, Environment management monitoring,
Reclamation, OB removal and coal extraction, Coal quality & Security

4 9

BGR Brochure-A4-final-5.indd Spread 4 of 6 - Pages(4, 9) 11/10/2016 6:49:39 PM


STATE-OF-THE ART TECHNOLOGY, FINANCIAL DETAILS
BEST-IN-CLASS PROCESSES
Figures in Rs.Crores
We continue to pioneer technical advances in mining by investing in and procuring a diverse range of machinery to ensure
that we maintain international standards of operations. Skilled manpower works hand in hand with Global Positioning
F.Y Revenue EBIDTA
Satellites, real-time monitoring systems and computerized dispatching technologies to improve efficiency and output.
Our maintenance reliability program uses sophisticated analytics to enhance operator safety and equipment availability. 2011-12 198.30 59.57
This is further enhanced by our world-class haul truck-and- shovel fleet and state-of- the-art open cast mining systems
improve capacity. 2012-13 209.42 64.12

2013-14 369.48 106.78


List of Equipments
2014-15 914.42 243.73
Description Make Model Capacity Total Grand Total
Volvo FM 480 10X4 24.00 Cum 85 2015-16 1,621.00 462.06
Volvo FMX 520 26.00 Cum 30
Volvo FM 400 18.70 Cum 10 1,800.00
Volvo FMX440 8X4R 33.00 Cum 20
Volvo FMX440 8X4R 18.70 Cum 163 1,600.00
Trucks Volvo FMX440 8X4R 19.50 Cum 99 1277
1,400.00
Volvo FMX440 8X4R(I) 19.50 Cum 118
Scania P 410 18.80 Cum 444 1,200.00
Actros Actors 4841 18.70 Cum 233
Bharat Benz 3128 CM 18.00 Cum 69 1,000.00
Eicher Pro 8031 20.00 Cum 6 Revenue
800.00
Tata Hitachi ZX 210 H 150 HP/0.90 5
EBIDTA
Tata Hitachi ZX 220 LC 170 HP/1.00 11 600.00
Tata Hitachi EX 200 LC 1
Tata Hitachi ZX870H-5G 483 HP/4.50 10 400.00
Caterpillar CAT374DL 476 HP/4.60 4
200.00
Excavators Volvo EC 750DL 508 HP/4.25 7 176
Volvo EC 480 DL 360 HP/3.10 53 -
Kobelco SK 500 HD 345 HP/3.40 4 11-12 12-13 13-14 14-15 15-16
SANY Sy480LC-9H 340 HP/2.90 16
Hyundai R 500 LC-7 353 HP/3.03 50
Komastsu PC 450LX-7 330 HP/3.10 15
Komastsu D 85-ESS2A 200 HP 68
Komastsu D155A-6R 355 HP 14
Komastsu WD 420-3 224 HP 4
Bull Dozers 120
BEML BD 65 165 HP 17
Caterpillar D6R 175 HP 13
Caterpillar D8R 328 HP 4
Caterpillar 120 H 125 HP 2
Caterpillar 120 K-2 145 HP 30
Caterpillar 140 H 190 HP 2
Motor Graders 50
Leeboy Leeboy 985 173 HP 5
Case Case 845 B 140 HP 4
Komastsu 705-A 4 200 HP 7
Track Mounted Atlas Copco ROC L8 440 HP 4
5
Rigs Atlas Copco DM 30 440 HP 1
8 5

BGR Brochure-A4-final-5.indd Spread 5 of 6 - Pages(8, 5) 11/10/2016 6:49:54 PM


SIGNIFICANT ACHIEVEMENTS CAMP, WORKSHOP & DUMP AREAS

Excavated 48.82 LBCM of OB at Nigahi OCP with conventional equipment in a Single month i.e.,
March, 2015.

Extracted 5.11 MT of Coal in period of 12 months at Amrapali OCP.

Rehabilitation of PAPs who were living near dump area at Nigahi OCP to new location by
constructing 40 houses.

Executed Diversion of River Amri, Umrer Project in WCL.

Deployed own HEMM, 12 cum hydraulic excavators in combination with 100 T dumpers at KTK
OCP of SCCL.

Deployed Surface Miners at Amrapali OCP and Lakhanpur OCP for coal extraction.

Carried out Drilling & Controlled Blasting with shock tube initiation system at many projects of
SCCL.

Construction of 2 Road Bridges at Ramakrishnapur & 1 Road Bridge at BLOCK B OCP

Presently BGR owns and Operates more than 2100 nos. of equipment across various projects

We have executed several greenfield projects in different subsidiaries of CIL, SCCL and GMDC.

We have established good rapport with local people and various Govt. agencies which enabled
us for early commencement of projects and ensured exposure of coal within record time of 2-6
months.

6 7

BGR Brochure-A4-final-5.indd Spread 6 of 6 - Pages(6, 7) 11/10/2016 6:49:56 PM

You might also like