Professional Documents
Culture Documents
CDP Nasrullaganj E
CDP Nasrullaganj E
January 2012
Submitted to
Commissioner
Urban Administration and Development Department,
“Palika Bhawan”, Nr. 6 No. Stop, Shivaji Nagar, Bhopal
Phone: +91-755-2552356 Project Co-ordination:
Fax: +91-755-2552591
Prepared by:
ICRA Management Consulting Services Limited
Logix Park, First Floor
Plot A4 & A5, Sector – 16
ICRA Management
Noida – 201301
Consulting Services Limited
Town: Nasarullahganj
Population: 23738
District: Sehore
Lies in Narmada Basin
Latitude 23°20´ N
Geographical location (Town)
Longitude 76°20´ E
Average rainfall (annual) MM 1100
Height above mean sea level Mts 440 m
Town Brief
Government 1
No. of Hospitals Beds 50
Private 0
Health
Beds 0
Multispeciality hospital if any (Y/N) No 0
Name of
Bhopal
Name of Nearby town reffered for town
Treatment Distance
92
(Kms)
No. of Primary schools 13 NA (Students capacity)
Education
Social Infrastructure
No. of Commercial
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
establishments
No. of Tubewells 2 1 1 1 0 1 0 0 1 0 1 1 1 1 3 14
No. of Handpumps 2 2 0 0 1 0 0 0 1 0 0 2 2 1 0 11
No. of OHTs 0 0 0 0 0 0 0 0 0 1 0 0 1 0 0 2
% Coverage of piped
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
water supply
% of population - Open
20 18 10 16 5 6 8 10 8 10 12 12 22 6 24 13
defecation
No. of Dust bins 1 1 0 1 1 1 1 1 1 1 1 1 1 1 2 15
Wardwise Waste
561 320 202 617 156 243 229 190 318 190 370 283 713 432 1123 5946
generated (Kgs)
Road sweeping (1 time or
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 times)
Total no. of sanitary
1 1 1 1 1 1 1 1 2 2 2 2 2 2 3 23
workers in the ward
Length of Pucca road
3.4 1.9 1.2 3.7 0.9 1.4 1.4 1.1 1.9 1.1 2.2 1.7 4.3 2.6 6.7 35.5
(Mts)
Length of Kuccha road
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
(Mts)
Sectoral Analysis
Ward Ward 1 Ward 2 Ward 3 Ward 4 Ward 5 Ward 6 Ward 7 Ward 8 Ward 9 Ward 10 Ward 11 Ward 12 Ward 13 Ward 14 Ward 15 Total
Sardar Vailabhbhai Swami Mou. Abdul kalam Dr. Rajendra Pt. Ravishankar
Name of ward Subhash Dr. ambedkar Tilak Sanjay Bhagatsingh Rajiv gandhi Indira Gandhi Mahatam Gandhi LalbhadurShastri Nehru
patel Vivekanand Azad Prasad Sukla
Length of State
1 0.52 0 0 0 0 0 0.32 0.48 0 0 0.28 0 0 1.4 4
Highway(KMS)
Length of National
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Highway
Length of Road side
3.4 1.9 1.2 3.7 0.8 1.4 1.3 1.1 1.9 1.1 2.0 1.7 4.2 2.5 6.7 35.0
drains Pucca (Mts)
Length of Natural drains
(Nallah) 0 0 0 0 0 0 0 0 0 0 0 0 0 ` 0 0
Pucca/Channelized (Mts)
No. of Electricity
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
connections
Name of Tourist site if
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
any
Name of Heritage site if
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
any
Bus stop (No.) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Bus stand(No.) 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1
Parks (No.) 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1
Playground(No.) 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1
No. of Residential
356 212.8 115.2 358.4 93.6 134.4 140.8 119.2 202.4 120 258.4 169.6 444 268 728.8 3721.6
properties
No. of Commercial
90 80 0 0 0 0 60 70 55 60 0 0 0 0 95 510
properties
Available Government
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
land (Sq kms)
Sectoral Analysis
Slums & Urban Poor
No. of
Name of No. of Beneficiarie Any
No. of No. of Primary
Slum Individual No. of No. of No. of No. of No. of No. of Semi No. of Primary s under interventio
Ward Notified/ Ward Slum Permanent Temporary Health
pocket/ water Community Handpump Individual Community Pucca pucca Kuccha school in social ns under
No Un-notified population population pattas pattas centres in
reference connections taps s toilets toilets houses houses houses the slum security IHSDP
distributed distributed the slum
name pocket schemes (Y/N)
pocket
Subhash
1 2245 NA NA NA NA 0 NA 0 0
Col. & Notified 0 NA 138 138 127
592 Y
Idgah
2 1281 293 NA NA NA NA 0 NA 0 0 Y
Revenue Income
Rental Income from Municipal Properties 3.39 2.56 3.3 3.83
Fees & User Charges 2.29 3.36 1.9 2.6
Sale & Hire Charges
Revenue Grants, Contribution and Subsidies 5.9 25.92 20.07 77.95
Income from Investments
Interest Earned
Other Income 7.96 43.15 43.43 30.13
Total - Revenue Income 97.92 151.95 160.7 239.48
Grants, Contribution for specific purposes 82.78 102.44 180.79 375.41
Receipts
Unsecured Loans
Deposits
Deposit works
Total Capital Receipts 93.62 108.05 194.82 380.58
Establishment Expenses 30.49 45.84 56.73 80.64
Revenue Expenditure
roads - -
Widening/ strengthening - - -
ROBs/flyovers
Upgradation to
Development of bus and truck
Development of bus accommodate Improvement of
terminus
stand none capacity existing infrastructure
Awareness and
Junctions and traffic signal Regulating regulations
improvements Regulating traffic Regulating traffic traffic through enforcement/
through better through better better Improvement of
management management management existing infrastructure
Mass transit system - - -
Parking lots to be
Parking facilities
provided at Upgradation of Improvement of
strategic locations Parking Lots existing infrastructure
Underground cabling
for street lights to
Underground cabling improve the aesthetics
of the town and to
avoid the illegal
connections
STREET LIGH
Installation of
Installation of street lights in
Installation of street street lights in the the ratio of 75%
Energy savings
lights in the ratio of ratio of 75% : 25% : 25% of tube
75% : 25% of tube of tube light: light: sodium
light: sodium lights sodium lights lights
24/7 electricity supply - - -
POWER
100% of
60% of prescribed 80% of prescribed prescribed
100% Teacher student ratio
SOCIAL INFRASTRUCTURE
facilities (as per UDPFI) (as per UDPFI) UDPFI) identification of land
Upgradation of
Playing facilities
Play grounds Play grounds Play grounds existing facilities
Provision for green-belts in future
development plans - - -
RECREA
Sufficient infrastructure at Upgradation of
mela/exhibition ground Yes Yes Yes existing facilities
• Provision of basic
Security of tenure for urban poor services in slum areas
Social security
housing conditions
in slums drains in slums drains in slums
Provision of
Adequate street lighting facilities Provision of street Provision of street street lights in
lights in the slums lights in the slums the slums
Yes (Special
Yes (Special focus Yes (Special focus focus on slum
Education facilities on slum areas while on slum areas areas while
planning new while planning planning new
facilities) new facilities) facilities)
SLUMS
SLUMS
Yes (Special
Yes (Special focus Yes (Special focus
focus on slum
Community halls etc. on slum areas while on slum areas areas while
planning new while planning planning new
facilities) new facilities) facilities)
Yes (Special
Yes (Special focus Yes (Special focus focus on slum
Adequate health facilities on slum areas while on slum areas areas while
planning new while planning planning new
facilities) new facilities) facilities)
Strengths Weaknesses
The town is well connected to Bhopal Absence of master plan of the town has
and other places through SH 22. led to haphazard and unorganized
Class „A‟ Krishi Upaj Mandi in development in the town.
Nasarullahganj is the major centre of Poor infrastructure especially in the slum
trade activities in the town and its wards have led to unhygienic conditions
surrounding areas. in the town
High literacy rate in the town can be No industrial activities are present in the
tapped for improving the economic status town. The major agricultural produce is
of the town. exported to nearby cities in the state.
Opportunities Threats
Agro–based industries would create Lack of basic infrastructure, giving rise to
much needed employment and boost poor living conditions, hampering socio-
economy of the town. economic condition of the town.
The town is located near to forest reserve No other activity except agriculture has
rich in medicinal value, therefore there is been explored as an economic activity in
an opportunity to tap the natural the town.
resources and develop an economic Low work force participation is a threat to
activity in the town. the economic development of the town
As of 2011 (Provisional Data – Census 2011), Nasrullahganj has a population of 23,738. Although the
details for 2011 are not available, but referring to Census details of 2001, the work participation rate
was 27% (2001) which was very low as compared to national rate of 39% and state rate of 42.7%.
Currently, the sex ratio of the town is 964, which is far above than national level of sex ratio of 940
and higher than state‟s sex ratio of 887. Literacy rate is 73 % which is very high as compared to
National Literacy Rate of 64.84% and state‟s literacy rate of 63.74%.
Nasrullahganj‟s inhabitants are primarily agriculturalists. Soybean and pulse production is very high
in the region. The total area of the town is 8.08 sq km and it is delineated into 15 wards.
Water Supply
1 Daily Per Capita Supply (LPCD) 60 Current supply on a per capita basis
2 Elevated Storage Capacity / Daily Supply (% of 57 is significantly below UDPFI
amount of daily water supplied) Need for significant augmentation of
3 Distribution Network / Road Length (%) 28 water supply at source, storage and
distribution.
Sewerage, Sanitation and Storm Drains
11 Waste generation per capita (gms) 250 Need for a comprehensive program
12 Collection efficiency (% of waste generated) 42.1 for SWM
Presently, waste is thrown in an
14 Landfill Area (Acres) 4.3
open ground near water tube wells
15 Average vehicle trips 1 Composing, Source segregation and
16 Source Segregation and Composting (Yes/No) No Door-to-door collection needs
implementation in a phased manner.
“A sustainable city that provides adequate and equitable access of urban services for all its
citizens along with employment opportunities for everyone”
To achieve the desired vision, Sector goals and detailed strategies have been formulated for 1)
Physical Infrastructure, 2) Social Infrastructure, 3) Economic Development, 4) Environment, 5) Urban
Poor and 6) Urban Governance and Institutional Development.
Nasarullahganj
Nagar
Parishad,
13 Education - 390.00 390.00 780.00
Department of
Education,
GoMP
Nasarullahganj
Nagar
14 Health 1,059.00 413.50 422.00 1,894.50 Parishad,
Department of
Health, GoMP
Social Infrastructure
Nasarullahganj
& Other Projects
15 215.00 5.00 205.00 425.00 Nagar
(Economy and
Parishad
others)
Total 3,633.56 2,635.16 3,079.90 9,348.61
1.3.1. Inception
This stage includes a preliminary analysis of the town including strengths and weaknesses of the city
and finalization of the approach and methodology for the preparation of CDP for the town. This stage
also gives an understanding of what impedes service delivery and management within the existing
set-up and what contributes to better service provision. This stage consists of the following tasks:
Reconnaissance
During the first week of the assignment a reconnaissance exercise has been conducted, which
included the following activities:
An indicative list of the stakeholders to be invited for the kick off workshop has been discussed, which
may include:
Sector analysis
Based on the interactions with various stakeholder groups (meetings, workshops, focus group
discussions, etc.) and review of relevant documents (publications, reports, GOs, resolutions,
procedures, laws etc.) an analysis of the current situation in all the identified sectors has been
undertaken. This sector analysis has been carried out in the consultation with local counterparts and
further a methodology for the sector analysis has been developed, which includes the following:
Study of economic opportunity and potential for Local/regional economic development, with
special reference to the poor
Physical infrastructure demand and gap assessment (considering service level
benchmarking)
Transport study with emphasis on low cost public transport and livelihoods
Heritage conservation and tourism
Environmental sustainability
Access to housing, employment and social and environmental services by the poor
Health and Education services gap in the town
Sectoral Issues addressed under the Master Plan (as prepared by the TCPD)
City profile
The findings from the sector analysis are used to prepare the City Profile consisting of the
assessment of the existing situation in all identified sectors, emerging issues, SWOT analysis and
projection of the present gaps and future requirements. Development of city vision and sector goals
and strategies
Discussion on strategies, priorities and major actions that may be required in the next five years to
move towards the vision 2035 have been discussed to develop city vision, sector strategies and
strategies.
Sector strategies
After reviewing relevant cases from national and international best practices, learning are identified to
explore if the same can be applied in relevant sectors to bring in improved and efficient ways of
working.
This stages also includes consultations with the local counterparts to develop sector strategies in
consonance with the city vision and sector goals.
Evaluation of strategies
The strategies are evaluated from the perspective of their contribution to achieving the vision and
sector goals. Criteria for prioritizing the strategies, programmes and projects have been developed in
consultations with the Steering Group.
Analyze governance framework and reform action plans
Based on the consultations with the ULB officials, representatives of reform programmes and local
counterparts an examination of the reforms at state and local levels has been carried out to
understand whether these reforms are sufficient to support the vision and strategic plan and to sustain
the planned interventions.
Sector Analysis, Vision, Strategies and Projects Report
The output of this phase is outlining the goals, strategies, priority actions and projects with an
estimate of preliminary funding requirements in each sector.
Workshop-II: “ULB level workshop”
At the completion of this phase a 2nd ULB level workshop has been organized (supported by a
presentation to the stakeholders).
1.3.3. Preparing a City Investment Plan (CIP) and a financing strategy
Based on the availability of resources, logical sequencing of actions and potential for immediate
implementation, a City Investment Plan (CIP) has been prepared in consultation with ULB to lays out
the cost and revenue estimates of all priority projects in the next five years. The preparation of the
CIP is a reiterative process requiring adjustments to individual projects as well as changes in
scheduling to make the whole package work financially. The City Investment plan is supported with a
Financial Operating Plan (FOP).
1.3.4. Draft CDP
After feedback from stakeholders a draft CDP for the town including the CIP and FOP will be finalize.
Workshop-III: “Workshop on Draft CDP”
This Draft Report has been presented to the stakeholders of the town in third workshop. The objective
of this workshop was to seek an endorsement of the City Development Plan from the stakeholder
group present and agree on procedures for performance monitoring.
Performance Monitoring
Performance- monitoring/sustainability indicators have been identified to assist ULB in review the
progress and outcomes of the CDP on an annual basis and to enable them in setting the agenda for
the future.
1.4. Approach
The City Development Plan (CDP) is the Nagar Parishad‟s strategy that presents both a vision of a
desired future perspective for the town and the Parishad‟s organization, and mission statements on
how the Nagar Parishad, together with other stakeholders, intends to work towards achieving the
short term and long-term vision. CDP should be very comprehensive and should cover all the aspects
where town needs intervention. To achieve a comprehensive CDP, we have adopted few guiding
principles as discussed below.
1. To put in place institutional mechanisms including the formation of Steering Group for conduct of
the assignment in a structured consultative manner as envisaged
2. To engage with stakeholders and arrive at a shared understanding of the objectives and expected
outcomes of the study
3. Apart from this, our team have used this as a preparatory stage to
a. Review and analyse the current status and unique features of the city with regard to the state
of its development, systems and procedures, as equally its institutional and financial context.
b. Identify the strengths and weaknesses in the city‟s development and to develop an
understanding of what impedes infrastructure provision and service delivery and
management within the existing set-up and what contributes to better service provision.
c. Do a rapid assessment through interactions with stakeholders and initial data collection to
capture previous and on-going development initiatives to factor the same in the
Consultations and Analysis module.
The broad activities and tasks outlined under the Inception stage by MPUADD including the following:
This module has culminated in conduct of a one-day kick off workshop with stakeholders. The
purpose of the kick-off workshop was to build participative energy and commitment of stakeholders for
the study through articulation of the purpose, process, and expected outcomes of the CDP, and
achieving a shared understanding of the same. The kick off workshop has helped in deriving a
consensus along with the stakeholders firming the process and agreeing upon a structured
programme to take the CDP forward. Further the institutional structures including the Steering Group
for the consultative process has also been spelt out during this workshop. Following the workshop, we
had submitted an Inception Report, which was followed with a presentation to MPUADD and the ULB.
This module starts with the Situation assessment covering Sector level analysis and development of
the Town profile, moving on to formulation of a Vision for the town and translating them into
Strategies, Priority Projects and Reform Actions. While there are self-contained sub-modules within
this step, we have clubbed them into Module II, given the highly consultative as well as data
collection/reconnaissance intensive nature of these steps and the iterative linkages between these
steps.
Given the multiple and heterogeneous set of stakeholders involved, we have use a range of
instruments to capture diverse inputs for the exercise as indicated below:
In addition, we had a significant on-the-ground interaction effort through our research and support
staff to compile data and information from the cities. From our experience in handling such studies,
very often it is critical to spend substantial time with ULB staff/do sample based field visits given the
data and information availability related limitations. Such interactions enabled us capture qualitative
insights and served in providing surrogate inputs to validate and overcome the generally faced
limitations of data availability. For instance, we have collected budget documents at the beginning at
the study and do the analysis of financials in parallel. A time period wise analysis of revenue and
costs along with their drivers enabled us to spot data discrepancies in the initial stages and helped us
to identify areas where greater time is required for data collection/scrutiny. Similarly in the area of
service levels benchmarking, we have done a physical reconnaissance of municipal assets to validate
reports made available to us.
We concurred the activities and steps identified by MPUADD in the Terms of Reference in moving
from a Situation Assessment to formulate the City Vision and translating that to Sector strategies and
priority projects. Some specifics of our approach along each of these steps are described below:
Sector Analysis
We have chosen the specific sectors/issues for preparing detailed sectoral papers, based on the
criticality of the sector (as viewed by the stakeholders) and the baseline status of the prevailing
service levels in that city. While the exact list of sectors has been finalized during consultations, an
indicative list of sectors that came out as critical areas include the following:
a. Water Supply
b. Sanitation and Sewerage
c. Solid Waste Management
d. Urban Housing
e. Public Transportation
f. Social amenities and infrastructure including Schools, Hospitals, Markets
g. Heritage & Tourism
a. Review the baseline status of the sector in terms of operational service level and financial
indicators vis-a-vis benchmarks/norms and desired levels of service to arrive at the
normative gaps.
b. Identification of the possible alternatives for improving service levels, policy
changes/implications and the magnitude of investment required to improve service levels in a
time-bound manner.
c. Developing a sector strategy, targets for service level improvement and a list of potential
priority projects to be undertaken along with an expected level of improvement in service
levels through implementation of these projects.
These steps has been undertaken in consultation with local counterparts. While carrying out the
sector level analysis, aspects relating to the need for provisioning for urban poor, broad review of
cost-benefits including social and environmental impacts were factored.
The city profiles has been drawn from the Sector analysis and assessment of the existing situation in
all the sectors identified, emerging issues, analysis and projection of the present gaps and future
requirements.
City Vision
Exhibit 1-2 presents an extract from the JNNURM Toolkit considered for developing a City‟s Vision
which we believed summarizes the key contours of a City level Vision formulation quite succinctly.
The City Profile has been presented to the stakeholders and Steering Group followed with a
discussion on city perspective and city priorities as perceived by the stakeholders. With the
background of city profile, perspective and priorities, the participants contributed to the development a
collective and shared vision for the city. Discussion were initiated on strategies, priorities and major
actions that may be required in the next fifteen years to move towards the vision.
Developing a common vision requires a significant effort of consensus building in order to balance the competing demands
arising from different economic infrastructure sectors, as also from different interest groups within the city. In order to
achieve an understanding on a common vision, it is useful to choose “milestones” and targets such as provision of a
minimum level of services to all; public disclosure and transparency in the formulation of budget proposals; introduction of
a single window in matters of service delivery and management and the like. In developing the vision, cities must choose a
set of criteria that are directly relevant to the JNNURM components. It is important that when cities define outcomes and
milestones on the vision, they ensure that these are measurable and have a time frame.
While the Vision captured a broader perspective of the citizen/stakeholder view on where the city
needs to go, strategies articulate what needs to be done.
Following the finalization of the CIP, we had integrated the deliverables presented in Module I and II
along with the CIP and financing strategy to prepare and submit the City Development Plan.
Further to this a workshop with stakeholders will be conducted to summarize the process and the
building blocks around which the CDP has been evolved and seek an endorsement from them. We
would also work with the stakeholders to develop procedures for performance monitoring and
implementation of the actions recommended in the CDP.
This would be followed by a presentation to MPUADD and the ULB. Based on the inputs we would
submit the final CDP to MPUADD and the ULB along with a summary of the CDP for publication and
wider dissemination by the NP.
1.5.4. Workshops
The objectives and outcomes of various stakeholders are:
A workshop was organized to familiarize the stakeholders with the purpose, process, and expected
outcomes of the CDP, and build enthusiasm, understanding and commitment to the CDP. The kick off
workshop helped in deriving a consensus along with the stakeholders firming the process and
agreeing upon a structured programme to take the CDP forward. It happened during first workshop
i.e. “Kick-off Stakeholder Consultation Workshop,” on November 2nd, 2011. Presentation was
followed by a participative session on “discussion & suggestions.” Outcomes of this workshop were;
familiarization of stakeholders with the purpose, methodology & expected outcomes of the study,
improvisation in our understanding of city & its problems, innovative approaches to counter existing
problems and building of enthusiasm, understanding and commitment for the successful completion
of a comprehensive and ambitious but implementable, City Development Plan.
Second formal meeting addressing all stakeholders happened during second workshop on December
rd
3 , 2011. Presentation was followed by a participative session and questionnaire round, which helped
in finalizing the city vision, sector goals, strategies and priority actions for the development of the
town. This workshop culminated in the consolidation of strategies, priority actions and projects.
In this workshop, findings and recommendations to achieve the vision has been presented to the city.
Detailed list of proposed projects with broad cost estimates have been shared along with the
sustenance capacity of ULB. This workshop also discussed about the reform process to make ULB
more efficient. This workshop culminated in the consolidation of draft CDP, comments to improve
sectoral issues have been suggested by stakeholders.
The detailed proceedings of various stakeholder workshops are provided as Annexure 1. The second
workshop also included a questionnaire survey to elicit stakeholders‟ responses on key issues faced
by city and extent of their severity. The details pertaining to questionnaire survey, viz. objective,
methodology, questionnaire, analysis and findings, are provided in chapter 8 and questionnaire is
attached as Annexure 2.
Section 1: “Introduction” (this section) provides the background to the study and outlines the
study progress till date along with proceedings of 1st and 2nd Workshops.
Section 2: “Physical Features of the Town” covers location, physiography and landform of the
town.
Sehore stands in the foothills of Vindhyachal range in the middle of Malwa Region. After formation of
Madhya Pradesh, the state capital Bhopal was a part of the Sehore District. It was bifurcated in 1972
and a new district Bhopal was formed. Big and small rivers abound the landscape of Sehore District.
Narmada, Parwati, Dudhi, Newaj, Kolar, Papnas, Kulans, Seewan, Lotia and other rivers are found
passing through the district.
2.4.2. Drainage
Babbar River flows in the northern part of the town and Narmada River flows in the southern side of
the city. The town falls under Narmada Basin and its catchment area. A nallah flowing in North-South
direction bisects the town.
2.4.3. Climate
Nasrullahganj is placed at 440 m above mean sea level. The climate of the town is relatively
temperate with an average maximum and minimum temperatures at 32.30°C and 18.40°C
respectively. The average rainfall reported in the town is about 1100 mm.
2.6. Conclusion
This chapter dealt with the physical features of the town which included topography, natural drainage,
climate, and rainfall. It also provided information on its location and connectivity. The next chapter
discusses the demographic profile of the town.
1 1981 7,212 -
2 1991 14,688 104
3 2001 17,240 17
4 2011* 23,738 38
Source – Census of India (*Provisional population as per Census 2011)
Population density (P.D.) is calculated as population of the city divided by the municipal area of the
town. It is generally represented in terms of No. per square km (No. /sq. km). The current density of
Nasrullahganj is 2,938. As shown in Map 4B, Annexure IV wards 1, 4, 13, 15, 10, 7 and 6 have
minimum density and are located on the periphery of the town; whereas the wards located in the inner
part of the town are densely populated.
3.3. Population projection
With a precedence of past and current trends of population growth in Nasrullahganj, an analysis has
been carried out with an objective of estimating population for the next three decades using various
methods which includes Arithmetic increase method, Incremental increase method, Geometric
progression method exponential methods. Result of this analysis is presented in Exhibit 3-2.
Exhibit 3-2 Population Projection
Population Projections
S. No Method
2011 2021 2031 2041
1 Arithmetic Increase Method 23,738 29,247 34,755 40,264
2 Incremental Increase Method 28,758 33,288 37,330
Sex Ratio
Ward No.
Literacy
Total
rate
Female
Female
Others
Others
Total
Total
Male
Male
3.5. Issues
3.6. Conclusion
This chapter discussed population growth trend and population density of the town. It was followed by
ward-wise population details and includes population projections for next 25 years. The next chapter
deals with the socio-economic profile of the town.
Main Workers: Those workers who had worked for the major part of the reference period (i.e. 6
months or more).
4.4. Issues
A significant number of male and female illiterates are a serious issue which impedes the
overall development of the city. This can be attributed to less awareness, poverty and lack of
sufficient accessible education.
Strengths Weaknesses
opportunities Threats
4.6. Conclusions
This chapter dealt with the spatial growth trend and past trend on Nasarullahganj‟s expansion in its
existing state. The ward maps and land use pattern and housing scenario have also been discussed
in detail. The chapter ended with a brief note about the growth possibilities.
In the map population density has been categorized into four types. Ward no. five and three have
higher density and are shown in the dark brown colour. Wards 11 and 14, are in the density range of
50-100 PPH and are shown in the light brown colour. The wards 1,4,6,7,10,13 and 15 are the ones
with least density and shown in the light yellow colour. Rest of the wards have medium density in the
range 100-150 PPH and are shown in the dark yellow colour.
5.2.1. Municipal level mapping (to the scale)
The municipal area covers 8.08 sq. Kms of land. Map-3 enclosed in annexure 4 shows the municipal
level map and a base map with major landmarks of Nasrullahganj.
5.2.2. Ward delineation map
The town has 15 wards. The delineation of wards has been shown in Map-4A enclosed in annexure 4.
As discussed above Agriculture accounts for 73% of the total land in town and the developed land is
only 24.5%, which consists of 14% of residential use, while institutional, commercial and roads
accounts for 4, 3.5 and 3% respectively. The broad tentative land use of the town has been
represented in Map-5 enclosed in Annexure 4. The broad land use pattern shows that, institutional
area is located along state highway. Residential area is divided in the two parts, one in North –
Western part and other in the south-eastern part of the town.
5.5. Issues
1. The population densities in internal wards, which are in the core area are substantially high and
are near to the permissible limits as prescribed in the UDPFI guidelines as compared to other
wards. Initiatives should be taken to decongest these wards in order to reduce infrastructural
pressure from the overcrowded wards.
2. The haphazard development and formulation of illegal colonies in the town has increased and
leads to degraded quality of life. There is a need to prepare a master plan for regulated land
development and proper management and development of the town.
5.7. Conclusion
This chapter dealt with the spatial growth trend and how did Nasrullahganj expanded into the town it
is now. The ward maps and land use pattern and housing scenario have also been discussed in
detail. The chapter ended with a brief note about the growth possibilities and city specific strategies
and action plan.
1 Domestic 40
2 Commercial/ Industrial 75
New Connections Connection Fees (Rs)
1 Domestic 705
2 Commercial/ Industrial 705
Source: Nasrullahganj Nagar Parishad
For new connections Rs 705 includes connection fee, Rs 5 as application fee, road cutting charges is
at the rate Rs 100/ft., Rs 105 as tap connection fee.
Exhibit 6-3 Water Supply - Service Level Indicators
UDPFI/ CPHEEO
S. No Service Level Indicator Values Unit
Norms
1 Gross Daily Per Capita Supply-Year 2011 60 135 lpcd
2 % Roads Covered with Distribution Network 28 85 %
3 % Elevated Storage capacity w.r.t Supply 57 33 %
4 % Total Storage capacity w.r.t Supply 57.5 %
5 % Treatment capacity available (Primary @ ESR) 0 100 %
As per the ground water booklet on Sehore district by Central Ground water board, a major portion of
Budni block falling under south eastern part of district is covered with Vindhayan formations which
comprise of sandstone, shale, quartzite and breccia. These formations are generally poor aquifers but
when they are subjected to weathering and jointing, they become moderately yielding aquifers. The
depth to water level in this formation varies from 4.85m to 9.50m bgl and season water level
fluctuation ranges from 0.85m to 3.0 m. The yield of wells in this formation varies from 1 to 3 lps.
Major portion of alluvium occurs along Narmada river falling in Budni block and small linear patches
occur along Pārbati river in the western side of the district. It majorly consists of clay, sand, silt, gravel
and pebbles. The yield of wells in this formation varies from 5 to 10 lps. The remaining portion in the
district falls under Deccan trap formation which covers 85% of the total area of district. The yield of
wells in this formation varies from 1 to 5 lps.
The quality of ground water in the district has been assessed by central ground water board by
analyzing ground water samples in the district. From the samples it is observed that PH values of all
water samples vary between 7.27-8.07 which shows alkaline nature of the water in the district.
Ground water in the district is
generally low to high saline as
electrical conductivity varies from 465
to 2100. Highest EC values
(exceeding 1000) have been found in
Ashta (2100) and Bhikhileri (1830)
villages. Nitrate level in Sehore district
varies from 5.6 to 358 mg/l. The
concentration of nitrate exceeding 45
mg/l has been found in Ashta (358
mg/l), Bhaya (59 mg/l) and Jattakheda
(51 mg/l). The excessive
concentration of nitrate levels may be
due to localized pollution or excessive
use of fertilizers in the district. The
hardness of ground water in the district has been found safe except in Ashta (705) which crosses the
limit of 600 as per BIS standards. The study also analyzed that the district has no problem with the
fluoride since all wells have fluoride less than 1.5 ppm. No arsenic content has been detected in the
ground water of the district. Refer below Hydrology map of Sehore district for details.
Exhibit 6-4 Present and Future demand and Supply Gaps: Water Supply
Service Levels, Demand and Gaps
Existing / Desired level By Year By Year By Year
Existing (2011)
2015 2025 2035
Desired level
Current level
Service head
Unit
Indicator
Demand
Demand
Demand
Unit
Gap
Gap
Gap
Per-capita
1 Daily Supply Lpcd 60 135 MLD 1.42 3.68 2.26 5.09 1.41 6.58 1.49
supply
Treatment
2 Treatment capacity against % 0 100 MLD - 3.68 3.68 5.09 1.41 6.58 1.49
supply
Distribution Percentage of
3 % 28 85 Km 10 24.98 14.98 31.7 6.81 39.63 7.84
Network Road Length
Elevated
Elevated Storage
4 Storage capacity % 57 33 ML .82 1.23 0.41 1.70 0.47 2.19 0.50
capacity
w.r.t Supply
Source: IMaCS Analysis
It is evident from the Exhibit 6-4 that Nasrullahganj needs a major revamping in “Water Supply” sector
as current level of service, 60 lpcd, is substantially lower than the prescribed norm of 135 lpcd. The
huge gap in the water supply area at the end of year 2015 well underscores the above point. By the
end of year 2035, Nasrullahganj city would require 6.58 MLD of water for daily consumption. No
treatment of water happens in the town. In the area of Elevated Storage Capacity, Nasrullahganj city,
at present, as per the UDPFI standards there is a gap of 0.41 ML in short term and additional 0.50 ML
in long term will have to be addressed. An additional of 24.98 kms, 31.7 and 39.63 kms will be
required in the area of distribution network by the year 2015, 2025 and 2035 respectively.
Weaknesses Threats
Current Service levels of water supply are Excessive exploitation of Ground Water by
lower than level desired under the UDPFI Tube-wells could have long term implications
guidelines. on the Environment
Lack of adequate water treatment capacity. Failure of timely completion of ongoing
Unmetered water connections. “Nasrullahganj Water Supply Scheme” could
Poor collection efficiency of water tariffs. lead to the worsening of the situation.
Failure to extend the distribution network to
the uncovered parts of the city can have
serious socio-economic impacts
6.1.7. Issues
1. A substantial part of population receives untreated water as the treatment facility does not exist
for the supplied water;
2. Critical shortage of water during summer season due to lowering of water level in the
Nasrullahganj;
3. Dependence on Hand-pumps and wells for daily water supply;
4. Complete absence of metering system and
5. Upstream pollution of River.
6.2. Sewerage
As envisaged in the 12th schedule of 74th Amendment to
the Constitution of India, responsibility of providing
services pertaining to sewerage within the city limits lie
with the ULBs. The same responsibility is with
Nasrullahganj Nagar Parishad.
Large proportion of children also defecates in open. It is a common practice to dispose infants‟
excreta in open. Baseline survey indicated that over 12% of households reported that children
defecate in open fields and over 17% of the households throw infant‟s excreta in open field in unsafe
manner. Overall situation causes unhygienic conditions in the city area and also poses risks for
spread of diseases through flies and ground water contamination.
Exhibit 6-5 Present and Future demand and Supply Gaps: Sewerage
Existing/ desired level Service Levels, Demand and Gaps
Demand
Demand
Indicator Unit
level level (2011)
Gap
Gap
Gap
As shown in above Exhibit Nasrullahganj would require a sewerage system to cater the population of
year 2035. According to norms mentioned under the UDPFI, the sewerage system would need to
cover 90% of the road length during year 2035. A comprehensive sewerage system needs an
integrated treatment plant which can be developed in a phased manner. A treatment plant with an
initial capacity of 2.94 MLD should be developed to cater to the requirements of 2035 at 5.26 MLD.
Lack of maintenance and absence of timely Improper usage of public conveniences would
cleaning of free public conveniences renders leave these facilities unusable and would
them unusable for significant amount of time. require more maintenance.
Wastewater from Houses and overflow from
the individual septic tanks mix with storm
water drainage system resulting in water
pollution.
6.2.9. Issues
Many of the households do not clean their septic tanks on annual basis but on bi-annual or tri-
annual basis because of high cost
Lack of space availability, affordability, dense housing structures, and rental accommodation
affects the construction of toilets and septic tanks.
Absence of UGD system: All the wards are to be covered with UGD system. The disposal of
sewage through either open drainage or septic tanks is leading to the pollution of ground
water and surface water. An integrated UG system covering the entire town is critical, given
the expected growth of the town.
6.3. Sanitation
Like sewerage, in the 12th schedule of 74th Amendment to the Constitution of India the responsibility
of providing services pertaining to sanitation within the city limits lie with the ULBs.
As per the survey 82% households have individual toilets. Amongst all the wards ward 1, 13, 3 and 2
has low percentage of households having individual toilet.
Both the toilets at Nasrullahganj bus stand and Sehore Naka are maintained by Sulabh Souchalaya
on pay and use basis. The toilet at bus stand has facility of 12 seats, 6 for gents and 6 for ladies.
Users are charged Rs. 3 per use for both men and women. Tourists and few local residents use the
toilet facility. The public toilet is at Sehore Naka with 7 seats for men and 3 for women. Men are
charged Rs 3 and women are charged Rs. 2 per use. This toilet facility is mostly used by tourists and
truck drivers. There is bathing facility also available for which users are charged Rs. 5. It is proposed
that the community toilets would be located in 1, 2, 3, 5, 6, 7, 12, 13 and14 in order to cater the slum
population.
Under the integrated low cost sanitation scheme in Madhya Pradesh 597 toilets are being constructed
in Nasarullahganj.
Demand
Demand
Indicator Unit
Gap
Gap
Gap
level level (2011)
Slum
Public Population per
102 60 Seat 12 37 25 37 0 37 0
Conveniences Seat of Pub.
Convenience
Community Floating
712 10 Persons 71 61 10 61 0 61 0
Toilets Population
Source: IMaCS Analysis
Weaknesses Threats
The use of public toilets is considerably low Public places, being heavily crowded and not
probably due to the user charges. having any kind of sanitation facilities
showcase filthy and unhygienic environment,
especially on the days when weekly bazzars
are conducted on Thursday.
6.3.6. Issues
The public toilets with pay and use model exists and are being run with the private sector
involvement. However, the use of these toilets is considerably low probably due to the user
charges. Further, such public toilets are not generally accessed by children –on account of
user fees as well as non-child friendly designs of such toilets.
Non-availability of municipal water supply in the vicinity has also affected the use of individual
toilets.
Overall availability of public toilets in the city is inadequate as the crowded areas like market
place like Royal market and JP market and commercial establishments mainly observed in
ward no. 10 and 12 are still lacking such facilities. The existing market place brings in
considerable floating population from the surrounding region which does not have any kind of
sanitation facility. Women, especially, get suffered severely due to absence of such facilities.
Such public places, in turn being heavily crowded, showcase filthy and unhygienic
environment, especially on the days when weekly bazzars are conducted on Thursday.
The city does not have sufficient facilities of sanitation at the public places. There is need to
provide sanitation facilities at the market places (Royal market, J.P.market and Chhota bazar
and major commercial establishment along Indore road. (SH-22).
Public level sanitation facilities for women are grossly lacking in the city.
approximately 13% population – resort to open defecation due to lack of individual or
community sanitation facilities in their area
6.4. Solid waste management
Waste is the unwanted material left over from places of human and animal habitation. Solid waste
comprises unwanted and discarded materials from houses, street sweeping, and commercial and
industrial operations. Increase in urban population and changing life styles lead to the generation of
solid waste.
Generally, solid waste is heterogeneous in nature and a mixture of vegetables, food items, paper,
plastics, rags, glass etc. If solid waste is disposed-off in open areas without any treatment, it will
cause a negative impact on the environment and ground water.
Municipal Solid Waste Management (MSWM) is essential for maintaining the cleanliness of our
surroundings and safeguarding the health of the citizens. As a practice, MSWM can be bifurcated into
following four sub parts i.e.; 1) Collection, 2) transportation, 3) treatment and 4) disposal of the
generated waste. Most of the ULBs often tackle all these components „in-house‟ which often results
into 1) Financially Unsustainable Operations, 2) Waste Left Untreated, and 3) every small
An attempt to resolve the scalability issue, one of the approaches which could be looked at is „cluster
based approach‟ to handling waste, wherein a few ULBs (3-4), who are in proximity to each other,
come together to tackle the treatment and disposable part of the Waste Management while making
the operations feasible/sustainable. This attempt to scale up the operations will not only give some
financial elbow room to the ULBs, but will also help manage the environment/ pollution aspect in a
much controlled manner.
Nasrullahganj Nagar Parishad is responsible for all kinds of collection i.e. primary, secondary and
tertiary which include street sweeping, collection, transportation and disposal of all solid wastes
generated in the town. The total Solid waste generated is 5.93 tones approximately per day.
There is no door to door collection in the town. The town has 14 collection points. The collection
frequency is once daily. The identified trenching ground admeasures 4.3 acres and is at a distance of
one km from the town. Solid waste management exists in the town and needs to be improved upon.
There are two tractors and two trolleys to transport the waste from collection points to trenching
ground. Total number of small hand carts is fifteen.
Exhibit 6-8 Solid Waste Management - Service Level Indicators
S. No Service Level Indicator Values
1 Waste generated per Day (Tones) 5.93
2 Waste Collected per day (Tones) 5.93
3 Number of Dustbins in the town 15
4 Number of collection points 14
5 Average Capacity per bin (Tones) 0.5
6 Frequency of waste Collection
a) Domestic Once daily
b) Commercial Twice daily
Source: Nasrullahganj Nagar Parishad
Exhibit 6-9 Solid Waste Management - Service Level Indicators
S. No Service Level Indicator Values Unit
The current practices of the solid waste management shows that there is no primary collection of the
waste, but there is primary level and secondary level storage of waste. There is no segregation of
Exhibit 6-10 Present and Future Demand and Supply Gaps: Solid Waste Management
Existing / Desired level Service Levels, Demand and Gaps
Service
head Current Desired Existing By Year 2015 By Year 2025 By Year 2035
Indicator Unit
level level (2011) Demand Gap Demand Gap Demand Gap
Waste Waste Generated
228 250 Tonnes 5.93 6.81 9.42 12.18 0
Generated in gms/person
Push Carts/
Primary 15 No. 15 28 13 36 8 46 10
Trolleys
collection
Community Bins 15 No./Km 15 50 35 50 - 50 -
Secondary
Tractors 2 No. 2 4 2 5 2 6 2
collection
Disposal Landfill site 4.3 - Acres 4.30 0.57 - 2.06 - 4.04 -
Source: IMaCS Analysis
6.4.4. Issues
6.5. Drainage
Currently, there is no separate storm water
management system in Nasrullahganj but
the storm water is carried away in drains
constructed for sullage water.
Exhibit 6-11 Present and Future Demand and Supply Gaps: Drainage
Existing/ desired level Service Levels, Demand and Gaps
Service head Current Desired Existing By Year 2015 By Year 2025 By Year 2035
Indicator Unit
level level (2011) Demand Gap Demand Gap Demand Gap
% Road
length
Network reach 99 130 Km 35.00 38.20 3.20 48.62 10.42 60.62 12.00
covered
with drains
Kutcha
NA 0 Km 24.50 - - - - - -
Network type open (%)
6.5.4. Issues
Lack of drainage network system in the city which would collect convey and dispose the storm
water efficiently.
City is vulnerable to stagnation of water due to lack of an integrated drainage system and
proper disposal mechanism of storm water.
Lack of design considerations and absence topographical analysis results in choking of
existing drains and frequent incidences of water logging. Clogging of existing drains due to
negligent practices of some of the citizens related to the dumping of waste in the drains.
Field surveys and public consultations have revealed that that the silting of natural drains is a
major problem and leads to the improper disposal of storm water which often leads to the
overflowing of storm water.
Encroachment on the open drains is a major cause of concern.
The general street pattern is observed to be narrow with width varies from 6 m to the major arterial
roads to 3 m internal roads, with 1 to 1.5 meter wide earthen roads. The road density comes out to be
1.5 per persons in the town. The total length of the roads in the town is equivalent to 35.5 kms. The
town‟s main spine is state highway, along which the town has started growing now. It is acting as
main road for all institutional and commercial activities. The length of the state highway in the Nagar
Parishad is almost around 4 kms. There are
also few roads under PWD which connects
other villages to the town. Total road length
under PWD is about 1.5 Kms.
Exhibit 6-12 Present and Future Demand and Supply Gaps: Traffic and Transportation
Existing/ desired level Service Levels, Demand and Gaps
Service By Year By Year
Current Desired Existing By Year 2015
head Indicator Unit 2025 2035
level level (2011)
Demand Gap Demand Gap Demand Gap
Road Concrete (%) 50 Km 15.00 5.88 - 7.48 1.60 9.33 1.85
Surface BT (%) 76 50 Km - 23.51 23.51 29.92 6.41 37.30 7.38
Type
WBM (%) 0 Km 6.00 - - - - - -
Cut Stone/ Earthen/
24 0 Km 9.00 - - - - - -
Others (%)
Up BT to Concrete Km - 0.53 3.21
gradation WBM to Black Top Km 6.00 - -
Earthen to Black Top Km 9.00 - -
New Concrete Km - 1.07 1.23
Formation Black Top Km 8.51 6.95 8.00
Source: IMaCS Analysis
6.6.6. Issues
Road Infrastructure: Internal town roads are very narrow, thus are very inconvenient for
vehicular movement. With the demand estimations it is evident that there is a high
Responsibility of supply of electricity to Nasarullahganj Nagar Parishad lies with the Madhya Pradesh
State Electricity Board. Nasarullahganj at present is suffering from an acute shortage of electricity with
long duration of power cuts throughout the day. Table below gives the location and capacity of sub-
stations in or nearby Kannod. (Map in Annexure IV shows the location of substation in Madhya
Pradesh)
400 KV Itarsi
Location of Substation
220KV Hoshangabad, Handia
http://www.mptransco.nic.in
132KV Nasarullahganj, Khategaon
Source: www.mptransco.nic.in
Exhibit 6-14 Present and Future Demand and Supply gaps: Street Lights and Fire Services
Existing/ desired level Service Levels, Demand and Gaps
Service
head Current Desired Existing By Year 2015 By Year 2025 By Year 2035
Indicator Unit
level level (2011) Demand Gap Demand Gap Demand Gap
Spacing
between
83 30 No. 430 980 550 1,247 232 1,554 302
lamp poles
Street (m)
lighting Tube lights
35 75 No. 150 735 585 935 200 1,166 231
(%)
High Power
64 25 No. 275 245 - 312 37 389 77
(%)
High Mast
1 - No. 5 - - - - - -
lamps (%)
New Tube lights No. 585.00 200.00 231.00
Installation High Power No. - 37.00 77.00
Under Ground Cabling
77 Km 16.50 6.96 6.96
(Replacement and New)
Source: Nasrullahganj Nagar Parishad
The present condition of street lights is not very good in the town as the average spacing between
lamp poles is more than the desired as visible in exhibit above. Also, by replacing 150 existing tube
lights with T-5 (28 W) and 275 High Power lamps with CFL (4X36) ULB can save energy of 61228.75
KWh and energy cost saving of Rs 2.6 lakhs per year
6.7.4. Issues
At present a proportion of the street lights comprise of tube lights and halogen lamps which
consumes lot of electricity, there is a need to replace these lamps with CFLs. This would help
cut down on expenses on longer term.
1
Subhash colony and Idgaha 885
2
3
Pakka Kua Kshetra and Jin colony 238
4
6 Muslim Mohalla 508
7 Sabji Mandi Mohalla 309
12
Ayodhya Basti, Bajranj colony and Sarvahra
13 296
colony
14
Source: Detailed Project Report, Integrated Housing and Slum Development Programme (2008)
Location of slums on town map
Map-10 in annexure 4 provides the locations of all the slums present in the town. There are five
identified slums in the town. There are 15 wards in the town and ward no. 1, 2, 3, 4, 6, 7, 12, 13 and
14 has slum.
General characteristics of slum
Slums in Nasrullahganj are in miserable and unhealthy living conditions. Mostly the houses are in
Kutcha state and have shabby structures. The absence of development works like roads, sewer,
water line and proper sanitation in most of the slum areas. Community facilities and social
infrastructure is also missing in the slum pockets. Average built-up area of a unit slum is
approximately 20 sq. m.
Open spaces
Sanitation
Electricity
Sewerage
Housing
Roads
Ward No. Name of Slum
The detailed study under IHSDP shows that majority of slum dwellers live in temporary shelters and
most of the houses are entirely made of make shift materials such as wood, bamboo and
plastic/tarpaulin sheets. Most of the slum residents obtain their water from well or bore well, or from
Nagar Parishad‟s piped supply system. Some bore wells are fitted with individual hand pumps for
local supply, others are fitted with electrically operated submersible pump which pumps water to an
overhead tank from which it is distributed through distribution pipes to a number of stand posts. The
current sanitation alternatives in some of the slum areas of Nasrullahganj comprise an individual pour-
flush latrine. If residents do not have access to one of these sanitation facilities, then the common
practice is defecation in an open space or along a drainage nallahs. Solid waste management in the
slums is handled in the same manner as in the rest of the areas by the local body. As a result of open
defecation, lack of drainage system along the roads and improper sanitation facilities, unhygienic
conditions prevails over there. Other facilities are also lacking in the slums in the town.
6.8.4. Social security schemes and beneficiaries and other schemes
At present, some programmes are going on for poverty reduction/ slum improvement in the town.
These include programmes for provision of infrastructure/ shelter and programmes for slum
improvement/ provision of basic urban services. The Integrated Housing and Slum Development
Programme, is a step towards strengthening of housing and infrastructure projects in the interests of
the urban poor. This programme is also under implementation in the town. The detailed project report
for understanding the existing conditions and suggesting strategies was put forward in 2008. The
project cost is equivalent to Rs. 3.79 crores. The proposed components under IHSDP are:
Housing
Water
It is proposed to improve the water supply system in slums by laying water supply pipe lines.
Sanitation
Need of proper sanitation system and construction of drains as per need.
Roads
The new roads and existing kutcha roads will require entirely new construction.
Social Amenities
It has been proposed to provide Anganwadi for the slums. Other than this, the town has sufficient
educational and health facilities which cater to the slums also.
Financial Arrangement
The town of Nasrullahganj has been included in the IHSDP scheme under the JnNURM. The sharing
of funds would be in the ratio of 80:20 between central government and state Government/ULB.
Exhibit 6-18 shows the components of project under IHSDP.
6.8.7. Issues
Higher proportion of Slum Population: The town has 5 slums, one slum in each ward. The
slum population is about 16 per cent of the total population. These slums are spread all over
Exhibit 6-19 summarizes the current status and Demand-Supply Gap analysis for Health Sector
present in Nasrullahganj town. It also provides a snapshot of comparative analysis of existing level of
service with level of service desired under the Urban Development Plans Formulation &
Implementation (UDPFI) guidelines.
Exhibit 6-19 Present and Future Demand and Supply Gaps: Health
Existing/ desired level Service Levels, Demand and Gaps
Service head
Indicator Current Desired Unit Existing By Year 2015 By Year 2025 By Year 2035
The present condition of Health sector in Nasrullahganj town shows that there is an immediate need
of Nursing Home in the town. There are total six doctors in the town.
6.9.2. Education
The town has two colleges one in ward-11 and another in ward-15. The town has three higher
secondary schools 10 primary schools The town has 14 nursery schools and 11 Anganwadi schools.
The details of the education facility are visible in Exhibit 6-20.
Exhibit 6-21 summarizes the current status and Demand-Supply Gap analysis for Education Sector
present in Nasrullahganj town. It also provides a snapshot of comparative analysis of existing level of
service with level of service desired under the Urban Development Plans Formulation &
Implementation (UDPFI) guidelines.
Exhibit 6-21 Present and Future Demand and Supply Gaps: Education
Existing/ desired level Service Levels, Demand and Gaps
Service head Current Desired Existing By Year 2015 By Year 2025 By Year 2035
Indicator Unit
level level (2011) Demand Gap Demand Gap Demand Gap
Primary Per
1826 2500 No. 10 11 1 15 4 19 4
School population
Per
Middle School 5934 5000 No. 3 4 1 5 1 6 1
population
Per
College 11869 100000 No. 2 - - - - - -
population
Source: IMaCS Analysis
The existing service levels in education sector show a good status. Existing schools are sufficient in
number. The existing schools taken into consideration are just government schools. The problem
faced in the education sector is the lack of basic facilities in the schools.
6.9.3. Recreational facilities (Parks, Playgrounds etc)
The town has one community hall, one sub-complex, one neighbourhood park named after Dr.
Ambedkar Park, one children‟s park, one passenger waiting hall as Immovable property under the
Nagar Parishad. The town has one playground, which is also used for celebrating Dussera.
6.9.4. SWOT analysis
Exhibit 6-22 SWOT Analysis: Social Infrastructure
Strengths Opportunities
Weaknesses Threats
Lack of boundaries to the schools. Lack of maintenance can degrade the existing
Lack of Intermediate hospitals and Poly- infrastructure.
Clinics. Lack of boundaries to the schools could result
Lack of integrated schools and schools for in encroachments.
handicapped. Poor connectivity to the schools could result
Quality of physical infrastructure of this of accidents.
Sector demands major revamping.
6.9.5. Issues
Existing level of service in the health infrastructure demands a major revamping as these fall
among factors which would guide future development of the area.
Government Hospital which receives maximum number of patients from the town and nearby
areas suffers from lack of infrastructure and poor maintenance of buildings and other assets;
also it requires the permanent doctors, at present the doctor‟s travel from other towns to
Nasrullahganj.
A continuous flow of funds needs to be ensured for development of new infrastructure and up-
gradation of existing infrastructure.
Most of the schools of the town lack necessary infrastructure and hence, initiatives should be
taken in equipping existing educational institutions with necessary infrastructure.
6.10. Environment
A town‟s environment is dependent on several factors which impact air quality, water quality, land
quality, noise levels, etc. Each of these aspects gets affected by individual factors or a combination of
two or more factors. Some of these factors are: Shortcomings in Solid Waste Collection, Under-
developed Storm Water Drainage system, Undeveloped Waste water disposal system, Dust and
particulate matters from vehicular traffic and industries, etc.
Under-developed drainage network and undeveloped waste water conveyance system leads to the
stagnation of storm water and waste water in various parts of the city leading to unhygienic conditions
which poses severe threat to the health of the citizens. It is anticipated that vehicular traffic on state
highway will increase over the up-coming years, it will become a constant source of dust and other
particulate matters which pollutes urban space and causes various kinds of respiratory problems to
the citizens.
6.10.2. City green spaces (gardens and recreation – total coverage ratio)
Policies
1. The National Water Policy, 1990
2. Indian National Policy Statement for Abatement of Pollution, 1992
3. National Conservation Strategy and Statement on Environment and Development, 1992
Legal
1. The Motor Vehicles Act, 1939, amended in 1988
2. The M P Public Health Act, 1949
3. The M P Control of Music & Noise Act, 1951
4. The Water (Prevention and Control of Pollution) Act, 1974, amended in 1988
5. The M P Slum Area (Improvement & Clearance) Act, 1976
6. The Water (Prevention and Control of Pollution) Cess Act, 1977, amended in 1991
7. The Air (Conservation) Act, 1980, amended in 1988
8. The Air (Prevention and Control of Pollution) Act, 1981, amended in 1987
9. The Environment (Protection) Act, 1986
10. The Public Liability Insurance Act, 1991, amended in 1992
11. National Environmental Tribunal Act, 1995.
6.10.6. Issues
1. Leakages in Solid Waste Collection System leading to water and land pollution.
2. Clogging of drains and poor waste water handling system leading to threatening environmental
situation.
3. Lack of adequate green cover in the city.
4. Open defecation.
Nasrullahganj Nagar Parishad is the main governing body which operates within the municipal limits
of Nasrullahganj town. It is responsible for the provision of basic infrastructure services to the citizens.
This includes development and operation & maintenance of infrastructure like Water Supply, Solid
Waste Management, Transportation, etc. Most of the Nagar Parishad‟s responsibilities and duties are
governed by MP Municipalities Act. Apart from the provision of basic services, under its purview, to
the citizens, it also coordinates with other departments such as UADD, TCPD, MPHB, Dept. of School
Education, Dept. of Health Education, MPSEB, MPPCB, etc. Nagar Parishad‟s responsibilities include
coordination with other departments in formulating their plans for municipal area and assist them in
the implementation of their plans and schemes. Nagar Parishad translates its responsibilities into
service delivery by means of various sub departments such as General Administration, Water Supply,
Sanitation, Solid Waste Management, Street Lighting, Fire Fighting, Roads, Drainage, Revenue,
Taxation, etc.
The Nagar Parishad is headed by a Chief Municipal Officer, who is appointed by UADD and is
entrusted with the responsibility of all municipal affairs. The elected council headed by Adhyaksha,
leads elected body of 15 elected members from 15 administrative wards. Overall, the executive wing
The exhibit below represents the approved Municipal Cadre for Health, Finance, Administration and
Engineering for Nasarullahganj.
Exhibit 6-25: Approved Municipal Cadre for Health, Finance, Administration & Engineering for
Nasarullahganj
Number of Person
S. No. Type of Cadre Proposed Post
Proposed
1 Health Sanitary Inspector 1
2 Finance Accountant 1
3 Administration Chief Municipal Officer 1
(Class C)
4 Engineering Sub-Engineer 1 (if population is below
20000) & 2 (if population is
between 20000 and 50000)
Source: MPUADD
The main function of the regional offices is to monitor the implementation of provisions of various Acts
governing pollution control and prevention and the Rules framed under such Acts. The pollution
prevention and control Acts include:
MPPCB is also responsible for implementation of the Municipal Solid Waste (Management and
Handling) Rules, 2000 of CPCB, which spell out responsibilities of the state pollution control boards
and the urban local bodies. MPPCB is the monitoring authority with respect to ground water, ambient
air, and compost quality in urban areas. The Board is also required to monitor processing and
disposal facilities for municipal waste, with the approval of the State Urban Development Department,
Town and Country Planning Department, and Ground Water Board. According to the Rules, the ULB
is responsible for implementation of the provisions and infrastructure development for collection,
storage, segregation, transport and processing of solid waste in the town. The major areas of concern
of MPPCB with regards to ULB functions are:
Though roles of different organizations in the provisioning of urban services are clearly
defined, plans formulated by different organizations suffer because of lack of coordination
among various organizations.
Since Nasrullahganj is in transition phase and the large proportion of area under its
jurisdiction is agriculture, various departments who involved in provision of services to rural
areas are still in the process of transferring the roles and responsibilities to respective
departments.
In case of street lighting, responsibility of installation of electricity poles and their electrification
lies with MPSEB. Any failure in the coordination between Nagar Parishad and MPSEB results
in poor urban governance.
MPPCB should be regularly contacted to keep a check on urban environment and curb
pollution.
Nagar Parishad should maintain a healthy interaction for effective and comprehensive city
planning.
Meetings at regular intervals should be organized between various governing organizations
for effective urban governance.
Revenue income of Nasrullahganj has grown at a CAGR of 36.2% from Rs 94.9 lakhs for FY 2007-08
to 239.5 lakhs for FY 2010-11.However revenue expenditure has grown at a CAGR of 40.8% from Rs
62.7 lakhs for FY 2007-08 to 175.3 lakhs for FY 2010-11.
Capital Account
Receipts 93.62 108.05 194.82 380.58 59.60
Tax Revenue
Tax revenue comprises of property tax, integrated tax, education cess, export tax, advertisement tax
and other taxes. We can see that property tax and integrated tax constitute more than 50% of the Tax
Revenue except for 2010-11 where export tax has contributed about 40% of the tax revenue (Exhibit
7-3).
Key Observation:
The share of export tax has increased considerably over the last 4 years from around 5% in FY 2007-
08 to approx. 40% in FY 2010-11. If this trend continues then we can expect the share of tax revenue
to total revenue to increase from 6 % to double figures in the coming years and dependence on
external funds would be reduced.
We can observe that other non-tax revenue except listed in the table below accounts for the
maximum share of non-tax revenue in all the four years . Others consists of income from water taxes ,
charges for water tankers etc. While rental income from municipal properties happens to be the
second highest among the non-tax revenue source .
As we can observe from the pie chart below that O&M is the second highest revenue expense
accounting for 32% of the total. In case of O&M cost, major expenditure is towards water works. O&M
expenditure has increased and has a positive CAGR of 15.5% over the last 4 years.
Administrative expenses includes stationary, printing expenses, furniture, advertisement, photo copy
and other expenses which are accounting for 2 % of the total. Programme expenses include mid-day
Observations
Operating Ratio: The average operating ratio of the Nasrullahganj Nagar Parishad is 0.64 which is
less than 1, indicating that Nasrullahganj revenue expenditure levels are lower than the revenue
income generated. This might also indicate that the revenue income is being utilized for paying off
capital expenditure since capital utilization ratio is more than one in 3 years .
Capital Utilization ratio: Average Capital utilization ratio of Nasrullahganj Nagar Parishad is 1.10
which is more than 1, indicating that Nasrullagunj‟s capital expenditure is more than it‟s income . It
also means that they are utilizing their revenue income for capital purposes . This kind of capital
expenditure is good for the Nagar Parishad in the long term and will accrue benefits to the people
residing in the village .
Salaries expenditure to revenue income: approximately 34% of the revenue income is utilized for
paying the staff employed by Nagar Parishad.
7.5. Issues
Capital Utilization ratio is more than one, indicating that expenditure is more than the capital
income. This indicates shortage of capital funds under various schemes.
Tax revenue accounts for only 6.16 % of the total income, which is very less. There seems to
be a need for rationalization of different types of taxes.
7.6. Conclusion
This chapter dealt with the analysis of municipal finance and the financial health of Nasrullahganj
Nagar Parishad. The next chapter deals with City Vision, Sector Goals, Strategies, Action Plan,
Projects and Prioritization.
2. To actualize the city’s existing economic potential and generate new opportunities for the
prosperity in all sections of the community.
An economic development plan should be devised for the harnessing of city‟s economic potential. It
should concentrate on the diversification of economic base of the city so as to reduce dependence on
any particular factor.
3. To develop & promote special economic activity and training centres for women.
Special training centers should be developed for women so that all the women can get trained in
various economic activities irrespective of their literacy level. Special community based economic
activities should be designed such as handicraft activities, household food products etc so that every
women should be part of gainful economic activity.
4. To uplift the urban poor and bring them at par with other sections of the community.
A comprehensive upliftment plan, comprising of employment generation, provisioning of basic
infrastructure and equal access to social infrastructure, for urban poor should be prepared to address
the existing disparity among the various sections of the community.
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-1.
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-4. The
list of identified projects recommended under CDP, is preceded by a list of on-going Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of on-going Projects in addressing
the expected demand has also been considered while identifying the projects for Horizon-1 (Short
term) and Horizon-2 (Long term).
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-6.
In addition to above area, a constant effort should be devoted towards “Community participation and
awareness campaign for the proper maintenance of Public Toilets” and “Cost Recovery through
collecting the user charges.”
Exhibit 8-7 Sewerage & Sanitation Long Term and Short Term Interventions
Laying of underground drainage system of 41.97 km by 2035.
Sector
Construction of a sewerage system (DEWAT System) which can handle a treatment
Interventions
capacity of 5.26 MLD.
Required
Addition of around 37 Public Toilet seats.
Expected Synchronisation with water supply capacity, ability to meet service level targets and
Outcome disposal norms.
Table given below shows broad action plan needed in sewerage and sanitation sector.
For meeting the demand arising in 2035, the following sub projects are being recommended and
would have to be executed by the ULB.
Nasrullahganj has less than 25% area as development land but the settlements in the town are
spread over the entire area and are not concentrated together at one place, therefore it would be
beneficial for the town both financially and for operations and maintenance to implement
Decentralized Waste Water Treatment System (DEWATS) for comprehensive sewerage system, and
dispose-off generated sewage. This DEWAT system take into care the demand generated in the year
2035. The advantages of DEWAT system are that; it requires minimum space and hence be
accommodated easily under paved pathways and parking lots etc. or small available spaces; It
requires lesser energy and operation cost; This system promotes the reuse of water for non-potable
purposes; It can be easily blended with the landscape; It cannot be switched off so it ensures efficient
working irrespective of external factors and it can treat waste water with high fat, suspended solids
and BOD. Since this system is decentralized, the zones would be defined as per population and
location for DEWATS and the treatment system would be developed to safely dispose-off the sewage.
The treated water can be used for agricultural use.
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-9. The
list of identified projects recommended under CDP, is preceded by a list of on-going Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of on-going Projects in addressing
the expected demand has also been considered while identifying the projects for Horizon-1 (Short
term) and Horizon-2 (Long term).
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-11.
Exhibit 8-12 Solid Waste Management Long Term and Short Term Interventions
Promoting door-to-door collection
Sector
Up-gradation of the infrastructure required for effective collection and disposal of waste
Interventions
Adoption of scientific technology for disposal of waste
Required
Improve the skills of the conservancy staff
Hygienic conditions and a clean city
Expected
Waste segregation at source
Outcome
Suitable treatment for different kinds of waste
Exhibit 8-13 Projects Identified by ULB and Consultant for SWM Sector
ULB’s Suggestion Project’s Proposed
Effective collection of waste
Solid Waste Management system for Nasrullahganj
Proper disposal of collected waste
Project Rationale Sub- Projects
As per the demand assessment, in 2025, Promoting door-to-door collection
Nasrullahganj would generate 9.42MT of waste daily. Augmenting Collection Infrastructure
To effectively handle the generated waste, a pre- Development and augmentation of landfill site
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-14. The
list of identified projects recommended under CDP, is preceded by a list of on-going Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of on-going Projects in addressing
the expected demand has also been considered while identifying the projects for Horizon-1 (Short
term), and Horizon-2 (Long term).
Method to prepare Vermin-Compost: The MSW is segregated i.e. all the dry wastes such as clothes,
carry bags and other dry wastes are segregated from wet waste. A thatched roof shed preferably
open from all sides with unpaved (Kutcha) floor is erected in East West direction length wise to
protect the site from direct sunlight. A shed area of 12‟X12‟ is sufficient to accommodate three vermin
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-16.
Sector Cleaning/ desilting of the existing natural drains, this will also include the removal of
Interventions encroachments.
Required Construction of new storm water drains and up gradation of existing drains.
Expected
Universal coverage and disposal capacity
Outcome
Development of Root Zone Treatment System (RZTS): It is observed that the sewage flowing
through nallahs joins Rivers in untreated condition and creates heavy risk of river pollution. Storm
water can be treated as well with RZTS after removal of settle able substances. It is a low-cost and
maintenance free option that uses the capacity of plants (especially certain reeds – hence also called
reed bed technology) to absorb contaminants and structurally modify them for treating water. It is
based on the principle of attached growth biological reactors similar to conventional trickling filters
with combination of aerobic and anaerobic zones. The contaminants present in the wastewater are
treated as they seep through the root-zone of the plants by a combination of plants, soil bacteria and
hydraulic flow systems resulting in physical, chemical, and microbiological processes. Oxygen present
in the zone facilitates the degradation of wastewater. A wide variety of microorganisms present in the
root-zone of the plants results in efficient removal. There is efficient reduction of pathogens also by
percolation through the bed material. Thus, it can be developed in Nasrullahganj along storm water
drains.
Exhibit 8-18 Projects identified by ULB and Consultant for Storm Water Drainage
ULB’s Suggestion Project’s Proposed
Scheme for augmenting storm water drainage network Storm Water Drainage network for the town of
for the town Nasrullahganj
Project Rationale Sub- Projects
According to normative standards, the length of the Cleaning/Desilting of natural drains such as nallahs
drains are assumed at 130% of road length flowing from west to east part of the city.
considering all divided roads to have drains on either Construction of 8.04 km of Pucca closed drains
side and undivided roads on at least one side. Further and 3.96 km of Pucca open drains by 2035
the drains in the initial phase shall be open and
subsequently be made closed; hence the investment is
towards up-gradation annually and for construction of
new closed drains. All existing open drains shall be first
upgraded to closed drains and subsequently new
drains shall be constructed.
Prominently, all the road and storm water projects are
to be taken up simultaneously to match the levels of
the roads with the drains and allow draining of rain
water from the city.
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-19. The
list of identified projects recommended under CDP, is preceded by a list of on-going Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of on-going Projects in addressing
Finalizing the sub projects to be undertaken Nasrullahganj Nagar Parishad in consultation with
Councilors and other stakeholders
Preparation of DPR for finalized projects Nasrullahganj Nagar Parishad
Submission of DPR to funding agency Nasrullahganj Nagar Parishad
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-21.
Ensure free flow of traffic through junction improvement, signalization, and traffic control and
management measures.
Efficient use of existing infrastructure – removal of impediments – including enhancement of road
infrastructure and provision of efficient parking facilities
Medium term action plan aimed at development of transport infrastructure for a period of 5-10
years to bring about coordinated development among different components. These measures
typically will include various infrastructure projects, which will be directed at network
improvements such as parallel roads, link roads, slip roads, etc.
Long-term action plan aimed at development of structure plan for the Urban Area with Transit as
one of the lead components, which will direct the urban growth so as to bring about a structural fit
between transit infrastructure and Urban Growth.
The broad sector interventions to address both the short and long term requirements have been
enlisted below:
Exhibit 8-22 Traffic and Transportation Long Term and Short Term Interventions
Construction of new roads in areas which are at present earthen.
Sector New roads to cater to missing links and developing areas
Interventions
Required Development of Parking Spaces
Improved bus stand and related amenities
Outcome Improved connectivity, Hassle-free travel on roads, safe driving during nights
Exhibit 8-23 Projects identified by ULB and Consultant for Traffic & Transportation Section
ULB’s Suggestion Project Rationale Project’s Proposed
The projects identified to meet the Gaps (Demand-Supply) in this sector are listed in Exhibit 8-24. The
list of identified projects recommended under CDP, is preceded by a list of on-going Projects. In
addition to the estimated Gaps (Demand-Supply), the contribution of on-going Projects in addressing
the expected demand has also been considered while identifying the projects for Horizon-1 (Short
term) and Horizon-2 (Long term).
Finalizing the sub projects to be undertaken Nasrullahganj Nagar Parishad in consultation with
Councilors and other stakeholders
Preparation of DPR for finalized projects Nasrullahganj Nagar Parishad
Submission of DPR to funding agency Nasrullahganj Nagar Parishad
Exhibit 8-27 Street Light and Fire Fighting Projects: Responsible Agencies
Immediate measures to be taken Authorities/Agencies responsible
Finalizing the sub projects to be undertaken Nasrullahganj Nagar Parishad in consultation with
Councilors and other stakeholders
Preparation of DPR for finalized projects Nasrullahganj Nagar Parishad
Submission of DPR to funding agency Nasrullahganj Nagar Parishad
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-29.
Exhibit 8-30 Health Sector Long Term and Short Term Interventions
Sector Increase in number of doctors and bed capacity of town
Interventions Development of necessary infrastructure
Required Primary focus on primary healthcare and control on the preventable diseases
8.2.9. Education
Sector Goals
“To achieve a 100% literacy rate with student-friendly educational institutions”
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-33.
Exhibit 8-34 Education Sector Long Term and Short Term Interventions
Sector Development of necessary infrastructure
Interventions Awareness generation
Required Enforcement of regulations on private schools
100% enrolment in primary schools
Expected
Achievement of prescribed teacher-student ratio
Outcome
100 % literacy rate
As discussed earlier, Nagar Parishad‟s role in this sector is limited to the provision of providing basic
services and catalyzing involvement of other departments. Availability of land is a necessity in this
sector for which Tehsil office should be consulted.
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided in Exhibit 8-37.
Exhibit 8-38 Other Social Infrastructure Long Term and Short Term Interventions
Sector Allocation and Identification of land
Interventions Land acquisition
Required Up gradation of existing facilities
Expected Improved quality of life
Outcome Improved access to the recreational facilities
Considering the stakeholders view and standard guidelines, following projects have been proposed in
the town:
1. Community Rooms: At present Nasrullahganj has one community hall but the infrastructure
provision of the same has to be revamped.
2. Parks: The vacant land in the city should be identified and developed as parks to serve the dual
purpose of increasing the green cover in the city and provide citizens with open spaces for
recreation.
Exhibit 8-39 Other Social Infrastructure: Responsible Agencies
Immediate measures to be taken Authorities/Agencies responsible
Finalizing the sub projects to be undertaken Nasrullahganj Nagar Parishad
Preparation of DPR for finalized projects Nasrullahganj Nagar Parishad
Submission of DPR to funding agency Nasrullahganj Nagar Parishad
8.2.11. Environment
Sector Goals
“To accomplish clean, green and safe living environment for all citizens”
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are provided below. These areas have been identified on the basis of workshops, consultations and
review of best practices in the sector.
1. Air Quality: Periodic monitoring and review is essential to check air quality. To create awareness
amongst user groups, the status of air pollution may be revealed through display systems
instituted at major locations in the city. Suitable plantations or green cover should be provided on
major routes to supplement better air quality. This would partially be addressed by the
development of Parks in the town and a massive tree plantation drive.
2. Water Pollution: Efforts/schemes should be designed to check the diversion of sewage flow into
major Nallahs through appropriately located sewage treatment plants. Considering the issues
related to the demand for treating large amounts of sewage generated in Nasrullahganj,
decentralized sewage treatment is recommended. This aspect would be addressed by the
development and up gradation of Sewerage & Sanitation facilities, Storm water drainage
infrastructure and strengthening of solid waste collection/transportation system.
3. Development of a Regional Plan: To ensure sustainable development with optimum resource
utilization, it may be necessary to develop a Nasrullahganj Regional Plan or Master Plan. For
maintenance of open space, the planning authority at the regional level should prepare a detailed
inventory of the space and explore its probable multiple uses or forms for recreation and visual
pleasure. Possibilities to include the private sector for maintenance of these areas should be
explored.
8.2.12. Economic Development
Sector Goals
“Sustainable economic development on the basis of inherent strengths of the city through
promotion of health, education, tourism and industrial sectors – focus on local employment
opportunities”
Incentivizing agriculture,
Strengthening the markets,
Improving transportation infrastructure,
Exhibit 8-40 Economic Development Long Term and Short Term Interventions
Sector Rejuvenation of trade and commerce
Interventions Development of an industrial area
Required Promotional activities to showcase Nasrullahganj potential
Expected New employment opportunities
Outcome Improved average income and access to better facilities
Projects Envisaged
For promoting economic development of the town, following projects have been envisaged for
Nasrullahganj.
Key areas which would be addressed by detailed strategies and action plan to meet the sector goal
are:
If we talk of priorities within particular sectors, currently within social infrastructure, Government
hospital facilities need to be enhanced followed with development of new markets. It is felt that
blocked drains are a major cause for non-performing drainage infrastructure which is also
complimented by road encroachment which is a major traffic concern. Talking of water supply in the
town, currently, insufficient water supply and poor quality of water are priority concerns, though it is
believed that the project in pipeline would address these to satisfaction.
Supply Hours 1
Water quality 2
Availability of water 3
Cost 4
others 5
Source: IMaCS Analysis
Blocked Drains 1
Encroachments 2
Open Drains 3
Coverage 4
others 5
Source: IMaCS Analysis
Encroachments 1
Road Width 2
Parking 3
Coverage 4
others 5
Source: IMaCS Analysis
Collection 3
Cleanliness of Roads 4
Others 5
Source: IMaCS Analysis
Girls‟ Schools 2
Degree college 3
High school 4
Government Hospitals 1
Dispensaries 2
Others 4
Source: IMaCS Analysis
Market 1
Hotel/Restaurants 2
Parks 3
Street Shops 4
Movie Hall 5
Playground/Stadium 6
Source: IMaCS Analysis
8.4. Conclusion
This chapter dealt with the city vision, sector goals and sector strategies to achieve sector goals. The
discussion on sector strategies was followed by the identification of interventions required in every
sector. This was followed by the identification of projects and project implementation agencies.
The strategies adopted primarily have three dimensions; improving the service delivery by efficiency
measures, improving service delivery by creating infrastructure assets and improving the governance
aspects of Nasrullahganj Nagar Parishad. This section summarizes the capital investments required
for creating infrastructure assets and various strategic interventions required in the implementation of
such projects; these strategies are both investments oriented and administrative oriented.
City growth and infrastructure needs (to be carried out once every five years);
Scheduling of investments of ongoing projects due to cost and/ or time overruns;
Assigning of priorities within the constraints of available financial resources.
In Nasrullahganj, Nasrullahganj Nagar Parishad has the primary responsibility of delivering municipal
services. So the CDP proposals will have to be implemented by the Nagar Parishad. The projects,
prioritization, investment phasing, strategies and action plan are framed accordingly.
The CIP involved the identification of public facilities to cater demand of the city populace in the years
2015, 2025 and 2035. The projects have been identified through a demand-gap analysis for various
urban services. Identification of projects was followed by their prioritization based on the stakeholder‟s
consultation. The projects identified are aimed at ensuring the optimal and efficient utilization of
existing infrastructure systems and enhancing the capacity of the systems/services to cater to the
demands of future population. In addition to the projects which are related to major urban services,
CIP also includes developmental projects like greenery development, parking spaces, system
modernization etc.
The planning horizon for the projects has been considered on the basis of demand generation in
various decades and degree of initial capital investment. Hence, some of the sectors have been
planned for the short term as well as the long term whereas some sectors have been divided into
various sub-parts in which some of the sub-parts have been planned for the long term only whereas
rest of the sub-parts have been planned for short term and long term.
The phasing of the identified projects and investments is based on the following principles.
Priority needs, with developed areas receiving priority over future development area;
Inter and intra-service linkages, viz. water supply investments shall be complemented by
corresponding sewerage/ sanitation improvements;
Size and duration of the requirements, including preparation and implementation period.
Exhibit 9-1 presents the summary of sector-wise total investment need, investments up to 2015-16,
proportions of investments required in various sectors w.r.t total investments in different horizons.
Total
Investment Investment Investment
Investment
S. Need till Need 2015- Need 2025- Implementing
Sector Need till
No. 2015 25 35 Agency
2035
(in Rs Lakh) (in Rs Lakh) (in Rs Lakh)
(in Rs Lakh)
Nasarullahganj
1 Water Supply 412.51 407.33 508.25 1,328.08 Nagar
Parishad
Nasarullahganj
2 Sewerage 176.78 138.19 188.11 503.09 Nagar
Parishad
Nasarullahganj
Storm Water
3 459.23 434.84 539.80 1,433.87 Nagar
Drainage
Parishad
Nasarullahganj
Solid Waste
4 37.77 91.05 69.41 198.23 Nagar
Management
Parishad
Nasarullahganj
5 Sanitation 9.16 - - 9.16 Nagar
Parishad
Traffic & Nasarullahganj
6 757.72 570.70 567.49 1,895.91
Transportation Nagar
Nasarullahganj
Electricity & Street
7 357.39 172.04 181.34 710.77 Nagar
Lighting
Parishad
Nasarullahganj
8 Fire Fighting - - Nagar
Parishad
Nasarullahganj
Basic Services for
9 120.00 - - 120.00 Nagar
Urban Poor
Parishad
Nasarullahganj
10 Environment 17.00 8.50 4.50 30.00 Nagar
Parishad
Nasarullahganj
11 Urban Governance 12.00 4.00 4.00 20.00 Nagar
Parishad
Nasarullahganj
12 Heritage - - - - Nagar
Parishad
Nasarullahganj
Nagar
Parishad,
13 Education - 390.00 390.00 780.00
Department of
Education,
GoMP
Nasarullahganj
Nagar
14 Health 1,059.00 413.50 422.00 1,894.50 Parishad,
Department of
Health, GoMP
Social Infrastructure
Nasarullahganj
& Other Projects
15 215.00 5.00 205.00 425.00 Nagar
(Economy and
Parishad
others)
Total 3,633.56 2,635.16 3,079.90 9,348.61
Source: IMaCS Analysis
As can be observed from Exhibit 9-1, a total 48% of the total identified investment need is proposed
for funding by 2015 Within the total investment proposed by 2015 for Nasrullahganj Nagar Parishad,
maximum share has been taken by the Water Supply at more than 26 % . Roads and Transport and
storm water drains at 15% and 13% respectively. Health sector envisaged the investment at 6.6 %.
Housing for Urban Poor accounts for 16.8 % of the total investment, while Sewerage and sanitation
accounts for 10.84 % of the investment.
Subsequent sections provide an investment snapshot for each of the sectors followed by the detailing
for Priority needs and Long Term needs. Discussion on Investment is followed by an Action plan for
the implementation of projects in the short term i.e. for a period of five years from year 2011 to 2015
Investments in different time-periods for various sectors are provided in subsequent sections. The
investments have been estimated for three terms, namely:
Investment Snapshot
A sector wise investment plan was devised for the Water Supply considering the demand arising in
the short, medium and long terms. The short term is being defined as a planning horizon of 5 years
from year 2011 to 2015 whereas medium term and long term are being considered as 10 years from
year 2015 to 2025 and year 2025 to 2035 respectively. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-2.
Water sector needs a total investment of Rs 1227.96 Lakhs in three phases by year 2035. In the
short term, this sector would require an investment of Rs 987.31 Lakh whereas in the long term,
investments of Rs 240.67 Lakh would be required.
The Action Plan, as shown in Exhibit 9-3, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Investment Snapshot
A sector wise investment plan was devised for the Sewerage & Sanitation considering the demand
arising in the short, medium and long terms. The infrastructural requirements of a sector have been
classified into various components for which cost estimates are provided in Exhibit 9-4.
Investment Snapshot
A sector wise investment plan was devised for the Solid Waste Management sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-6.
Solid Waste Management sector needs a total investment of Rs 199 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 37.98 Lakhs whereas in the
medium term and long term Rs 91.72 Lakhs and Rs 69.90 Lakhs would be required respectively.
9.4.4. Drainage
To meet the formulated sector goal with satisfactory level of service indicators, the sector would
require an investment of Rs1,164.2 Lakh i.e. around 37% of total investment estimated under City
Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
Storm Water Drainage sector needs a total investment of Rs 1,164.42 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 481.91 Lakhs whereas in the
medium term and long term Rs 329.55 Lakhs and Rs 352.96 Lakhs would be required respectively.
Drains Up gradation
Capital Drains New Formation
Facilities Desalting & Strengthening of Primary
Drains
Action Preparation of DPR for augmentation of storm water system in the town
Measures Isolate sewerage system from drinking water and storm water lines
Identify, delineate, sanitize and protect the natural drainage system of the city
Sector Notes Improve drainage network on a priority basis in flood prone areas
All new roads to be designed shall have adequate provision for storm water drains.
Constructing new drains shall be integrated with the new roads development
Performance Drainage network should 130% of road length
Monitoring All divided roads to have drains on either side and undivided roads on at least one
Indicators side
Drains to be cleaned before and after monsoon for better functioning
Investment Snapshot
A sector wise investment plan was devised for the Solid Waste Management sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-10.
The Action Plan, as shown in Exhibit 9-11, also discusses about various Support & System
Sustenance measures, Action Measures, Sector Notes and Performance Monitoring Indicators.
Investment Snapshot
A sector wise investment plan was devised for the Street Lighting sector considering the demand
arising in the short, medium and long terms. The infrastructural requirements of a sector have been
classified into various components for which cost estimates are provided in Exhibit 9-12.
Street Lighting & Fire Fighting sector needs a total investment of Rs 192.21 Lakhs in three phases by
year 2035. In the short term, this sector would require an investment of Rs 99.75 Lakhs whereas in
the medium term and long term, investments totaling to Rs 40.42 Lakhs and Rs 52.04 Lakhs would be
required.
Investment Snapshot
A sector wise investment plan was devised for the Health Infrastructure sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-14.
Health Infrastructure sectors needs a total investment of Rs 1079.50 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 244 Lakhs whereas in the
medium term and long term Rs 413.50 Lakhs and Rs 422 Lakhs would be required respectively.
Action Augmentation of Bed Capacity of the city by either developing new facilities or
Measures upgrading the existing ones
Development of Nursing home and Dispensaries
Generating awareness about safe sanitation
Sector Notes Provisions should be made for the optimal utilization of health infrastructure by
tackling obstacles like shortage of power, medical staff, etc
Primary care should be given due importance
Hospital waste should be properly disposed
Investment Snapshot
A sector wise investment plan was devised for the Education Infrastructure sector considering the
demand arising in the short, medium and long terms. The infrastructural requirements of a sector
have been classified into various components for which cost estimates are provided in Exhibit 9-16.
Education Infrastructure sectors needs a total investment of Rs 975 Lakhs in three phases by year
2035. In the short term, this sector would require an investment of Rs 195 Lakhs whereas in the
medium term and long term, investments Rs 390 Lakhs and Rs 390 Lakhs would be required
respectively.
Investment Snapshot
Socio-Cultural Infrastructure needs a total investment of Rs 88 Lakhs in three phases by year 2035.
In the short term, this sector would require an investment of Rs 22 Lakhs whereas in the medium
term and long term Rs 22 Lakhs and Rs 44 Lakhs would be required respectively.
Investment Snapshot
An investment plan was devised for the improvement of urban environment considering the future
threats in the short, medium and long terms. The initiatives have been classified under various tasks
as shown in Exhibit 9-20.
This sector needs a total investment of Rs 60 Lakhs in three phases by year 2035. In the short term,
this sector would require an investment of Rs 35 Lakhs whereas in the medium term and long term
Rs 17.50 Lakhs and Rs 7.50 Lakhs would be required respectively.
9.7. Capital needs/ investments – Urban Poor and their accessibility to Basic
Services
To meet the formulated sector goal, an investment of about Rs 621.25 Lakhs i.e. 8.15 % of total
investment estimated under City Investment Plan as shown in Exhibit 9-1.
Investment Snapshot
An investment plan was devised in line with the IHSDP scheme for the provision of basic services to
the urban poor. The investment anticipated for various tasks is shown in Exhibit 9-22.
Provision of basic services to the Urban Poor needs a total investment of Rs 621.25 Lakhs. It has
been assumed that identified projects will be carried out in the short term with the aim of providing
quick respite to the urban poor.
Investment Snapshot
A sector wise investment plan was devised for the Urban Infrastructure considering the demand
arising in the short, medium and long terms. The infrastructural requirements of a sector have been
classified into various components for which cost estimates are provided in Exhibit 9-24.
Urban Infrastructure needs a total investment of Rs 20 Lakhs in three phases by year 2035. In the
short term, this sector would require an investment of Rs 12 Lakhs whereas in the medium term and
long term Rs 4 Lakhs and Rs 4 Lakhs would be required respectively.
Following chapter details about the existing plan under which these investments can be considered.
1. Grants available under the State scheme Framework (as 30 per cent State Govt. Grants).
2. Available internal resources and improving upon the same through by following methods:-
a. Revision of the Unit Area Value at certain levels, which would lead to revision in Annual letting
Value (applicable for Nasrullahganj Nagar Parishad )
b. Revision of Water charges at specific intervals. Though the revision in water tariff should be
done on annual basis to recover 100% of the O&M cost. However, annual revision is not a
general practice in all the ULBs across the state, so revision after every five years is
envisaged for projections.
The increasing urbanization and population has led to the deterioration of the existing urban
infrastructure of the towns and cities in the state and across the country. In order to tackle this
situation and implement the projects identified under CDPs, the state government of Madhya Pradesh
has launched the few schemes namely chief minister urban infrastructure scheme, chief minister
water supply scheme. The funds under the schemes discussed can be utilized to develop the projects
suggested in the CIP.
This scheme aims to develop the projects identified under the CDPs along with the other
infrastructure developments in the town. The duration of the scheme is for 10 years and it includes all
the Nagar Nigams, Nagar Palika and Nagar Parishads in the state. The nagar Parishads would be
entitled to Rs. 1 Crore fund by the state government every year.
Grants to be given for developing transport infrastructure, social infrastructure, parks and playgrounds
is discussed below
This scheme aims at taking up new water supply schemes and ongoing water supply schemes which
are short of funds. This scheme is for a period of 10 years and extends to all the Nagar Nigams,
Nagar Palikas and Nagar Parishads of the state. The towns will be prioritized on the basis of property
tax collection from the ULBs. The towns making a property tax collection of more than 50% would be
preferred, besides this, it is mandatory that the property tax collection of the selected town should be
85% after receiving the grant within a period of 3 years.
Funding for towns less than 50000 population- 30% grant and the remaining 70% would be arranged
by the ULB from its revenue and loans from financial institutions.
A spreadsheet FOP model has been customized to depict the financial position of Nasrullahganj
Nagar Parishad; the investment sustaining capacity of Nagar Parishad is assessed based on the FOP
assumptions. The model was used to calculate future surpluses under various scenarios involving
combinations of internal revenue improvement, state support, financing terms, etc.
10.4. F
und Requirement
For the identified investment for Nagar Parishad of Rs. 26.37 crore at constant prices only Rs. 13.32
crore is sustainable. Exhibit 10-4 shows the funding pattern for sustainable investment
From the above analysis, it is very clear that ULB alone even with the grant support under UIDSSMT
scheme and reforms will not be able to implement 100% of the projects identified under the City
Investment Plan (CIP). But they can substantially increase their sustainable capacity with these
reforms. So, it is recommended that ULB along the support from UADD, GoMP should try to develop
few projects at PPP model and additional grant support from GoMP.
It is also recommended that on the same lines of the National Urban Information System (NUIS)
programme for strengthening of information system at Nagar Parishad level, GoMP should also
provide support to all the local bodies in Madhya Pradesh, which are not covered in the mentioned
programme.
10.6. Conclusion
This chapter discussed the Investment sustainability of Nasrullahganj Nagar Parishad. The discussion
on assumptions for various financial projections was followed by detailing of investment capacity of
ULB. The investment capacity was analyzed for four scenarios; Base case, PT improvements &
The main thrust of the revised strategy of urban renewal is to ensure improvement in urban
governance so that Urban Local Bodies (ULBs) and parastatal agencies become financially sound
with enhanced credit rating and ability to access market capital for undertaking new programmes and
expansion of services. In this improved environment, public-private participation models for
provisioning of various services would also become feasible.
Among various schemes aimed at the urban renewal, the most important schemes are Jawaharlal
Nehru National Urban Renewal Mission (JNNURM) and Urban Infrastructure Development Scheme
for Small & Medium Towns (UIDSSMT). Whereas JNNURM has its own selection criteria for the cities
which can receive funding under it, UIDSSMT expands the ambit of beneficiaries to cover all
cities/towns as per 2001 census excepting cities/towns covered under JNNURM.
UIDSSMT aims at improvement in urban infrastructure in towns and cities in a planned manner. To
achieve this objective, State Governments, Urban Local Bodies and parastatal agencies are required
to accept implementation of an agenda of reforms as funding under UIDSSMT has been linked with
the ULBs performance towards the implementation of anticipated reforms.
The proposed reforms at various level of governance have been categorized into:
Current Status
Current Status
GoMP has issued instructions to ULBs to disclose as much information as possible through different
means such as web sites, notice board, etc.
Current Status
Earlier Stamp duty rates in Madhya Pradesh stood at 7.5% of the Market value. The rates have been
reduced to 5%, and are in effect from 1st April 2011. The computerization of whole system is also in
the progress.
Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in the Repeal of ULCRA with the
objective of increasing the supply of land in the market, removing the inefficiencies and in the
establishment of an efficient land market.
Current Status
The ULCRA has been repealed in the year 2000.
Current Status
The MP Parisar Kirayedari Vidheyak, 2010 was passed by the State Assembly in March, 2010. Thus,
the reform for rent control in the state has been partially achieved. Bill has been sent to GoI for
Presidential Assent.
Current Status
Completed – Mohalla samiti are formed as the third tier. Provisions have been made in Municipal Acts
and Rules have been framed for prescribing procedure.
Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in the area of city planning, with
an objective to assign or associate elected ULBs with “city planning functions”.
Current Status
In this area, all reforms have been achieved with the transfer of powers related to the provisioning of
water supply & sewerage, public transport and solid waste management. This has been supported by
the association of ULB with city planning functions. This has been achieved by the active participation
of ULB in the preparation of city development plans.
Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in Municipal Accounting, with the
objective of having a modern accounting system based on double-entry accrual principles, leading to
better financial management, transparency and self-reliance.
Current Status
1. At present, Double Entry Cash Base system of accounting is being followed in NPP.
2. Double Entry Accrual Base accounting has not been adopted in the NPP.
3. State has drafted its own accounting manual which has been revised as per the provision of
NMAM.
4. State has not modified its current laws and regulations to be in compliance with the double entry
accrual based accounting.
5. A resolution has been passed by Government expressing commitment to establish modern
municipal accounting system.
Timeline for Reforms
With the growing thrust on adoption of double entry accrual base system of accounting in state and its
several advantages over the existing system, Nasrullahganj Nagar Parishad should strive to shift to
the new system on the immediate basis. It should carry out all the requisites and migrate to the new
system by year 2014-15. It is also recommended that Nasrullahganj Nagar Parishad should adhere to
timelines, provided in Exhibit 11-1, to achieve the objectives of this reform by year 2015-16.
11.3.2. E-Governance
Desired Objective
UIDSSMT requires certain reforms to be undertaken by states/ cities in E-Governance, with the
objective of having a transparent administration, quick service delivery, effective MIS, and general
improvement in the service delivery link.
Current Status
Till now, none of the services has been covered by e-governance applications. The applications which
were proposed to bring under e-governance are registration of births & deaths, public grievance
redressal, payment of property tax and bills of other utilities, municipal accounting, works
management system, etc.
Current Status
At present, Nasrullahganj Nagar Parishad levies user charges only for Water supply. Nasrullahganj
Nagar Parishad charges Rs 2650 and Rs 3750 as connection fee for domestic and commercial new
connection respectively. The tariff structure is based on flat rate. The tariff for domestic connection is
Rs 50 per month and commercial connection is Rs. 100 per month.
Current Status
The Nagar Parishad attempts to universalize the coverage of services such as water supply,
sanitation, solid waste management and other infrastructure facilities but has not achieved any break
through due to the location disadvantage of these areas and inadequacy of funds available. Nagar
Parishad has also been coordinating with other agencies for the universalization of services like
health and education.
Current Status
State has identified all Urban Below-Poverty-Line families using financial and non-financial criteria.
While financial criterion uses monthly income as the parameter, non-financial criterion attempts to
cover social factors such as housing, water & hygiene, education, literacy, employment, etc.
Current Status
Currently, Nasrullahganj Nagar Parishad levies property tax on residential, commercial properties and
its collection during the year 2010-11 was Rs. 111087. The property tax is being calculated on the
basis of Unit Area method.
11.5. Conclusion
This chapter provided the objectives and status of various reforms mandated under UIDSSMT. The
reforms were discussed under the headings of Mandatory Reforms at State level, Mandatory Reforms
at ULB level and Optional Reforms at State and ULB level.
In addition to the above, eminent citizens, press and members from other associations were also
present. Total headcount of the workshop was approximately seventy.
The presentation by IMaCS familiarized the stakeholders with the purpose, process, and expected
outcomes of the CDP study. Members were then requested for their views and suggestions in
formulating the City Development Plan with key stress on following areas:
A few sector wise suggestions that came out of the discussion are as under
Water Supply: Water being an essential and a vital need, needs a proper conservation and a
harvesting plan to provide the town with adequate water supply when required. During the time span
when water sources get fully exhausted, the city needs are fulfilled by various sources like tankers
etc.
Sewerage & Sanitation: The city in general is not equipped with a Sewerage system. A sewerage
system should be developed at the earliest.
Solid Waste Management: Major concern is disposal of solid waste. New disposal sites need to be
identified and existing disposal sites should be properly maintained according to recognized norms in
practice. Best practices from other places can be used to improve the efficiency, effectiveness and
collection of solid waste collection.
Land Utilization / Development: Due importance should be paid to beautification and the provision
of Green spaces in any kind of city infrastructure.
The meeting was organized with the help of Nagar Parishad and was attended by the people listed in
exhibit below.
Presentation started off with a brief introduction of the study i.e. Preparation of City Development Plan
for Nasrullahganj, so as to bring all the stakeholders on the same platform. Based on the information
collected by various sources, the representative from IMaCS presented city profile which included
demographic and socio-economic profile of the town with spatial component. Demographic profile
dealt with population growth trend and its probable reasons, it also showed the population projections
and the methods used for these projections. The stakeholders agreed on this projected population.
Socio-economic profile comprised of key socio-economic parameters, major economic base and
major potentials and main issues. During this, stakeholders stated that few steps are needed to
increase employment opportunities and improve quality of life in the town to reduce the flow of people
moving out of the town. City profiling was followed by the findings of Sector Analysis which included
Water Supply, Sewerage and Sanitation, Storm Water Drainage, Solid Waste Management,
Transportation, Health, Education and other socio-cultural facilities for short, medium and long term,
i.e. 5 years, 10 years and 25 years respectively. Analysis comprised of existing status of service level
indicators, Demand-Supply Gaps for short, medium term and long term and key observations and
major issues.
Further, the stakeholders discussed the Sectoral strategies and vision in detail and share their
concerns and apprehensions on how should the city move forward towards a developmental path.
Amongst the major concerns is-„insufficient water supply‟ to the entire town, and hence there is a dire
need for augmentation of the system for which few potential sources were suggested by the
stakeholders. Further, they highlighted the need of employment opportunities – „in the region‟ , the
lack of which leads to the youths moving out to other cities. One of the important suggestions which
came up during consultations was - Since Nasrullahganj has a strong agricultural base and has a
regional crop market (Mandi), there is a scope for a few small scale agro based industries e.g. Soya
bean plants and Daal mills which can be thought upon to be established in the town. Stakeholders
also had concerns regarding the transportation and traffic aspects in the town. During the discussion,
it also came up that since a substantial percentage of population resides in slums in the town and
there should be a focused strategy to improve the quality of life of all the slum dwellers by providing
basic infrastructure to all of them. The stakeholders also had concerns on non-availability of parks,
playgrounds, community halls and not properly maintained ponds and it was suggested by them that
pond needs to be conserved with pond front development and thus creating a parks and other
recreational infrastructure near them. The Stakeholders also appreciated IMaCS‟ strategies and
sector goals in various infrastructure sectors and helped prioritizing the needs and the actions
required for the development of the town.
The Exercise was well appreciated by the stakeholders and with that note; the final workshop for the
CDP exercise for Nasrullahganj was completed.
(681
vi Revenue Surplus/ Deficit for the year 31 68 62 69 40 54 40 17 2 14 41 52 66 82 100
)
vi
Municipal Surplus/ Deficit for the year - 2 27 1 338 (16) 60 50 33 21 36 41 52 66 82 100
i
vi
Closing balance - 2 29 30 368 (16) 43 93 126 147 183 224 276 343 425 525
ii
ix Performance Indicators
18.5
DSCR - 5.47 1.98 1.10 1.50 2.22 2.40 2.78 3.20 3.68
8
PT Collection
57% 63% 68% 74% 79% 85% 86% 86% 87% 87% 88%
Performance
B REVENUE ACCOUNT 0
RECEIPTS
I Own Sources
Tax Revenue
1 Property Tax 0 3 2 3 2 3 7 9 10 11 11 15 16 17 17 18
2 Integrated tax 0 3 2 3 3 2 2 3 3 3 3 4 4 4 5 5
3 Other Taxes 0 2 3 5 6 4 4 4 5 6 6 7 8 9 10 11
Non Tax
Rental Income from
1 0 3 3 3 4 4 4 4 4 5 5 6 6 7 7 8
Municipal Properties
2 Water Charges 5 0 5 6 6 6 17 22 25 28 32 47 50 52 55 57
3 Sewerage Charges 0 0 3 6 11 17 19 20 21 21
Total Revenue Receipts 5 94 144 155 244 144 175 199 226 254 288 341 377 415 457 503
EXPENDITURE
I Salaries/ Wages & Allowances 0 30 46 57 81 62 61 68 74 82 90 99 109 120 132 145
II Administrative Expenses 0 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2
II
Operation & Maintenance
I
1 Existing O&M 0 25 25 29 39 26 29 32 35 38 42 46 51 56 62 68
2 New O&M 0 11 32 62 85 89 93 98 103 108 114
I
Programme Expenses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
V
V Repayment of Loans
1 Existing Loans 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Total Revenue Expenses 0 63 75 92 175 104 121 159 209 252 274 300 325 349 374 402
C CAPITAL ACCOUNT
RECEIPTS
I Sale of asset 0 10 3 3 4 0 0 0 0 0 0 0 0 0 0 0
II Loans 0 1 2 1 1 0 38 73 101 69 0 0 0 0 0 0
II
Public Contribution 0 0 0 0 0 0
I
I Income from Connection Fee
0 4 10 12 15 9 4 4 4 4
V (Water & Sewerage)
V Grants & Contributions
1 Special Projects 0 0 0 90 302 0 0 0 0 0 0 0 0 0 0 0
2 Basic services 0 72 86 0 9 36 0 0 0 0 0 0 0 0 0 0
3 UIDSSMT 0 0 0 0 21 0
4 IHSDP 0 0 0 0 2 0
5 Flood relief & NRCP 0 0 6 0 0 1 0 0 0 0 0 0 0 0 0 0
6 T.F.C 0 0 11 11 0 5 5 6 6 6 7 8 8 9 9 10
7 Other Grants 0 11 0 80 42 29 0 0 0 0 0 0 0 0 0 0
8 New Grants 175 340 471 324 0 0 0 0 0 0
Sub Total Grants 0 83 102 181 375 71 180 345 477 330 7 8 8 9 9 10
V
Other Capital income 0 0 0 10 0 2
I
Total Capital Receipts 0 93 106 194 380 73 219 423 589 411 22 17 12 13 14 15
EXPENDITURE
I
CAPEX 0 126 156 262 106 130 213 413 572 393 0 17 12 13 14 15
V
Map 9A - Solid waste (garbage dumping areas, existing location of landfill site)
The state has 5 crop zones, 11 agro climatic regions and 4 soil types, which add to its biodiversity and
acts favorable for the production of various crop types. The state has 4 different soil types available
in four distinct parts. The western and central regions are covered by medium and deep soils
constituting 53% of the soil area. The eastern part of the state is primarily covered by black soils
which comprises of 25-26% of the total geographical area. The remaining portion is covered by black
soil in northern part of the state, shallow and medium black soil in the southern part of the state. Area
under cultivation in Madhya Pradesh is detailed in the table below:
Besides this, following special incentives are given by Madhya Pradesh State Agricultural
Marketing Board
Foods and vegetables used for processing by a unit in Madhya Pradesh is exempted from
Mandi fee.
Wheat purchased within the state by modern flour mills at Nimrani food park is exempted from
Mandi fee.
Concessional rates of Mandi fee for Banana and Orange produce in the state.
Raw materials procured from outside the state by agri/ food processing units in the state is
exempted from Mandi fee.
Recommendations/ Suggestions
Expansion of Area under crop production & Fruit Production: The government at district levels
should take steps in augmenting land and resources used for crop and fruit production.
Rejuvenation/ Replacement of Senile gardens: There are large plantations under Mango and
Orange which are developed with seedlings and their yields are very poor. Hence it is
proposed to replant existing gardens in phased manner with high quality grafts / buildings or
by top working and canopy management of plantations with heavy manuring for productive
yields.
Encouraging more and more computerized activities such as e-choupal for facilitating the
farmers and discouraging arhatiyas.
The government should iincrease affordability of food products by reducing costs through
rationalization of tax regime and increasing supply chain efficiency
Enhance financing to the agriculture and food processing sector in a comprehensive manner
given the intrinsic linkages of the two sectors
Improve food standards and safety systems through science-based setting of standards and
strengthening of food testing network
Increase competitiveness of the small and medium enterprises by facilitating their access to
best practices, technology, capital and marketing opportunities
Effective market development and awareness campaign to enhance the image of Indian food
products, particularly overseas
Replicate successful Indian and international business models including cooperative models,
in production, processing and marketing of food products.