Heera Redevelopment Phase-Iii Project (Hrp-Iii) : Innovative Synergy Solution

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Aker Powergas Pvt Ltd

Operating System

Vendor Document Review Stamp


G-EDC-001.023-A-00

HEERA REDEVELOPMENT PHASE-III PROJECT (HRP-III)


Aker Powergas Pvt. Ltd.
Vendor Document Review
APG Document No / Rev.: Received Date:

Action

Purchase Order No.:


Manufacture
OGSP/78000-14129/TG Code Status Required on
the document
of item/s

No change
1 without prior
Accepted May Proceed
permission from
the Engineer

Purchase Order Title: GAS DEHYDRATION UNIT 2 Accepted


Incorporate all
comments and
May proceed
provided all
with Comments re-submit for comments are
acceptance incorporated
Incorporate all

Vendor Name: INNOVATIVE SYNERGY SOLUTION 3


Not accepted
comments and
resubmit for
further review
Must not
proceed

Only submit
4 For updates. No
-
Information formal review

Vendor (Prepared By): CHIN KAR LONG Engineering interface


by the Engineer

Incorporate all May proceed


5 information as
comments and provided all
clouded are reviewed
re-submit for comments are
& commented /
acceptance incorporated

Vendor (Checked By): GLENN KOH


accepted
Acceptance and/or comments on Vendor Documents by Aker Powergas
Pvt. Ltd.(the Engineer) does not relieve the Vendor of responsibilities for
correctness of the document, compliance to applicable regulations,
codes & standards, performance & mechanical guarantees of the
Equipment and obligations under the terms of the Purchase Order.

Vendor (Approved By): ALAN KO Engineer’s Name & Signature:


CHINTAN PUROHIT
Date:
15-03-21

PIPING AND INSTRUMENTATION DIAGRAM (P&ID) - GLYCOL


Document Title: REGENERATION UNIT

Equipment / Tag No.: N/A

Document No.: P053-TEG-P-DW-0001


Rev Issue date Made by Checked by Approv

Document Status: ISSUE FOR APPROVAL 00 13-02-2014 Rev. No.: Prashant Ghag J Vijay Khalokar Sandee

Purchaser reviewer and comments shall not be assumed to indicate either responsibility or liability for accuracy and
P
completeness of this document or to alter any contractual terms and conditions.
© 2013 Aker Solutions. No part of this document or the information it contains may be reproduced or transmitted in a
or by any means without the permission of Aker Solutions. This document is no longer controlled once downloade

RETURN CODE

Code 1 Accepted

Code 2 Accepted with comments. Works may proceed if comments are incorporated.

Code 3 Not accepted

Code 4 For information

Code 5 Engineering interface information as clouded are reviewed & commented / accepted

Date: Sign :
HRD HRD
TI TI
3525 3526
FROM GLYCOL CONTACTOR
P053-TEG-P-DW-0002 HRD
TIA
SHT 1OF2 HRD 3525
PSV
3566
TO LP FLARE HEADER HRD
TT
P053-TEG-P-DW-0001
3525
SHT 2OF6 TO LP FLARE HEADER
HRD P053-TEG-DW-0001
PSV
3565 SHT 2OF6
HRD TP
TCV
3525 0527
TO VENT HEADER

J
TO COLD LEAN / RICH FROM SAMPLE
GLYCOL EXCHANGER POINT S3-3510
P053-TEG-P-DW-0001
SHT 4OF6 SHT 1OF2
HRD HRD
FROM RICH GLYCOL FILTER TT TIA FROM GAS
HRD-PSV-3540/3545 DEHYDRATION SYSTEM
3560 3560
P053-TEG-P-DW-0001
SHT 3OF6 SHT 1OF2
FROM HRD-PSV-3550 FROM FLASH DRUM

P053-TEG-P-DW-0001
SHT 3OF6 SHT 2OF6
I
FROM HOT GLYCOL
EXCHANGER
P053-TEG-P-DW-0001 TP
SHT 4OF6 HRD HRD
HRD HRD HRD 0508
TI TCV XSDV
TO / FROM GLYCOL PZAHH PIA
3566 3565 3565
SURGE DRUM 3567 3565
HOT OIL RETURN
P053-TEG-P-DW-0001
SHT 4OF6 HRD HRD HRD
PZT PT PI
3567 3565 3565 HRD HRD I
PZT PZA
3568 3568

HRD HRD
PT PIA
3566 3566
HRD
HRD HRD I HRD HRD TI
LZT LZALL MW TT TICA 3565
3565 3565 24" 3565 3565

I HRD HRD
TZAHH TZT
3566 3566

HRD
HRD HRD LG
LT LIA 3565 TP
3566 3566 HRD HRD
TI XSDV 0507
3567 3566
HOT OIL SUPPLY

EL (+) 10500mm

TO GLYCOL FLASH DRUM


HRD
FI P053-TEG-P-DW-0001
EL (+) 9000mm
3565 SHT 2OF6
TO GLYCOL SURGE DRUM
P053-TEG-P-DW-0001
HRD HRD HRD
TO HOT RICH / LEAN RO FE/FT PI SHT 4OF6
EXCHANGER 3565 3565 3566
NOTE 10
P053-TEG-P-DW-0001 FROM LP FUEL GAS
SHT 4OF6 CI8038-PR-HRD-PID-2005C

TP
SP
0510 TO GLYCOL SURGE DRUM
1:100
P053-TEG-P-DW-0001
SHT 4OF6

TO CLOSED
DRAIN HEADER
LEVEL DIAGRAM (mm)
GLYCOL COMPARTMENT
CONDENSATE
FRONT BUCKET 900 H SET @
HRD HRD 8 kg/cm²g
EQUIPMENT NUMBER V-3535 WEIR 820 HRD
PT PIA IS IA
3535 PCV
3535
EQUIPMENT DESCRIPTION GLYCOL FLASH DRUM
LZAHH 700 J L SET @ 3535
VG-47F 3 kg/cm²g VB-45F
LAH 600 1" 1"x2" 2" IS IA
DESIGN COND. P/T - kg/cm²g / °C 10 / FV 120 / 0 HRD-2"-FL-A1N-IA-2636
NLL 450
OP.COND. P/T - kg/cm²g / °C 5.75 80 1" FO VB-65F 2" 2" 1:100 TO VENT HEADER
LAL 300 ¾" NOTE 11 NOTE 11 HRD-2"-VG-A1N-IS-2907 HRD-2"-VG-A1N-IA-2908 P053-TEG-P-DW-0001
1200 (ID) x 3400 (T/T) J ¾"
SIZE(mm)
LZALL 200 VB-45F VB-65F VGL-65F SHT 1OF6
POWER/DUTY, kW - VB-45F
VESSEL BOTTOM 1"x2" FROM OUTLET SCRUBBER
HRD-1"-VG-A1N-IS-2903 1" MANUAL DEPRESSURISATION LINE
MATERIAL SA516 Gr.70N (NACE) + 3mm CA SIZE 1.5G3 J HRD-2"-FL-A1N-IA-2612
HRD P053-TEG-P-DW-0002
DESIGN CODE LEVEL DIAGRAM (mm) FIRE CASE PSV VG-47F VGL-45F
ASME VIII Div 1 SET @ 10 kg/cm²g 3535 SHT. 1 OF 2
CONDENSATE COMPARTMENT IS IA
VESSEL TRIM A1N LO TP HRD-6"-FL-A1N-IA-2592
LAH 600 3/4" FB
3" 1:500 TO LP FLARE HEADER
HRD-3"-FL-A1N-IA-2618 HRD-6"-FL-A1N-IA-2620 0509
CI8038-PR-HRD-PID-2005C
BY ISS
VB-65F HRD SIZE 1.5G3

HRD-1"-VG-A1N-IS-2901
PSV FIRE CASE FROM GDU BYPASS LINE
BUCKET BOTTOM 200 3"x1½" 3536 SET @ 10 kg/cm²g MANUAL DEPRESSURISATION LINE
VB-45F HRD-2"-FL-A1N-IA-2630
P053-TEG-P-DW-0002
¾" LO SHT. 1 OF 2
3/4" VB-45F FB

HRD-1"-FL-A1N-IA-2621
FB 3"
LO 3" HRD-3"-FL-A1N-IA-2619 FROM MOISTURE
HRD VB-65F ANALSER
RO VB-65F HRD-2"-FL-A1N-IA-2610
3535 P053-TEG-P-DW-0002
J

HRD-3"-GL-A1N-IS-8147
FROM FUEL GAS SUPPLY VB-45F 1" VGL-45F 1:100 VG-47F 3"x1½" SHT. 1OF2
HRD-1"-FG-A1N-6254 FROM GLYCOL REFLUX
P053-TEG-P-DW-0001
CONDENSER
SHT 1 OF 6 1" VC-45 1" ¾" HRD-4"-FL-A1N-IA-2615
NOTE 11 3/4" LC P053-TEG-P-DW-0001
3" FB IA
VB-65F SHT. 1OF6
J HRD-3"-GL-A1N-IS-8148 HRD-1"-FL-A1N-2635
VB-45F 1" 1"
2"x1"
VB-45F VGL-45F
1"SS316L TUBING
HH SET @
I HRD I HRD 9 kg/cm²g CONNECTION FROM LEVEL
FROM COLD GLYCOL PZA PZA INSTRUMENT VENT (FROM GLYCOL
3539L 3539H
3539 3539
HEAT EXCH.
HRD-2"-GL-A1N-IH-8112 LL SET @ FLASH DRUM AND GLYCOL SURGE DRUM)
2 kg/cm²g
P053-TEG-P-DW-0001
2 PHASE FLOW
SHT 4 OF 6 FROM HRD-PSV-3565/3566
HRD HRD
PI PZT
HRD-4"-FL-A1N-IA-2616
P053-TEG-P-DW-0001
3538 3539
SHT. 1OF6
CONT. FROM DWG. P053-TEG-P-DW-0001_SHT 1OF6

FROM N2 SYSTEM
2" 2" 2" 2" 3"

CONT. ON DWG. P053-TEG-P-DW-0001_SHT 3OF6


K5 K6 N2 N5 P053-TEG-P-DW-0002
N1
K1A SHT. 1OF2
2"
DEFLECTOR
V-3535 SET @
HH 700 mm HRD-6"-FL-A1N-IA-2613
FROM HRD-PSV-3521 A/B
P053-TEG-P-DW-0002
HRD HRD I
2" LZT LZA SHT. 1OF2
3536 3536H
K4A 3536
NOTE 2

K1B HRD I
2" LZA
3536L
K2A 3536 SET @
HRD LL 200 mm
MW TI K7 HRD
MW
24" MW1 3535 2" MW2 24"
2" ILG NOTE 6
3535
HRD HRD HRD
H @ 600mm
K8A K3A NOTE 10
LG LT LIA
BAFFLE PLATE

3537 3537 3537


2" 2"
SET @
K2B H 600 mm TO HRD-LCV-3555
HRD HRD HRD
K4B LG LT LIA P053-TEG-P-DW-0001
2" 2" 3538 3538 3538
NOTE 6 L SET @
300 mm
SHT 4OF6

VB-65F 2" N8 VB-65F


100mm

N6 WEIR 2"
N4 NOTE 4
NOTE 8 N3 K8B K3B 2"
NOTE 8
2" 2" 2 2" 2"
40mm IH EL (+) 800
HRD-XBDV-3520
HRD-XSDV-3510

HRD-XSDV-3512

HRD-XSDV-3511

HRD-XDSV-3517

HRD-XSDV-3521

HRD-2"-GL-A1N-IH-8113
HRD-FCV-3510

HRD-LCV-3512

HRD-LCV-3511

HRD-LCV-3521

VB-65F 2" 2" HRD NOTE 9 RICH TEG TO


VB-65F LC XSDV GLYCOL SOCK FILTER
3535 F-3540/3545
NOTE 3 HRD-2"-GL-A1N-IH-8114
2" P053-TEG-P-DW-0001
HRD-1½"-IA-A3-5300 VGL-65F 2" SHT 3OF6
VB51-A

VB51-A

VB51-A

VB51-A

VB51-A

VB51-A

VB51-A

VB51-A

VB51-A

VB51-A

TO CLOSED
INSTRUMENT AIR 2" DRAIN HEADER
½"

½"

½"

½"

½"

½"

½"

½"

½"

½"

SUPPLY VB51-A HRD-2"-DH-A1N-IS-3402


C18038-PP-GDU-PID-1009
CI8038-PR-HRD-PID-2005C
HRD-1½"-AI-A3-5299 HRD-1"-AI-A3-5294 VB-65F
1½" 1½"x1"
TP ½"
0512
VB51-A
VB51-A

VB51-A

VB51-A

VB51-A

VB51-A

VB51-A

VB51-A

VB51-A

VB51-A

VB51-A

TO CLOSED
VB51-A

DRAIN HEADER
HRD-2"-DH-A1N-IS-3401
½"

½"

½"

½"

½"

½"

½"

½"

½"

½"

1"

C18038-PP-GDU-PID-1009
FOR DRAIN
HRD-PCV-3535

HRD-TCV-3565

HRD-TCV-3525
HRD-XSDV-3535

HRD-FCV-3575

HRD-XSDV-3565

HRD-XSDV-3566

HRD-XSDV-3516
HRD-LCV-3555

TO CLOSED
DRAIN HEADER
HRD-2"-DH-A1N-IS-3403
C18038-PP-GDU-PID-1009
CONNECTION FROM INSTRUMENT DRAINS
(FROM GLYCOL FLASH DRUM)

1" SS316L TUBING TO CLOSED


1" 1" DRAIN HEADER
C18038-PP-GDU-PID-1009
VGL-45F VB-45F
HRD-1"-DH-A1N-IS-3414
EQUIPMENT NUMBER V-3575 E-3530 E-3555
LEVEL DIAGRAM (mm)
EQUIPMENT DESCRIPTION GLYCOL SURGE DRUM COLD RICH /LEAN GLYCOL EXCHANGER HOT RICH /LEAN GLYCOL EXCHANGER
LZAHH 1600
DESIGN COND. P/T - kg/cm²g / °C 5 / FV 230 / 0 10 / FV 230 / 0 10 / FV 230 / 0
LAH 1500
OP.COND. P/T - kg/cm²g / °C 0.5 86.37 Tube : 5.90 Tube : 61.08 (in) / 80 (out) Tube : 4.95 Tube : 80 (in) / 176 (out)
Shell : 0.65 Shell : 103.51 (in) / 83.35 (out) Shell : 0.80 Shell : 204 (in) / 101.35 (out) NLL 550
SIZE(mm) 1700 (ID) x 3500 (T/T) 323.9 (OD) x 3400 (L) 584 (ID) x 3000 (L) LAL 350

POWER/DUTY, kW - 57.50 (NOTE 9) 330 (NOTE 9) LZALL 250


VESSEL BOTTOM
MATERIAL SA516 Gr.70N + 3mm C.A (Tube) : SS316L (NACE), (shell) : SA106Gr B (Tube) : SS316L (NACE), (shell) : SA516Gr 70N

A1 Shell : A1 Shell : A1
VESSEL TRIM
Tube : A1N Tube : A1N
DESIGN CODE ASME VIII Div 1 API 663 API 663

HRD
TI
3559
H SET @ 180°C
2" HRD
CONTD. FROM DWG P053-TEG-P-DW-0001_SHT 3OF6

HRD-2"-GL-A1-IS-8127 TIA
HRD 3555
TT VGL-60 L SET @ 170°C

CONTD. ON DWG P053-TEG-P-DW-0001_SHT 5OF6


3559 FROM HRD-LIA-3535
LEAN GLYCOL FROM GLYCOL FLASH DRUM
STRIPPING COLUMN 2"
HRD-2"-GL-A1-IS-8126 150# RSP HRD HRD HRD P053-TEG-P-DW-0001
P053-TEG-P-DW-0001 TT TI LCV
VB 600# 600# 150# SHT 2OF6
2"
¾" 2"x4"
SHT 1 OF 6 VB-61M 4"x2" VB-45MF ¾" 3555 3557 3555
61M VB-65MF VB-65MF
NOTE 11 NOTE 6 NOTE 16 2"x4" 4"x2" 2" 2"x1" 1"x2" 2" TO STILL COLUMN
N2 RSP 2 PHASE FLOW HRD-2"-GL-A1N-IH-8122
N5 2" N3 P053-TEG-P-DW-0001
2" 2 PHASE FLOW
VB-44M FC 1" SHT 1OF6
N1 RSP HRD-2"-GL-A1-IS-8128 ¾" ¾"
HRD HRD E-3555 N6
600#
N4
2" HRD-2"-GL-A1N-IH-8121 VB-45MF
NOTE 6
VB-45MF
NOTE 6
S1A TI TT 2" 2"x4'
RICH GLYCOL FROM 3576 3556 3556 VB 2" 150# 600# 150# HRD HRD
ACTIVATED CARBON FILTER 61M RSP TT TI
1"
3558 3558 HRD-1"-GL-A1N-IH-8123
P053-TEG-P-DW-0001 4"x2"
2" 2"x4" 4"x2" VGL-45F
HRD-2"-GL-A1N-IH-8119 VB-65F ¾" 2" HRD-2"-GL-A1-IS-8129
NOTE 6 H SET @ 90°C
VGL-60 HRD
TIA
VB-45F 2" 3530
L SET @ 70°C
HRD HRD VB-61
TI TT 600# 150# VB-44
3531 NC VB 150# ¾" NOTE 6
HRD
3531 2" RSP TT
2" 61 600# 3530
FROM REFLUX CONDENSER 2" TO GLYCOL FLASH DRUM
2" 2 PHASE FLOW HRD-2"-GL-A1N-IH-8112
HRD-2"-GL-A1N-IH-8108 N5 N3 RSP P053-TEG-P-DW-0001
P053-TEG-P-DW-0001 N2
2" RSP 150# 2"x4" 4"x2" VB-65F
2"x4" 4"x2" SHT 2OF6
SHT 1OF6
E-3530 N6 N4 2" 600#
NOTE 6
¾"
NOTE 12 2" N1
TO GLYCOL REBOILER
2" VB 600# VB-45F EQUALIZATION LINE HRD-2"-GL-A1N-IS-8159
61 150# P053-TEG-P-DW-0001
2" RSP HRD HRD
TT TI SHT 1OF6
3576 3576

FROM GLYCOL PUMPS


HRD-2"-GL-A1-IS-8163
RECYCLE LINE
HRD-2"-GL-A1-IS-8141 2"x4" 4"x2"
P053-TEG-P-DW-0001 ¾" FROM GLYCOL MAKE-UP
2" 2" PUMP
SHT 5OF6 HRD HRD-2"-GL-A1-IS-8161
RO P053-TEG-P-DW-0003
3575 HRD
FROM FUEL GAS SUPPLY
VB-44 VC-60 VB-61
1" 1" PI
HRD-1"-FG-A1N-6255 NOTE 6

NOTE 5
3575 FROM REBOILER VESSEL
P053-TEG-P-DW-0001 2" HRD-2"-GL-A1-IS-8166
SHT 1OF6 VC-45 VB-45F VGL-45F 1"x2" VB-61 P053-TEG-P-DW-0001

2" 2" 2" 2" 2" 2" 2" 2" 2" 2" SHT 1OF6

2" N10 N6 N1 N3 K4 K3A N8 N4 K1A N5


NOTE 15
K2A
HH
HRD HRD SET @ 1700mm HRD MWI
LZT LZAHH NOTE 14, 15 LG 24"
3575 3575 NOTE 2 3575 2" VB-61
NOTE 14, 15 1/2" SS 316L TUBING
K2B N11
2" HRD H SET @ 90°C H SET @ (NOTE 13) NC 2"
HRD HRD HRD HRD
LZALL K5 TT TIA LT LIA 1600 mm
1" PIPE 3575 LL NOTE 2 2" 3575 3575 3576 3576

SS 316L TUBING
SET @ 250mm L SET @ 2" VB-61
350mm N12 1/2" SS 316L TUBING
2" FLANGE
(NOTE 13)
HH NC 2"
HRD HRD SET @ 95 °C
K6 TZT TZAHH
FLOW
2"
N9 2" 3577 3577 V-3575
NOTE 7 & 8 SS 316L TUBING TO OPEN DRAIN
VB-61 NOTE 12 K3B K1B N7
2" 2" 2"
3" HRD-2"-DH-A1-IS-3424
40mm IS VB-61 2"
NOTE 4 NC
VB-61
DETAIL A EL+900mm
A1 TO CLOSED DRAIN HEADER
A1N HRD-2"-DH-A1N-IS-3410
C18033-PP-GDU-PID-1009
HRD-1"-GL-A1-IS-8175

SHT 3OF6
FROM PH NEUTRALIZER
INJECTION PUMP
1/2" SS 316L TUBING
P053-TEG-P-DW-0003
TUBING HRD-1"-GL-A1-IS-8176
PIPING PIPING TUBING
FROM ANTIFOAM
1" VB-44 1" 1" INJECTION PUMP
1/2" SS 316L TUBING
P053-TEG-P-DW-0003
1" VC-42 VB-44
VC-42
S1A
3575
TO GLYCOL CIRCULATION
1:200 PUMPS
NO POCKETS NOTE 1 HRD-3"-GL-A1-IS-8131
FROM HRD-AT-3520 P053-TEG-P-DW-0001
PH ANALYZER SEE DETAIL A CONNECTION FROM INSTRUMENT DRAINS
HRD-3/4"-GL-A1N-IS-8165 3/4" SHT 5OF6
P053-TEG-P-DW-0002 (FROM GLYCOL SURGE DRUM)
TO CLOSED
SHT 1OF2 1" SS316L TUBING 1" 1" DRAIN HEADER
C18038-PP-GDU-PID-1009
HRD-1"-DH-A1N-IS-3431 VGL-45F VB-45F
EQUIPMENT NUMBER P-3580A/B (2x100%)
EQUIPMENT DESCRIPTION GLYCOL CIRCULATION PUMPS
DESIGN COND. P/T - kg/cm²g / °C 112 100 / 0
Suction : 0.5
OP.COND. P/T - kg/cm²g / °C Discharge : 83-103 86.37
SIZE(mm) 3.5 m³/hr
POWER/DUTY, kW 18.5
MATERIAL SS 316L (WETTED PART)
DESIGN CODE API 674

FROM T72-TDICA-3512
SET @ 5°C (NOTE 14)
P053-TEG-P-DW-0002
SET @ 3.5m³/hr (NOTE3)
SHT 1 OF 2

HRD H@3.85 m³/hr


FCV HRD
TO GLYCOL VB-84 3575 VB-84 FICA
SURGE DRUM 1:100 2" 2"x1" 2" 3580
HRD-2"-GL-A1-IS-8141 HRD-2"-GL-E1-IS-8140 L@3.33 m³/hr
P053-TEG-P-DW-0001
SHT 4OF6 2"x1" FC
A1 E1 NOTE 1 ¾" 1" NOTE 1 ¾" HRD
150# 900# FT
3580
VG-46 1" VG-46 HRD-1"-GL-E1-IS-8142
2" GAS / GLYCOL HEAT
VC-68 EXCHANGER
VGL-44 HRD-2"-GL-E1-IS-8135 DP HRD-2"-GL-E1-IS-8137 NOTE 12
P053-TEG-P-DW-0002
A1 E1 NOTE 13 NOTE 10 SHT 1OF2
CONTD. FROM DWG P053-TEG-P-DW-0001_SHT4OF6

1.5D2 15D 6D
150# 900# BLOCKED DISCHARGE
VB-44 HRD HRD
PSV SET @ FE
3580B 112 kg/cm²g 3580
LO ¾" 300# 1500#
1:100 VB-61 NOTE 11
HRD-2"-GL-A1-IS-8158
1500#
2" FB LO 2"
NOTE 13 1.5D2 VB-84 FB
E1
BLOCKED DISCHARGE A1 300# 2"x1½"
VB-44 HRD ¾"
SET @
1:100

PSV ¾"
3580A
112 kg/cm²g HRD-2"-GL-E1-IS-8136 VG-46
LO ¾" 300# 1500# 2" VG-46
FB LO
VB-61 VB-84 LO 2" 2"
1500# ¾"
VB-84 FB VC-68 NOTE 2
2" FB HRD-2"-GL-E1-IS-8153
I VG-46
2"x1½" E1
HRD-2"-GL-A1-IS-8157 A1 300# 3584A I
¾"
3584B
NOTE 2
H SET@ HH SET@ 2" VC-68
VG-46 HRD 107 kg/cm²g HRD
PIAH 110 kg/cm²g H SET@
LO 2" PZAHH HRD HH SET @
H@0.01 kg/cm² 3583A 107 kg/cm²g HRD
110 kg/cm²g
HRD
VB-84 FB 3584A PIAH PZAHH
PDIA HRD-2"-GL-E1-IS-8152 3583B 3584B
HRD
3580A PI
3581A HRD HRD HRD
PT PI PZT
3583A 3582A 3584A HRD HRD HRD
HRD A1 E1 PT PI PZT
PDT 3583B 3582B 3584B
LO 3580A LO
FB FB RSP 3"
RSP E1
3" 1/2" 3" E1 E22 2" H@0.01 kg/cm²
VB-61 VB-85 HRD E1
NOTE 6 VG-42 PDIA
RSP 2"
NOTE 9 E22 HRD
3580B PI
E22
HRD-3"-GL-E1-IS-8133
NOTE 8 P-3580A 3581B NOTE 9
NOTE 1
HRD-3"-GL-A1-IS-8132

HRD A1 E1
¾" NOTE 7 LO
PDT
3580B LO NOTE 8 P-3580B
VG-42 NOTE 7 FB FB
START RSP 3"
A1 A1N RUNNING
PB XI NOTE 7
3" 1/2" 3" E22 NOTE 7
3580A1 3580A VB-61 VB-85 E1
START
VG-42 XI
RUNNING
AUTO/ PB
XA HSMANUAL
TRIP INDICATION M 3580B1 3580B
3580A 3580A SWITCH HRD-3"-GL-E1-IS-8134
NOTE 6 AUTO/
START XA HS MANUAL
XS HS
NOTE 1 TRIP INDICATION M
ESD TRIP 3580B 3580B SWITCH
3580A 3580A ¾"x2"
¾" START
STOP XS HS
PB HS VG-42 ESD TRIP
STOP 3580B 3580B
3580A2 3580A2
A1 A1N STOP
LOCAL/ PB HS
HS STOP
REMOTE 3580B2 3580B2
XL 3580A SWITCH
3580A LOCAL/
HS
LOCAL /REMOTE INDICATOR REMOTE
XL 3580B SWITCH
FROM GLYCOL 3580B
SURGE DRUM 1:200 LOCAL /REMOTE INDICATOR
¾"x2" TO CLOSED
P053-TEG-P-DW-0001 DRAIN HEADER
HRD-3"-GL-A1-IS-8131 NO POCKETS HRD-2"-DH-A1N-IS-3412
SHT 4OF6 HRD-2"-DH-E1-IS-3411 C18038-PP-GDU-PID-1009
2" SHT 3OF6
HRD-2"-DW-A1N-3609 VGL-72
¾" E1 A1N
HRD-3/4"-DH-A1N-IS-3425
HRD-2"-DW-A1N-3610

TO OPEN HYDROCARBON
VG-45F DRAIN OHD-HRD-GDU-006
C18038-PP-GDU-PID-1009

TO OPEN HYDROCARBON
DRAIN OHD-HRD-GDU-005
C18038-PP-GDU-PID-1009

You might also like