Detailed Estimate For Largam
L5050x6
top Bottom 2x100'-0"=
200 rft Post 14
x12'-0"=168 ft 81.40
Kgs 877.14 85679
Crosses 7x11'-0"=77 rft Total =445 rft135.636 +20%
rm @4.5 kg/m=610.36 kg
Flate 50x6
top Bottom 2x100'-0"=
200 rft Post 14
x8'-0"=112 ft
Crosses 7x11'-0"=77 rft Total =389 rft 118.57
rm @2.25 kg/m=266.77 kg
Total=877.14 Kg
10 Chain link fencing 50 mm mesh
1x100x8=800ft sft 800.00 25.00 20000
12 Applying priming coat with ready mixed red
oxide zinc chromate primer
Chain link fencing
1x100'x8'=800 sft 74.32 sqm 14.45
sqm 74.32 1503
+40%
12 Painting with ready mixed synthetic enamel
paint two or more coats
Chain link fencing
1x100'x8'=800 sft 74.32 sqm 40.15
sqm 74.32 4178
+40%
12 Carriage of materials from sourced to site
a). Stone Agg. From 20 Km (Qty
265
Cum 7.21 2579
+35% SSR
a).Sand 20 Km (Qty
265
Cum 4.15 1485
+35% SSR
MRMR
MRMR
MR
M
Total= 255852
R
Say 2.56 Lacs
Rate per Rm 8394
DETAILED ESTIMATE FOR THE CONSTRUCTION OF STORE BUI
CHOWKIDAR QUARTER IN (R&B)DIVISIONAL STORE PERMISES
Sno. Particulars
Under Ground
Long wall 2.0 8.0 0.75 0.6
Short Wall 2.0 6.0 0.75 0.6
C-Walls 1.0 4.00 0.75 0.6
P-Wall 2.0 2.00 0.75 0.6
Wall 2.0 3.00 0.75 0.6
A--Net Qty
Step Iind
Long wall 2.0 8.0 0.75 0.60
Short Wall 2.0 6.0 0.75 0.60
C-Walls 1.0 4.00 0.75 0.60
P-Wall 2.0 2.0 0.75 0.60
Wall 2.0 3.00 0.75 0.60
Aggr Length of 42.00 B--Total Qty
walls Rm
Net Qty A+B =
P/L in position specified grade of RCC excluding the cost of
centering, shuttering, finishing and reinforcement 1:1.5:3 ( 1
6.0 Cement 1.5 : Coarse Sand : 3 graded stone agg. 20mm
nominal size ) in Beams, Suspended Floor, Stair Cases etc.,
all complete
DPC
Long wall 1.0 42.0 0.60 0.20
Lintel 1.0 42.00 0.35 0.45
Rcc Band 1.0 42.0 0.35 0.30
Rcc Slab 1.0 8.75 6.75 0.20
Total Qty
Centering and shuttering including strutting, propping etc
7 including removal of formwork.
24 14
Structural steel work welded in built up sections, trusses and framed
work including cutting, welding, hoisting, fixing in position and
applying priming coat of steel primer and including Cost of MS Bolts
of required size all complete.
]
TION OF STORE BUILDING CUM
L STORE PERMISES AT SHOPIAN
2.64
1.98
0.66
0.66
0.99
6.93 Cum 700 0.049
1.44
1.08
0.36
0.36
0.54
3.78 Cum 3112.8 0.12
3.17
2.38
0.79
0.79
1.19
8.32 Cum 5474.5 0.46
7.20
5.40
1.80
1.80
2.70
18.90 Cum
7.20
5.40
1.80
1.80
2.70
18.90 Cum
37.80 Cum 4606.20 1.74
5.04
6.62
4.41
11.81
27.88 Cum 6280.95 1.75
3981 Kg 90 3.58
44.10 Cum
139.0
44.10 Cum 5258 2.32
Cum 69612.35 0.95
48.0
16.0
64.0 No,s
shutters for
I marked M.S.
ith necessary
parately,al!
lude float glass
)
58.54
29.27
32.01
120 Sft 1957.75 2.35
s using
rture 1.4 mm
lerestory
d black
95.8537
2396.34 Kg 80 1.92
ment : 2 Coarse
ing coat of neat
st of nosing of
al size of
involved
15.62
13.39
6.46
4.70
4.59
44.75 Sqm 350 0.16