Operational Checklist Rev4

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Ebee No.

: SY084444

Project : HAN-Wahana
UAV OPERATIONAL CHECK LIST

PRE-FLIGHT Location Date Time : Flight No.

PHYSICAL HARDWARE ENVIRONTMENT PLANNING


1 Body/Airframe 1 Wind 1 Working Radius
2 Wings 2 Rain 2 Working Ceiling
3 Ground Sensor 3 Temperature 3 Security action check
4 Pitot 4 Eagle 4 Battery indicator
5 Cabling 5 Landing Strip 5 Take off setting
6 Motor 6 Obstacle 6 Landing setting
7 Propeller 7 Operation's Area
8 Rubber Band 8 Flight Altitude
9 Tracker 9 Actual/ground altitude
10 Battery Ebee 10 Camera and ground resolution
11 Camera : - Function 11 Lateral and longitudinal -Overlap
- SD Card 12 Flight time
- Battery take out ? 13 Radio connectivity
12 Laptop Battery 14 UPLOAD Mission

FLIGHT
2nd minutes 15th Minutes After last captured
1 Battery 1 Battery 1 Battery
2 Wind 2 Wind 2 Wind
3 GPS satellite 3 GPS satellite 3 GPS satellite
4 Radio link quality 4 Radio link quality 4 Radio link quality
5 Autopilot Temperature 5 Autopilot Temperature 5 Autopilot Temperature
6 Flight stability 6 Flight stability 6 Flight stability
7 Camera Function 7 Camera Function 7 Camera Function

POST FLIGHT Operator : 1


2
PHYSICAL HARDWARE Data Record
1 Battery disconnected 1 Number of pict
2 Body/Airframe 2 flight Time actual
3 Wings 3 Battery remaining
4 Propeller and Rubber band
5 Camera
6 Turn off tracker

[ Operat or ]
NOTE :

2012-11 1 of 1 TCI-PLT-FO-254

You might also like