I MATERIAL UTAMA
1 Tiang Beton 13 m Batang 85.00 10,470,000.00 889,950,000.00
2 Tiang Beton 11 m Batang 3.00 8,350,000.00 25,050,000.00
3 Tiang Beton 9 m Batang 57.00 6,972,467.00 397,430,619.00
4 Kawat AAACS 70 mm Meter 13,032.00 23,700.00 308,858,400.00
5 Kabel NYY 120 mm Meter 88.00 195,900.00 17,239,200.00
6 Kabel NYY 90 mm Meter 132.00 118,980.00 15,705,360.00
7 Kabel Twisteed AL 3x70 + 1x50 mm Meter 7,763.00 46,904.00 364,115,752.00
JUMLAH A 2,018,349,331.00
198,639,657.00
182,414,230.00
SUB JUMLAH A 2,399,403,218.00
JUMLAH A 222,106,380.00
MATERIAL NON UTAMA
II 1 Fuse Link 6 A - 20 KV
2 Bordesk Trafo Tiang Tunggal 3 Bordesk Trafo Tiang Ganda
4 Trafers UNP 6,5x240 cm untuk Cut Out 5 LV Bord 2 Jurusan 400 Amper Buah 9.00 44,580.00 401,220.00
6 LV Bord 4 Jurusan 630 Amper Set 1.00 2,975,000.00 2,975,000.00
7 Trafers UNP 6,5x240 cm untuk LV Bord 8 Kabel NYY 120 mm Set 2.00 4,380,000.00 8,760,000.00
9 Kabel NYY 95 mm
10 Pipa Galvanize 3 inchi lengkap inporing 11 Pipa Galvanize 2,5 inchi Buah 8.00 281,700.00 2,253,600.00
lengkap inporing 12 Arm Tie PPI lengkap Klam / Bolt Set 1.00 7,260,000.00 7,260,000.00
13 Material Grounding / Arde 2,75 mtr 14 Material Grounding / Arde 5,50 Set 2.00 12,632,400.00 25,264,800.00
mtr 15 Perlengkapan LV Bord
16 Pondasi Trafo Tiang Tunggal 17 Pondasi Trafo Tiang Ganda Buah 6.00 281,700.00 1,690,200.00
18 Comp Conector AL 70 mm / (CCO 5T5) 19 Sambungan AL / CU 5T5 Meter 132.00 195,900.00 25,858,800.00
70/95 mm Meter 220.00 118,980.00 26,175,600.00
20 Plat Tanda Bahaya
Batang 3.00 789,900.00 2,369,700.00
21 Sepatu Kabel 120 mm
22 Sepatu Kabel 95 mm 23 Papan Ulin 3/4 inchi 24 Stainless Steel Strip Batang 5.00 604,930.00 3,024,650.00
25 Kabel Twisteed AL 2x10 mm 26 CCO 1T1 Set 6.00 81,120.00 486,720.00
27 Service Wadge Clamp Set 3.00 905,880.00 2,717,640.00
28 Pole Breacket 7 inchi untuk Tiang Beton 29 Transport Material
Set 3.00 1,305,000.00 3,915,000.00
Set 2.00 635,000.00
Buah 1.00 514,800.00 514,800.00
Buah 2.00 574,560.00 1,149,120.00
Buah 12.00 70,319.00 843,828.00
Buah 28.00 52,710.00 1,475,880.00
Buah 3.00 78,000.00 234,000.00
Buah 12.00 54,340.00 652,080.00
Buah 32.00 51,700.00 1,654,400.00
Lembar 30.00 66,000.00 1,980,000.00
Meter 30.00 13,700.00 411,000.00
Meter 2,300.00 3,654.00 8,404,200.00
Buah 216.00 12,100.00 2,613,600.00
Buah 108.00 3,850.00 415,800.00
Set 42.00 16,830.00 706,860.00
Ls 1.00 20,000,000.00 20,000,000.00
154,208,498.00
UPAH KERJA
III 1 Pasang Sepatu Kabel / Pembongkaran
2 Pasang Bordesk Trafo Tiang Tunggal / Bongkar 3 Pasang Bordesk Trafo
Tiang Ganda / Bongkar 4 Pasang Cut Out / Pembongkaran Buah 308.00 17,500.00 5,390,000.00
5 Pasang Lighting Arrester / Pembongkaran 6 Pasang Arde Buah 1.00 274,755.00 274,755.00
7 Pasang Perlengkapan LV Bord / Bongkar 8 Pengepresan Buah 2.00 461,585.00 923,170.00
9 Pemasangan Kabel Ponding 10 Bongkar Pasang Pondasi Trafo 11
Bongkar Pasang Trafo Buah 9.00 227,700.00 2,049,300.00
12 Upah Pemasangan Kabel Tanah 13 Transport Material Buah 9.00 227,700.00 2,049,300.00
14 Biaya Serah Terima Operasi (Commisining Test) Buah 6.00 50,310.00 301,860.00
Buah 3.00 498,185.00 1,494,555.00
Buah 115.00 30,000.00 3,450,000.00
Buah 10.00 414,170.00 4,141,700.00
Buah 3.00 50,310.00 150,930.00
Buah 3.00 976,040.00 2,928,120.00
Meter 216.00 48,000.00 10,368,000.00
Ls 1.00 17,500,000.00 17,500,000.00
Ls 1.00 20,000,000.00 20,000,000.00
71,021,690.00
S 447,336,568.00
U
B
JUMLAH A + B JU 2,846,739,786.00
PPN 10% M 284,673,978.60
TOTAL JUMLAH L 3,131,413,764.60
A
3,131,413,000.00
H
B
OE
Harga
Satuan (Rp)
8,950,000.00
7,600,000.00
623,400.00
593,100.00
JUMLAH A
JUMLAH A
OE
HARGA PERKIRAAN SENDIRI (HPS)
PEKERJAAN PEMINDAHAN TIANG LISTRIK KM 2 - KM 7 PENAJAM
LOKASI KECAMATAN PENAJAM
NO URAIAN PEKERJAAN Harga Jumlah
Satuan Volume
Satuan (Rp) Harga (Rp)
A. PEMASANGAN DAN PENGADAAN TIANG LISTRIK
I MATERIAL UTAMA
1 Tiang Beton 13 m Batang 85.00
2 Tiang Beton 9 m Batang 57.00
3 Kawat AAACS 70 mm Meter 13,032.00
4 Kabel Twisteed AL 3x70 + 1x50 mm Meter 7,763.00
JUMLAH A -
-
SUB JUMLAH A -
JUMLAH A -
-
S -
U
B
Harga J
Satuan (Rp) U
M
L
10,470,000.00 A
H
B
6,972,467.00
23,700.00
46,904.00
JUMLAH A
682,800.00
204,000.00
273,000.00
510,000.00
81,120.00
582,000.00
490,485.00
70,320.00
80,419.00
50,578.00
12,898.00
3,654.00
12,100.00
3,850.00
16,830.00
25,000,000.00
616,860.00
495,000.00
47,790.00
31,625.00
35,625.00
21,000.00
152,310.00
158,860.00
211,309.00
173,505.00
114,359.00
30,000.00
85,608.00
25,000,000.00
3,067,920.00
3,573,900.00
686,400.00
8,350,000.00
JUMLAH A
44,580.00
2,975,000.00
4,380,000.00
281,700.00
7,260,000.00
12,632,400.00
281,700.00
195,900.00
118,980.00
789,900.00
604,930.00
81,120.00
905,880.00
1,305,000.00
514,800.00
574,560.00
70,319.00
52,710.00
78,000.00
54,340.00
51,700.00
66,000.00
13,700.00
17,500.00
274,755.00
461,585.00
227,700.00
227,700.00
50,310.00
498,185.00
30,000.00
414,170.00
50,310.00
976,040.00
48,000.00
20,000,000.00
REKAPITULASI
HARGA PERKIRAAN SENDIRI (HPS)
PEKERJAAN PEMINDAHAN TIANG LISTRIK KM 2 - KM 7 PENAJAM
LOKASI KECAMATAN PENAJAM
1 Material Utama
2 Material Non Utama
3 Upah Kerja
TOTAL -
PPN 10% -
JUMLAH TOTAL -
TOTAL DIBULATKAN -
Terbilang :