HADDAD

Mechanical Consultants

Pipes Water Content


DATE: 11-Feb-02
PROJECT: PREPARED BY: Ziad Andraos
Pipe Pipe Length (M) Pipe Water Content (Gal)
Size System System System System System System System System System System System System System System System System
[In] 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
1/2 550 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.45
3/4 430 0.0 0.0 0.0 0.0 0.0 0.0 0.0 39.0
1 670 0.0 0.0 0.0 0.0 0.0 0.0 0.0 98.6
1 1/4 480 0.0 0.0 0.0 0.0 0.0 0.0 0.0 122.2
1 1/2 610 0.0 0.0 0.0 0.0 0.0 0.0 0.0 211.4
2 410 0.0 0.0 0.0 0.0 0.0 0.0 0.0 234.2
2 1/2 580 0.0 0.0 0.0 0.0 0.0 0.0 0.0 472.7
3 570 0.0 0.0 0.0 0.0 0.0 0.0 0.0 717.2
4 550 0.0 0.0 0.0 0 0 0 0 1192
5 25 0.0 0.0 0.0 0 0 0 0 85
6 0.0 0.0 0.0 0 0 0 0 0
8 0.0 0.0 0.0 0 0 0 0 0
10 0.0 0.0 0.0 0 0 0 0 0
12 0.0 0.0 0.0 0 0 0 0 0
14 0.0 0.0 0.0 0 0 0 0 0
16 0.0 0.0 0.0 0 0 0 0 0
18 0.0 0.0 0.0 0 0 0 0 0
TOTAL 0 0 0 0 0 0 0 3201
HADDAD
Mechanical Consultants

Equipment Water Content


DATE: 11-Feb-02
PROJECT: PREPARED BY:
System Load (Bth/Hr) Equpment Water Content (Gal)
Equipment Type System System System System System System System System System System System System System System System System
1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8
FCUs & AHUs HCH Coils 4100000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 123.0
FCUs & AHUs Htg Coils 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Radiators 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Chillers 4320000 0.0 0.0 0.0 0.0 0.0 0.0 0.0 138.2
Boilers 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

TOTAL 0 0 0 0 0 0 0 261
HADDAD
Mechanical Consultants

Closed Expansion Tanks Capacity


DATE: 11-Feb-02
PROJECT: PREPARED BY:
System System System System System System System System
System Parameters Formulas 1 2 3 4 5 6 7 8

Input Data
Th System Highest Temp (Deg F): 80.0
Tl System Lowest Temp (Deg F): 44.0
P1 Static Pressure at Expansion Tank (Ft): 13.2
P2 Critical Equipment Max Operating Pressure (Psig): 146.0
DH Difference in Altitude between Expansion Tank and Critical Equipment (Ft): 0.0
DP Additive Pump Operating Pressure Effect at Critical Equipment (Ft): 62.4

Computed Data
P3 Relief Valve Setting (Psig): P3 = P2 - 7 = 139.0
P4 Adopted Max Op.Pressure at Critical Equip. (Psig): P4 = P3 x 0.9 = 125.1
Pf Min Operating Pressure at Expansion Tank (Psia): Pf = Ceiling of (P1/2.31) + 14.5 = 21.8
Pa Air Precharge To Expansion Tank (Bars): Pa = Pf / 14.5 = 1.5
Po Max Operating Pressure at Expansion Tank (Psia): Po = P5 - (DH+DP)/2.31 +14.5 = 112.6
E Percent Increase in Water Volume E (%): E= Function of (Th & Tl) = 0.242
Vs System Water Content (Gal): Vs = S Volumes = 3462

Vt Expansion Tank Volume (Gal): Vt = (E x Vs) / (1- Pf/Po) = 10.4


HADDAD
Mechanical Consultants

Open Expansion Tanks Capacity


DATE: 11-Feb-02
PROJECT: PREPARED BY:
System System System System System System System System
System Parameters Formulas 1 2 3 4 5 6 7 8

Input Data
Th System Highest Temp (Deg F): 80.0
Tl System Lowest Temp (Deg F): 44.0

Computed Data
E Percent Increase in Water Volume E (%): E= Function of (Th & Tl) = 0.242
Vs System Water Content (Gal): Vs = S Volumes = 3461.8

Vt Expansion Tank Volume (Gal): Vt = E x Vs = 8.4