How To Calculate Cross Section Area & Sl


Stack(Toe Point) In Excel
How to Calculation Slope Stack (Toe Point) In Excel Making Formula With Table.

How to Calculate Road Pavement Structures Asphalt (Aggregate Base- WBM) & Sub Base
Cross Section Station 0+000 (Fill Area)
0+000
217.000

4
3 216.150 5
12 216.050 216.050 67
215.950
1 215.898 215.950
7
215.898
215.773 215.773 216.000
1 7
215.460 215.460
1
215.156
4 7
3 215.380 5 215.156
2 215.280 215.280 6 215.000
215.180 215.180
Elevations

214.000
Toe Point LS Toe Point RS
[X VALUE] 6
[X VALUE]
1 [Y VALUE] 213.194 [Y VALUE]
213.500
7 8 9 213.000
2 5 213.245
213.127 213.194 213.194
3 213.111
212.900 4
212.740

212.000

211.000
-22 -21 -20 -19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Distance
NSL FRL ABC WBM Sub Base Sub Grade

Project Consulant Area Of Asphalt Wearing Course 1.005 Area of SubBase 6.771
Area Of Asphalt Base Course
Surveying Engineering Design Subscribe Channel 2.454 Area of Embecment (Fill) 60.874
Information Area of Agregate Base Course(WBM) 6.400 Area of Embecment (Cut) -