Professional Documents
Culture Documents
Bid Evaluation Matrix
Bid Evaluation Matrix
Bid Evaluation Matrix
262
Sub Total 0
6 STRUCTURE #6,7 Inlet #1 RD:01+908 0
Earth work in excavation in foundation all
7.1 types of soil as per drawing and instruction Cum 58.38
of site engineers 2.5
Back filling up to any depth below ground
level around foundations, proper grade and
level in layers not exceeding 200 mm
thickness using/with selected site materials,
compacted as specified including re
7.2 Cum 32.84
excavation of stacked earth, watering,
ramming/compaction by manual/mechanical
means, etc. all complete for the following
Each layer compacted so as to achieve at
least 95% maximum dry density.
200
Sub Total 0
9 STRUCTURE #8,Spilway#1 RD:02+272 0
Earth work in excavation in foundation all
9.1 types of soil as per drawing and instruction Cum 156.99
of site engineers 2.5
3
Providing & laying Coursed Rubble
9.3 Masonry with hard stone hammer-dressed Cum 134.91
in foundation with cement mortar 1:4
50
Cement sand pointing (1:3) on
9.4 Cum 105.92
stonemasonry works with water curing 2.5
200
Sub Total 0
200
Sub Total 0
STRUCTURE #10,OFFTAKE #6
11
RD:02+533 0
Earth work in excavation in foundation all
11.1 types of soil as per drawing and instruction Cum 35.91
of site engineers 2.5
200
Sub Total 0
STRUCTURE #11,OFFTAKE #7
12
RD:02+680 0
Earth work in excavation in foundation all
12.1 types of soil as per drawing and instruction Cum 48.41
of site engineers 2.5
20
Providing and soling boulders (Stone
12.7 pitching) including filling the voids with sand Cum 2.8
and watering all complete. 200
Sub Total 0
STRUCTURE #12,OFFTAKE #8
13
RD:02+840 0
Earth work in excavation in foundation all
13.1 types of soil as per drawing and instruction Cum 96.12
of site engineers 2.5
Back filling up to any depth below ground
level around foundations, proper grade and
level in layers not exceeding 200 mm
thickness using/with selected site materials,
compacted as specified including re
13.2 Cum 55.45
excavation of stacked earth, watering,
ramming/compaction by manual/mechanical
means, etc. all complete for the following
Each layer compacted so as to achieve at
least 95% maximum dry density.
200
Sub Total 0
STRUCTURE #16,One way Offtake #1
17
RD:03+160 0
Earth work in excavation in foundation all
17.1 types of soil as per drawing and instruction Cum 57.62
of site engineers 2.5
Back filling up to any depth below ground
level around foundations, proper grade and
level in layers not exceeding 200 mm
thickness using/with selected site materials,
compacted as specified including re
17.2 Cum 37.62
excavation of stacked earth, watering,
ramming/compaction by manual/mechanical
means, etc. all complete for the following
Each layer compacted so as to achieve at
least 95% maximum dry density.
200
Sub Total 0
200
Sub Total 0
STRUCTURE #20,OFFTAKE #12
21
RD:03+507 0
Earth work in excavation in foundation all
21.1 types of soil as per drawing and instruction Cum 33.04
of site engineers 2.5
Back filling up to any depth below ground
level around foundations, proper grade and
level in layers not exceeding 200 mm
thickness using/with selected site materials,
compacted as specified including re
21.2 Cum 13.89
excavation of stacked earth, watering,
ramming/compaction by manual/mechanical
means, etc. all complete for the following
Each layer compacted so as to achieve at
least 95% maximum dry density.
200
Sub Total 0
STRUCTURE #34,OFFTAKE #24&25
35
RD:04+411 0
Earth work in excavation in foundation all
35.1 types of soil as per drawing and instruction Cum 70.06
of site engineers 2.5
3
Providing & laying Coursed Rubble
35.3 Masonry with hard stone hammer-dressed Cum 62.81
in foundation with cement mortar 1:4
50
Cement sand pointing (1:3) on
35.4 Sqm 56.84
stonemasonry works with water curing 2.5
200
Providing and soling boulders (Stone
41,7 pitching) including filling the voids with sand Cum 8
and watering all complete. 20
Sub Total 0
STRUCTURE #41,OFFTAKE #31
42
RD:04+806 0
Earth work in excavation in foundation all
42,1 types of soil as per drawing and instruction Cum 40.72
of site engineers 2.5
200
Providing and soling boulders (Stone
67.7 pitching) including filling the voids with sand Cum 3.13
and watering all complete. 20
Sub Total 0
STRUCTURE #65,OFFTAKE #51
68
RD:06+612 0
Earth work in excavation in foundation all
68.1 types of soil as per drawing and instruction Cum 23.82
of site engineers 2.5
200
Sub Total 0
Providing & fixing of permanent
information sign board after the
76 completion of the project as per the PCs 2
instruction of the Project Engineer.
500
Overall Gates 0
Total Offtakes type D Size (50*80) supply
including fabrication, painting two coat (red No 63
oxide and oil paint) and installation as per
drawing 160
Total cross regulator type A size (70*80)
supply including fabrication, painting two No 6
coat (red oxide and oil paint) and
installation as per drawing 200
Total cross regulator type B size (60*80)
supply including fabrication, painting two No 10
coat (red oxide and oil paint) and
installation as per drawing 220
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
101.51 3.58 145.36 5 385 5.00
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
88.3 3.58 126.45 5 385 5.00
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
57.05 3.58 81.70 5 385 5.00
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
0 - - 0 0 -
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
382.50 4.00 162.42 5.00 203.02 4 162.416
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
382.50 4.00 141.28 5.00 176.60 4 141.28
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
382.50 4.00 91.28 5.00 114.10 4 91.28
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
- - - - - 0 0
Arman
Sharq
1 constructi ### ### 14.83% Yes Yes Yes Yes Yes
on
company
Nader
Shahab
2 ### ### -9.88% Yes Yes Yes Yes Yes
Constructi
on
Company
Bright
Pearl
3 Constructi ### ### 7.69% Yes Yes Yes Yes Yes
on
Company
KRA
Constructi
4 on ### ### 0.00% Yes Yes Yes Yes Yes
Constructi
on
Company
Da
Maidan
Zawahno
5 ### ### -3.92% Yes Yes Yes Yes Yes
no
Constructi
on Co
Muttahid
Safi
6 Constructi ### ### 10.05% Yes Yes Yes Yes Yes
on
Company
Jaihoon
Badakhsh
an
Constructi
on and
7 Prodution ### ### 2.50% Yes Yes Yes Yes Yes
of
Constructi
on
Material
Company
Validity of
the
Annex 5.1 Informatio Eligibility
Form of
(ESHS n of the
Bid
Requirem Provided Contracto
Security
ents in Pre- r for
(Bid
Complete qualificati Evaluatio
Bond)
d) on n
document
s
Yes No Yes NO
Yes Yes Yes YES