5.3 Model Based Estimating For Target Value Design-Saurabh Tiwari
5.3 Model Based Estimating For Target Value Design-Saurabh Tiwari
Saurabh Tiwari
DPR Construction, Inc.
COST TRACKING FOR TARGET VALUE DESIGN
70%
% of Total C
60%
50% Conceptual Estimate
40% Manual/Model Based Estimate
30%
20%
10%
0%
Project Time Line
Manual Mapping
Data with cost
Assumed assemblies
Data Used
M MANUAL
A Greater Chances of Error:
N •Missing Clouds
Missing detail sheets
•Missing detail sheets
U
•Missing Section cuts
A •RETAKEOFF WHOLE SET OF DRAWINGS
L
M
O
D
E
L
MAPPING Cost
Assemblies with 3D
Model Components
Mapping
remembered (done
only once)
Auto‐takeoff
(automated cost
feedback on updated
model )
Link with cost approved
1 week 1 week
CADDuct/
CADMech CADEST COST ESTIMATE
/CADPipe
TOCOMAN
Tekla /Innovaya COST ESTIMATE
(in progress)
CEILING HT FULL HT
Quick Cost Comparison between CONSTRUCTION alternatives