Aq , ~I - J

VOLUME XXI NUMBER 11FIRST QUARTER 1981

MODERN STEEL
CONSTRUCTION
Space Frame for the Stars
An Architect's Choice for Retail Stores
Million-Dollar Change Order-with Steel
Fast Track-and a Million in the Bank
Things are Looking Up at Sharpstown
MODERN
CONSTRUCTION
Published by

American Institute
VOLUME XXI NUMBER 11FIRST QUARTER 1981 •
of Steel Construction CONTENTS
The Wrigley Building Poplar Creek: Space Frame for the Stars 3
400 North Michigan Avenue Steel: An Architect 's Choice for Retail Facilities 6
Chicago, illinois 60611
Simmonds Precision: A Million·Dollar Change 10
O~~ICERS
Bedford Park Station: A Home Away from Home 12
A Fast Track-and a Million in the Bank 13
WIlliam J. Tilley, Jr., Chairman
Sharpstown Center: Things are Looking Up! 16
Philip O. Elbert, First Vice Chairman
John H. Busch , Second Vice Chairman
Bridge to Renewal-Color it Red! 20
Werner H. QU8sebarth , Treasurer 1981 ARCHITECTURAL AWARDS OF EXCELLENCE
Richard G. Altmann , Pre.ldent COMPETITION ANNOUNCED
William W. Lanigan , he American Institute of Steel Construction is once again spon·
Secretary & General Counsel
William A. Mllek,
T soring its " Architectural Awards of Excellence Program." The
20th award program will seek to recognize and honor outstanding
Vice President, Engineering architectural designs in structural steel and to encourage further
Lewis Brunner, exploration of the many aesthetic possibilities inherent In steel
Vice President, Marketing construction.
Steel·framed buildings constructed anywhere in the United States
and designed by registered architects practicing professionally in
the U.S. (defined as the 50 states, the District of Columbia, and all ,
EDITORIAL STA~~ U.S. territories) are eligible. Each building must have been com·
Daniel Farb, Director of Publi cations pleted during calendar years 1979 or 1980.
George E. Harper, Editor
The structural frame of the building must be domestic sleel, bul il
is not required that the steel be exposed, or a part of the architec·
Georgia Harris, Editorial Assistant
tural expression. Buildings of all classifications may be entered,
and equal emphasis is given to all sizes and types in the judging.
Applicants are encouraged to submit their entries well before the
REGIONAL OFFICES May 8, 1981 closing date. There is no limit to the number of entries
NORTHEAST REGION by any individual or firm. Buildings named as previous AAE winners
New York, NY (Hdq.) 2t2l695-429t will not be eligible.
Boston, MA 6171329-74t7 Award winners will be featured in a special sect/on of the October
Philadelphia, PA 609/858-9354 issue of Architectural Record magazine. A formal awards banquet
Pittsburgh, PA 4121391-4474 in Chicago on October 27 will honor competition winners.
NORTH CENTRAL REGION
Chlcago,IL(Hdq.) 3121372.a957 Members 01 the 1981 Jury 01 Awards are:
Detroit, MI 3131356-2620
Minneapolis, MN 6121866-3791 Jacques C. Brownson , State Buildings Division ,
SOUTHEAST REGION State of Colorado, Denver, Colorado
Atlanta, GA (Hdq.) 4041456-7679 Bruce J. Graham, FAIA,
Charlotte, NC 7041375.a547 Skidmore, Owings and Merrill, Chicago, Illinois
Tampa, FL 8131879-0429
SOUTHWEST REGION Philip J. Meathe, FAIA,
Dallas, TX (Hdq.) 2141630-5236 Smith, Hinchman & Grylls ASSOCiates, Inc., DetrOit, Michigan
Houston, TX 7131529-5564
St Loul., MO 314172",332 Walter P. Moore, Jr., PhD., P.E.,
Walter P. Moore and ASSOCiates, Inc., Houston, Texas
WESTERN REGION
Lo. Angeles , CA(Hdq.) 2131444-4519 R. Randall Vosbeck, FAIA,
Denver, CO 303/831-4622 VVKR Incorporated, Alexandria, Virginia
San Francisco, CA 4151495-3550
Seattle, WA 206/624-5460 Competition rules are available from AISC, 400 North Michigan ••
GOVERNMENTAL AFFAIRS Avenue, Chicago, Illinois 60611 . Entries must be postmarked prior
Washington , DC 2021887-5768 to May 8, 1981. 0

2

We InVLte you to join more than 6,000 of your assocLates who are now
regularly receLvmg the AISC Engineenng Journal. ... The cost Is only
$6.00 for one year or $15.00 for three years; smgle Lssue $300
(Foreign rates: S8.00 for one year, $18 for three years; smgle Issue
•• --'

~

"
$4 00) SLmply fill out the attached form and send your check or
money order to begm your subscnptLon. Payment must be enclosed
'"
Z
a:
=>
0
wIth this order. Make checks payable to AISC. Foreign subscriptions ~

are payable in US. funds only. '"a:z I ' • - •

. -.'
.... I• •~ ....

w
!;
w
II: <':1
'"wz ~
~

u ;!
~ ~

~ '"c
'"-=.
~
~

f
~
Z> 0
en
eco ~
c e
S 0
0

To enter your subscription to the


!!
~ ~
c
=
'E
e•
u
:.I ." 0 ~
Z> M ."
'"u ,s w

AISC ENGINEERING JOURNAL detach and Ol


>
Ei ...,.. 5- u
~
~

return the attached envelope TODAY ..."


it
...,..c .,-
~'"
Z>

-
.]
ll'" 'U

..... 8 '"'" c: '" :;e -c....._


o 0
~
....
a: c
"1 '" ~ "
~

..
~ - u
"
'" ... .., ~ <
~il
<D '" .~
c .,.;;cn .. ft
>-


Z>

'" .. -; ~O
~
.. M
:! ;: 0
~ ~
...• >-: J..,c >-
" = ft

'"" >- ..,>- !!!.= -


~
E~
~ M ~
c ~ "
~
"
~

c " ~ " ~

~ t I ~
i,.. ""iii ' "Do
~

...:e: IW ,. , .. u c
u; \. . .J 1: , ou
ft
• i:'~ ...• ... :;; c

.
~
0
::;; 0
II !!!. w"
• » :
z• Ii' ctD
• •
---dZ----AY!NnO~/31V1S-----A1I~

----------------SS3YOOV

----------------- WOY~

OPOSTAGE
NECESSARY
111111
U
IF MAILED
INTHE
UNITED ~TATES

BUSINESS REPLY MAIL


f'IR~T CLASS PERMIT lifO. 11588 CHICAGO,IL

- POSTAGE WILL BE PAID BY-

AMERICAN INSTITUTE
OF STEEL CONSTRUCTION
P.O. Box 4588
Chicago, Illinois 60680
Poplar Creek MusIc Theatre, Hoffman Estates , IL IS largest of Irs kmd Stool-lUbe space frame bears on 42·m concrete columns Irs 60,000 sq
h (below) Shelters 7,000 people Indoors Vie w towards lawn seating area

Poplar Creek:
Space Frame for the Stars
M usic under the stars appears to
be a coming attraction in this
country. In keeping with this trend, the
formances, and related service and
food concession structures.
Poplar Creek was commissioned to
Nederlander Theatrical Corporation be a prototype for future theatres to be
recently commissioned an outdoor built in other parts of the country. That
theatre to serve the Chicagoland area. requirement led to a two-part SOlution:
The firm now owns or operates 29 fa· First , the par1<ing and access had to
cllitles across the country. be designed so that it could be mod·
The newest-and largest-Is the ified to fit any site; and, second, the
Poplar Creek Music Theatre In subur- compound, which includes all the
ban Hoffman Estates, Illinois. The ver- other theatre elements and relation·
sat ile facility, designed for popular ships, must fit near the center of park·
and classical music and dance, seats ing on any site, without substantial
• 7,000 under roof, plus another 13,000 modifications.
on terraced lawns. It provides the Chi· After a three·year search in the
cago summer market with 9()'100 per- Chicago land area, the 130·acre site in
Hoffman Estates was chosen for its its needs were In direct opposition to theatre. A 2().ft high sound barrier wall
accessibility, its location within a 15· that of being In a densely populated erected on the top of the lawn seating
minute drive of the Chicago market market area. Both state and county berm drops the sound level at that
and near a forest preserve to minimize noise ordinances were very restrictive house below allowable maximums.
sound control problems. regarding residential development The barrier also shields the theatre-
within the cone of sound produced by goers from sound from the nearby
Sound Conlrol Mosl Demanding a music theatre- estimated up to 110 tollway.
One of the most demanding require· decibels. Actually, only one residence The shape of the theatre/compound,
ments was sound control. However. falls within the cone of sound from the a circle, developed logically from the
relationsh ips of various elements. The
major element, seating, is a 160· fan
Lookmg toward stage and lawn seating area (bottom) . RadIating uplifts on columns hold house
shape. The thrust stage at the center
lightS Space frame and (oof deck underside afe pamted o"ght red. add festive air Oy
reflectmg flOOdllgnts Nore sound Oamer waifs In background occupies nearly half of the circle, with
a radius of 415 ft and a five·acre area.
Owners wanting to deliver specta·
tors directly to their seats, without the
need to go through or past another
seating section, led to a major depar·
ture from most theatre plans. Specta·
tors arrive at the theatre through a
main entry gate Into a central plaza-
behind the stage. From this plaza, via
ramps and bridges, they arrive directly
at the edge of the continental aisle-
ways under the roof, or to the edge of
the lawn seating. This spectator traffic
pattern was designed psychologically
to create a series of emotional experl·

,
ences. The sense of arrival at the the·
atre is controlled and enhanced be·
cause the ramps penetrate walls at the
edge of the theatre, which restrict its
approach view.

FI.t IS • Cornfield
To this point, the description of the
theatre has been two·dlmenslonal , as
flat as the cornfield from which it rose.
Actually, 370,000 cu . yds. of earth were
excavated from the sunken central
plaza and depressed seating under the
roof and from the parlling area to build
the 46-ft high sloped lawn area with its
excellent slghtllnes to the stage.
Security Is provided to half the en·
closed circle circumference by the 20·
ft sound barrier fence. Security for the
other half Is provided by a "ha·ha"
fence, so called because it cannot be
seen in the depression between two
l().ft and 2().ft earth berms which en·
close the central plaza. As a result , the
only penetration of the circle occurs at
the entrance gate and the depressed
service drive which passes under the
ramped bridges.

Unobslrucllve Space Frame


As for any theatre, unobstructed sight·
lines were an absolute must. Poplar
Creek's 6O,()()().sq ft space frame roof.
met that requirement. It includes a
160·ft and a 22O·ft clear span , 8·ft
deep, with cantilevers up to 50 ft. The
st eel space fra me is an irregular rec-
tangle with serrated edges that step
back from a maximum width of 230 It
to 90 It at either end. Maximum length
Is 340 ft.
The space frame was totally assem·
bled on the ground and erected by
cranes. Steel·tube chords came to the
site In SQ.ft lengths, where they were
field·bolted with diagonals to form 50. Reverse·flow traffIC. as spectators enter Poplar Creek oack of stage . then cross Orldge to
ft x SQ.ft and 5o.ft x SQ.ft sections, ".,door O( lawn seatmg Festive ConceSSIOn 8rea Brmospnere IS enhanced oy free -slandsng
which were then lifted in place. space 'rame thalldentd,es entry QBte to theatre (bottom)
The space frame bears on 12 con·
crete columns via 8·ft high pyramid
space frame members. Only six of
these columns circle the back of the
theatre, to provide maxim um visibili ty
o f the stage .
The underside of the three·lnch
wood roof deck, and the space frame,
are painted a bright red-orange. House
lights reflecting oft this painted sur-
face add to the festive quality of the
theatre. All catwalks, sound systems
and spotlight platforms are within the
8·ft high by lo.ft square grids of the
space frame.

A Feeling of Intimacy
Alt hough any theatre seating 20,000 Is


huge, comments of visitors on stage
express an unusual feeling of intimacy,
created In part by the enclosure. Even
though lawn areas are not covered,
the performers' slghtlines do not In·
elude open sky. The edge of the roof
appears to be below the top of the
sound·barrier wall at the top of the
lawn berm .
The "space frame for the stars"
opens its second season in June, fea·
turing such notables as John Denver,
Bob Hope, Henry Mancini and the New
York Philharmonic . 0

Architect
Rossen/Neumann Associates, AlA
SOuthfield, Michigan
Structural Engineer
Paul Gugliotta Consulting Engineers
New York, New York
Fabricator
VOlunteer Structures, Inc.
Nashville, Tennessee
Erector
loUiS HOffman
Milwaukee, Wisconsin


Owner
NED-PROP, a joint venture of Nederlander
A.alty and AKO General
Boston Store today In

In Support of Steel: An
MIlwaukee's Southfldge Mall


Architect's Choice for Retail Facilities
by James H. Donnelly

ost and time were the main rea- slons range from 24 ft x 24 ft to 32 ft x tlon period and any wall cost differen-
C sons our last 12 department store
proJects have been designed with a
32 ft. Flre·reslstive construction usu-
ally Is a code requirement.
tials resulting from the depth of the
structure.
structural steel system. Like many architects In the busi-
Over the last 20 years, we have com- Cost Comparisons-Steel vs Concrete ness of designing department stores
pleted over 50 major retail projects in The structural frame is a major cost in the late 1950's and early '60's, we
various parts of the U.S. Mercantile Item in multi-level department stores. provided clients with functional facil-
facilities we design are generally low· Considerable research time is spent ities, usually with a superstructure of
rise, two- or three-story buildings with by our firm each year in analyzing the reinforced concrete.
a floor area of between 100,000 to cost of various structural systems and But even In those days, our edict
200,000 sq ft. Structural bay dlmen- their components. For some projects, from owners was a quality building at
several systems have been designed reasonable cost, finished on time and
and bid, with final selection being within budget. The conventionally
made only after bids have been reo formed concrete superstructure had


James H Donnelly is a senior partner of Baxter ceived and costs known. been selected, on the basis of numer-
HodeU Donnelly Preston. a forty-five per- In making cost comparisons, our es- ous engineering and cost studies
son A /E 'Irm In ClnClnnall. OhiO. With the
IIrm for over thirty years, he has extenSive
timators consider the cost of the which tended to prove the concrete
experience in retail/shopping center plan- superstructure, foundation costs, the system was the most economical at
ning and deSign throughout the U.5. cost of financing during the construc- the time.

6
By the early 1970's, labor rates were systems. Steel was selected, based on minimum on these buildings, struc·
rising rapidly and costs of systems cost and delivery. The design included tural steel Is pre·bld . Award of the
which were field·labor intensive in· a floor system of 4·Y. In. concrete fill structural steel contract six weeks
creased more rapidly than those pre· on composite metal deck, composite prior to the award of the general con·
domlnately shop prefabricated. In girder design. Roof framing is bar tract usually gets the steel at the job
• 1973, our cost analyses showed the joists and metal roof deck. Floor sys· site, ready for erection, abOut the time
fireproofed structural steel frame had tems and columns are protected with foundations are completed . The con·
a cost edge over the poured·in·place spray-on fireproofing. A double ceil· structlon sequence Is established very
concrete structure. lng, used In the roof assembly, pro· early In the build ing process. The
As the years progressed, the cost vldes the necessary fire rating . building Is often scheduled by quad·
differences widened, until today we Speed of construction is particularly rants, and steel Is fabricated and
rarely consider reinforced concrete as Important In this northern state. The erected according to the sequence
an economical structural alternative construction start Is usually sched· that will be used for all other construc·
for this building type. Under special uled so as to complete the building en· tion work, Including store fixtures.
circumstances, we have found precast closure during the relatively short con· Fabrication of ductwork anb pipe
concrete to be competitive with steel. struction period, from mid·April to and their installation follow in the
In Wisconsin, we completed five mid·November. The steel structure same sequences, and begin before
buildings, and are In the process of system permits this kind of schedule, erection of the total structure. As steel
designing a sixth for the Milwaukee with time to spare. and deck are placed, mechanical and
Boston Store- a division of Federated It has been our experience that com· electrical trades can mOVe right In to
Department Stores . Three of those parable poured·in·place structures hang ductwork, pipe and conduit. The
Boston Stores, built prior to 1973, are required a minimum of four months ability to start ductWOrk, sprinkler sys·
poured·in·place concrete. They aver· longer to complete. Construction of tems and electrical conduit Immedl·
aged 460 calendar days from start of poured·ln·place concrete during those ately following the deck erection, with·
construction to opening. The last harsh Wisconsin winters Is difficult out waiting for removal of shoring , Is a
three are structural steel , which aver· and expensive. Our cost records show distinct time advantage. Six months
aged less than 320 days . that temporary enclosures and heat· after start, the building envelope can
Other Advantage. of Steel Ing for an average store building will be completed and Is ready for finish·
For a project now being completed be about $40,000 per month during the Ing trades.
in Racine, Wisconsin, bids were taken winter. Another factor considered In eval·


on both steel and precast concrete To hold the construction period to a uatlng systems Is the dimensional
1
~(lgtnaJBoston Store 's concrete-framed bUlldmg was enlarged With steel·framed addlllOfl
at conSIderable savings In bOth cost and time
-----------------------------------------------------------
depth of the structure and its effect on tural steel, It was necessary to use floors at columns with minimal addi-
floor-to-floor dimensions, cost of main beams up to four feet in width. tional cost.
stairs, vertical transportation, and This often limited the routing of pipe Always to be considered in the cost!
mechanical and electrical risers. To and conduit through floors at column time analyses is construction financ-
achieve a poured-in-place concrete locations. With the steel structure, Ing. In the last several years, Interim
structure of the same depth as struc- services can usually be routed through financing costs have had a significant •

Steel Roof System


Steel COlumn~I~"_--Bay Size --~..
-I

Steel beam I ,
--- ---H

" t..
CD
Metal rool deck
'"
Open web steel joists ---t--;.
-t--
'"co
N

~
Insula lion

Hanger wire 8-----


Fire-rated acousllcal ceiling
Beam splice ~
f
1-V," deep x 22 gao wide rib metal roof fire-rated 2' x4' acoustical ceiling ductwork, and hold-down clips . The •
deck, factory painted, on open-web board In exposed tee suspension sys- regular ceiling costs are not included ;
steel joists spaced between 5' -7" to tem . Un it costs include premium for wide-flange steel columns with spray-
4'-10", depending on bay size; wide- light fixture protection, flredampers In on fireproofing.
flange beams; system Is protected by

Steel Floor System


Metal deck-
fireproofing not required I- Bay Siza _I
Welded wire fabric
-----~

t
.
CD

Filler Beams-!-- '"


connectors ."'"
Concrete ala Steel Glrder-

R-.:..------R
Steel girder or
shown without necessary fireproofing
Steel Column J
3- '!. " lightweight concrete slab, 115 permanent composite metal deck, no spray-on fireproofing, stud shear con.
pcf, 3,000 psi, double steel trowel shoring required , 6x6-10/10 WWF, nectors at girder locations. No fire·
finish on 20 gao x 3" ribbed galvanized steel beams , girders and columns with proofing of steel deck required.

8
impact on cost comparisons and on tural steel , along with fast·track stepped·up demand for more cost·
the selection of the structural system. scheduling , has reduced financing effective bu ild ings. At Baxter Hodell
At 15% prime interest rates, construc· costs more than 25%. Donnelly Preston , selection of steel
tion financing of a typical department As retailers continue to battle infla· for the superstructure has resulted In
store project will be In the neighbor· tion and pressure on their margins significant savings to our clients in

• hood of $400,000. The switch to struc·

Concrete Floor & Roof System


from fierce competition, we expect a both cost and time. 0

!__ Ba y s l . e - - ---- 1

Dis tribution rib - - - - - . . . . .

Concrete Jois t
~
------,--=-,---0
~""'t~
1o l -1
~~~~~~:~~~
"i: :J
::::J L
I II II ~
L
II [ :'
'".

_i
oncrete beam
°


' -_ _ Concrete column

All concrete heavyweight 4,000 psi ; removable pans; 12" or 14" deep x 6" beams supported on spiral reinforced
cast·ln·place reinforced concrete slab wide reinforced concrete joists with concrete columns. For reinforced
(floor, 4-1/,"; roof, 2·% ") with double one or two distribution ribs, depending square concrete columns add an aver·
steel trowel finish, formed on 30" wide on bay size; reinforced concrete age of $0.06/ sq fI to unit costs.

Comparison of Framing Systems


Floor Framing Systems Roof Framing Systems
- --I
Overall Cost per sq. fl . 0 verall Cost per sq. ft .
Type Bay Size Depth June 1975 Jan. 1981 Depth June 1975 Jan . 1981

Steel 32' x 32' 2' ·3'1." $4.48 $6.51 1 ' ·11 " $1.78 $2.59
30' x30' 2' ·3'1." $4.30 $6.25 1 ' -8" $1 .77 $2.57
28' x 28 ' 2 ' ·3'/." $4.37 $6.35 1' $1.78 $2.59
24' x24' 1' ·10'1. " $4.16 $6.05 1 ' -4" $1 .75 $2.54

I- --
Concrete 32 ' x 32 ' 2' ·0 " $5.15 $8.27 2 ' ·0" $4.90 $7.87
30' x 30' 2' -0 " $5.07 $8.15 2 ' ·0 " $4.82 $7.74
28 ' x28' l' ·8 " $4.92 $7.90 1 ' ·8" $4.67 $7.50

• '-
24 ' x24 ' 1'·4%" $4.64 $7.45 1 ' ·4 % " $4.39 $7.05

9
.~
,
'.

.. •

Simmonds Precision Products ' new headquarters In Vergennes . VT. M"IIon<!ollar change order added second story to bUlldmg already
under constrUCtIon Ora wing (next pg.) details steel constrUCtion that speeded progress

Simmonds Precision: •
A Million-Dollar Change
by Erik A. Davis, R.A.

S immonds Precision Products, in


1979, decided to build an addition
to i ts Vergennes, Vermont plant for an
Design Considerations
The fast-growing company felt its
buildings had to have a flexible plan to
need to accurately schedule work
around operation of the existing plant,
was crucial to the owners.
In strument Systems Division. Previ· allow for future organ izational
ously, home for its administrative, changes. In itial construction of one Structural System
engineering and manufacturing facil· floor was planned , but with expansion Early In the design stages, the archi-
ities was in an extensive amalgama- potential for a second floor. Hence the tects recognized that a structural steel
ti on of pre-engineered buildings and roof system not only had to accom- system provided the necessary flex -
rented trailers. Designers decided the modate Vermont's 50 psf snowload ibility within the tight scheduling
new structure should combine the requirements, but also the need to re- demands. Structural bays, 24 ' x25' ,
existing plant 's metal skin with stone move and revise the roofing and insu - provided open-plan requirements, with
materials indigenous to Vermont 's lation system , with minimal waste , to a central core for mechanicallsupporr
Champlain Valley . Their best choice provide for a second level. Designs facilities. Diagonal bracing was
was to use locally manufactured pre- also included plans for a future placed behind precast panels; 20 · bar
cast spandrel , pilaster and infill pan- elevator. joists and 1'I• • concrete on 22 gao
els wi th exposed native aggregate A major design consideration was wide-rib metal deck provided the roof
over a structural steel frame. energy conservation , with the abil ity system; and steel beams were In-
to recapture and distribute waste serted for future stair openings to a •
process heat with in a thermally effi- second level.
£flk A DavIs IS a prOJeCI architect With cient building envelope. The bar joist system permitted the
Wiemann-Lamphere ArChitects, Inc Too, speed of construction, and the greatest flexibility for the mechanical

10
waste·heat reclamation and dlstribu· A Mlillon·Doliar Change Order fast·track process was established .
tlon systems. The structural steel Early in construction, the flexibility of The corporate architect quickly devel·
frame allowed a complete thermal steel framing surfaced when Sim· oped schematics for the exterior shell.
envelope to be developed, broken only monds decided to expand to the sec· Those came to local architects devel·
at points where the precast system ond floor as part of the contract al· oping engineering and construction
was attached. The flexibility Inherent ready In progress. documents. Concurrently, Interior
• In steel construction facilitated the At this point, columns and beams planning between design architect
compatibility of detail between the were at the job site, and the remainder and owner was rushed to completion.
preformed metal siding and the pre· of the steel was in production. Coor· Complications arose In the fact that
cast materials. dlnation and timing were critical, so a the structural firm responsible for the
first floor construction could not meet
the additional fast·track schedule, due
to other commitments. Another firm
was retained for work on this second
Inodt,." ,IUI."num 1I.,lIlrt"
.... Bb,' Clnl
phase. The ease of detailing Inherent
10 * ,Ionl bill." in steei construction facilitated the
1I."ld wOOd blocklnlil
transition . Several other design ele·
ml",t)llnl 1001
.. , ":1" ""'d In,ulaUo"
r,II,danl
~'POl'
I ments during progress also demon·
L3.3.t,. coni
strated the flexibility In a structural
steel system .
1. A 2O-in . cantilever was added to
,112.11/h'14"..gbrlc • • tl'oc '.,P
three sides of the building.
Wll,,22 IOln.clrt' b.,,,,_
'SHe totl'l _ _ 2. One stairway was added, another
reoriented 90· .
3. Elevator size was modified.
112 II)'OluII'I .sMlOI,d
Inlu"UO"
112"" g,ol""" 1".,,1011"0
t 4. A continuous band of glazing re-
placed the precast panel motif
used on the first floor. This meant
1/2' dl' •• ; rod., 113 pll
bracing had to be moved to the
W•• 13 "ub tro," COlumn. Interior, and Its exact location
could not be determined until


final plans were developed .
CtO.153,t"lglrl
All of these design modifications
,,, 2 aluminum Ing'l ~
were accommodated easily by the
ltd blocltltlg
112" g"OI ...m .lllbol,d
flexibility of detail inherent In steel.
clulklng And , the readily available steel com·
ponents permitted construction to
, " - - .,ndow """II continue without Interruption.
_lllcI"- The new work was Incorporated Into
the original contract with one simple
change order-for over one million
W4.,3 ttub IrOll'l Colll~ dollars! 0

112" lilY PI"'''' •• Ilboar., ~


2.e 11'1"1' Iluda
S" In,ulilioll
112" gyp,,,,m ."•• th ...."

pr,lIn.,hl" 3" In.ula'I" 1'11'11 o.~,


Architect s
Corporat.: Edward Ballantyne
2 1/2' contrete deck e.'enllon
White Pialns, New York
Wlemann·Lamphere Architects, Inc.
Burlington, Vermont
2 112" concle'e deck
Structural Engineers
W12.22 .".ndle' be.""
W12.22 .Iub ~.""., column. PIla•• 1·Richard Oall & ASSOCiates
,..wPl he 112. '"2'" Burlington, Vermont
""elal '01'" 10 ",alch lI.nel.
Phase II·Ourbrow Associates
Burlington, Vermont

prel_.hoed 3" WI.uAa'ed _1.1 p ...., - - General Contractor


al"'IiJIII".~ Breadloaf Construction
wood blocking
112'" O.,II'VfOt . . . .0.r4 IIIIer Middlebury, Vermont
Steel Fabricator
Vermont Structural Steel


Burlington, Vermont
I •
"I'll "'I.,t clo."", I~d .,'h bitt ,"lul,llOn ~

_II' elOlul, Ingle I /


COlnP neoPI~::t~Io:~~:II:~I:~do': r
11

Bedford Park Station:

N
A Home Away From Home
eeded: a residential atmosphere
for firemen-and a shelter for fire
Living areas include small personal
spaces, and a landscaped courtyard ,
porting columns. A total of 10 wide·
flange columns, five at the front and

engines-all In one. walled·in for privacy. five at the back, support the entire roof
The answer: Bedford Park, Illinois A large clear·span structure houses structure.
Fire Station, a through·access four· the fire engines and permits unob· The trusses are sealed at columns
bay structure that provides living, din- structed access to all fire-fighting and perimeter with butt·Jointed glass
ing and sleeping areas. And engine equipment. Exposed structural steel to minimize the need for artificial light-
shelter, additional equipment support trusses, 15 It o.c.-highlighted by Ing. Finely detailed roiling glass doors
spaces, work bench zone, gear lock- bright yellow paint-span 80 It over permit the visual excitement of dis·
ers, a hose·washlng/drying area and apparatus In a longitudinal direction, playing bOth the space and the fire
storage. and cantilever 5 It beyond their sup- engines.
Another dramatic visual impact Is
created by a counterplay of environ-
ments: the fire-fighting area with Its
bright steel structure, the clear glass
and the warm-toned, brlck·enclosed
residential home·away·from·home. 0

Architect/Structura l Engineer
Holabird & Root
Chicago, illinois
General Contractor
Mutual Development Company


Palos Heights, llIInois
Owner
Viliago of Bodford Park
Bodford Park, Illinois

12


$
• --


Just being complered addition to PhlladelptllB Skylme IS 615 Chestnut Street Swldlng WI llean of hiS10flC mall

A Fast Track-
and a Million in the Bank
by Robert K. Huzzard

saved $1 million with steel framing. for the S19·mlllion structure, accord-
I n the shadow of Independence Hall,
a just·being·completed office struc·
ture met the needs of design-and
The 17-story structure-the 615
Chestnut Street Building-does much
Ing to John D. deMolI, PE, AlA, pres·
Ident of Ballinger, the archltecturall


more than provide 12 floors of prime engineering firm who designed the
office space and house 400 cars In building. " We really chose a steel fram-
Philadelphia's Independence Mal l. Ing system because It was the most
RObert K HuzzBrd IS a sales englOeer wl!h Ihe
Philadelphia Sales dlsHlel 01 Bethlehem The building's steel framing provid- efficient way to meet our design spec·
Steel Corporation ed the design and end·use flexibility Ificatlons and the developer's require·

13
,I
,

Hlstofle area IS sIte of "615" BUlldmg. new structure overlookmg Independence Mall NatIonal Park. Sreel frame of structure
IS chamfered (above) to maximIze amount of rentable offIce space overlooking city. Note floors SIX to eight
feature stepbacks for balconies .

ments for fast-track construction." dlcated a savings of between $1 .50 corners that give '615' its distinctive


Ballinger knew from the beginn ing and $2 per sq ft . six-sided shape and stepped, land-
that steel framing would be cost-effi- scaped terraces," deMoll says. " The
cient for the structure. But further Distinctive Shape use of steel resulted in easier fabrica-
analysis of the economics of steel , Another plus, "Steel framing gave us tion and quicker construction on a
compared to reinforced concrete, in- flexibility to create the chamfered congested downtown site, which '615'
14
virtually fills. The land was the last and typical 1I00r beams are W12x14. and other nearby office buildings.


open parcel in the Independence Malo The composite steel frame, 11 .2 psf, Those warm tones continue through
Urban Renewal Area." has moment connections to resist the lobby, for which an original George
Construction, which began in May, longitudinal wind loads, while braced Segal sculpture was commissioned. 0
1979, is soon to be completed. The frames resist transverse wind loads.
fast·track construction schedule re- Connections are welded or fleld·bolted
quired all·season construction, so with ASTM A325 high' strength bolls. Architect/Structural Engineer
steel was used " because it was not af· The floor Is a 3 V. ·ln . lightweight slab Ballinger
Philadelphia, Pennsylvania
fected by the weather." on a 2·ln . deep galvanized steel deck.
General Contraclor
More Renlable Space Historical Setting LF. Driscoll Co.
Foundation costs of the " 515" were reo The site, purchased from the Philadel- Bala Cynwyd, Pennsylvania
duced because the steel frame weighs phia Redevelopment Authority was Fabricator
less than a comparable concrete developed In keeping with the city's Leh igh Structura l Steel Company
structure, deMoll further notes. " The architectural tradition, according to Allentown , Pennsylvan ia
use of steel allowed longer spans-45 Designer Gustafson. The three·story
limestone facade on Chestnut Street Erector
It-than practicable with other mate-
Falcon Steel Company
rials. These spans were accomplished complements a similar one on the Wilmington , Delaware
wllh beam depths permitting efficient Public Ledger Building across the
1I00r-Io-floor heights (fioor-Io-lioor, transltway and provides a street scale Owner
12 '-8'; lloor·to-celling, 8 '-5' ). " for " SI5's" stores. Russet brick facing Seventh & Chestnut Street Associ ates
Ballinger' s design director, Bill harmonizes with Independence Hall Ph iladelphia, Penn sylvan ia
Gustafson, adds, " These longer spans,
resulling In typical bays of 45 ' x 20 '
allow tenants to plan their space with Office WIth a view- and what 8 Vlew-of cradle of liberty Building 's strategIc locatIOn
greater flexibility. Floor plans are de- places It In center of city actiVities Three floors boast landscaped balcomes Longer $pans
signed around 5' x 5 ' modules so ten· of steel frammg permIt greater lloor plan fleXIbility (see plan , below)
~---~-
ants can more efficiently arrange


large computer areas, conference
rooms and additional work spaces."
What this means Is that the 351,455
sq It (net rentable) of office space is
virtually column·free, providing open
areas that permit tenants to have more
corner offices. The building ground
1I00r Includes 20,000 sq ft of retail
stores In a prime commercial Quaker
City area, and a finely appointed lobby.

Changing Configuration-In Steel


he next four levels, rectangular in
shape, provide 168,000 sq It of leased
parking space. But at the sixth story,
the first office level, "515" changes its
shape. Chamfers are formed at the
southeast corner-which faces Inde-
pendence Mall, Society Hill and the
Delaware River-and at the northeast
..
corner which angles for views of The • •
Gallery, the country's first new center
city shopping mall.
The beveled corners gradually step • • • • I • •
back to form a series of terraces on
the sixth to eighth floors. Here full
I
chamfers form and continue to the top
1I00r.
The "615's" frame Is primarily ASTM
I I • • •

A572 (Gr. SO) hlgh·strength, low·alloy

-
steel. Wind frame and braced frame
• members were fabricated from A36
s' eel. Typical girders are W24x7S, col·
umns vary from W14x211 to W14x48, ----- 15

SpaciOUS 5O-h h/f}h atflum hOuses two escalators for new second story addll/O() to ShatpSlown Genter 'S boOming
shoppmg mall . Landscapmg of 12·ft fICus trees and hangmg t>askets of ferns lend refreshing ambience to moderntzed facility

Sharpstown Center:
Things are Looking Up!
hat happens when a 2Q·year old The first air-conditioned shopping So, Instead of moving outward, as
W shopping center runs out of
badly needed space for new stores?
center In the Gulf Coast area, Sharps·
town was a very profitable center, with
most older centers do, Sharpstown
moved up.
And there Is no adjacent land area on 100% occupancy over the last 18
which to build the new space? At years. The demographics of its loca· Double-decker Precedent
Sharpstown Center, 1(\ booming sub-
urban Houston, the only way to build
was up-with a steel·framed second
tion, and a demand for more retail
space, pointed to a need for expan·
sion-a need that rocketing land
Houston·based shopping center de-
veloper Arthur M. Fischer, owner
Sharpstown , believes the trend of the
Of.
story on the existing concrete-framed prices would have made prohibitive, '80's will be to build upward . He ap·
structure. even If land were available. plied his "double-decker" thinking to

16

Sharps town, not only the largest but
also the shopping center with the
highest gross sales per square foot of
entered at 9 p.m. with drills, cranes,
forklifts and air compressors-and
quit at 6:30 a.m., in time to clean up
any In the dynamic Houston market. the debris and move out their equip·
Fischer embarked on a 519,000 sq ft ment In time for a 10 a.m. store
expansion, marking the first time a opening.
major shopping center of this size "At night the center's Interior
(one million sq It) had a second level looked like the Houston freeway at
added to It. The task of building a sec· rush hour," according to the project
ond level was precedent·settlng. There manager, Peter Jacobson.
were no textbooks to follow. One of The general manager of Sharpstown
the major needs was to keep the cen· Center, Ed Wolochln, pOints out,
ter operational during construction. " Maintaining the trust of our mer·
chants was the key to continued coop-
Pardon Our Dusll eration and high enthusiasm. From
To keep the center operative, the proj· the start of construction, I received
ect had to proceed from the outside In. calls from merchants commenting on
First, they had to build a second·story how pleased they were with the clean·
roof before they destroyed the old one. liness and the progress." Sales reo
Once the new roof was on, the old one ports showed Increased business for
was stripped away to be converted most merchants.
Into the floor of the second story. After the Christmas rush, construc·
Customer and merchant relations tlon accelerated. Demolition crews


were vital to the project. To minimize
disruption of retail activities by the
construction efforts, the general con· Busmess as usual (r.) as huge second level
tractor worked a night crew from clos· nears completion , while shopping continues
Ing until store opening time. Crews unmterrupted on f,rst ·floor retail area

Architecture of new upper level adds welcome modern motif to Sharpslown Genter
worked round the clock. Maintaining the mall was taking. Customers and Creative Technical Challenges Met •
that merchant cooperation became merchants alike were tantalized by the " When this structure was built on
more difficult. Fischer Indicates, " By appealing direction and design of the Texas prairies In 1961, no one even
February, we were saved by the shape renovated mall ." considered a need for additional
space. The technical challenge was to
develop an economically feasible de-
Steel goes up on Sharpstown Center roof EXlstmg concrete columns were located and sign for the second level," Jacobson
SQuared to steel columns with 20·m. anchor bollS (lower fight corner of photO) Giant crane commented .
With 400-(, boOm (boflom) hoisted steel columns up and across roof of center Very little construction Is without
surprises. The first one at Sharpstown
was a long underground river bed. It
was discovered when the structure's
foundation and steel support columns
were tested for their strength to carry
a second level. As a result, the founda-
tions needed to be fortified In 44
places. The contractor had to go Into
shops and take 200ft borings for soil
samples. Then he went back and
poured new footings seven feet down
in weak soil areas. The lighter weight
of steel framing became a key reason
to use structural steel on the second-
level addition.

Sleel Up-with World's Largest Crane


Now that the new structure had a solid
foundation, next step was to add
structural steel on top of existing con- ,
crete columns. The new steel columns
had 10 be squared to the old columns
and attached with 2O-ln. anchor bolts.
For each steel column, two holes had
to be drilled in the roof to lodge Ihe
anchor bolts-a process which took a
whole day for each column.
After the anchor bolts were in place,
there was a two-month waiting period
before the 1,000 tons of steel could be
erected. During that time, Jacobson's
team scoured the country for a crane
with a 400-ft boom needed to hoist the
steel up to the new roof level. Iron-
ically, they found the world's largest
rubber-ti red crane, a 2oo-ton monster
manufactured by Clark, right in their
backyard.
In just three months, Sharpstown
Center had a new, waterproof roof - a
four-ply builtup rOOf, 2-in. of Perlite
over an insulated metal deck. Second
floor walls were enclosed with marble-
crete. Now the old roof could come
down.

Night Crew Is Back


Interior work brought the night crew
back. After store hours, demolition of •
the roof over the main central area
moved fast. The rOOf, sculptured in
precast concrete folded plates, had to
be cut into five sections to be removed. Architect Ganeral Contractor
Each weighed 88,000 pounds. Special Nlkita ZukoY, AlA H .A. LoU Constructio n Co.
steel beam jigs were set up to ease the New York , New York Houston, Texas
• sections down to a forklift to be carted Structural Engineer Owner/De •• loper
away to the rubbish heap. T.Y. Lin & Associates Arthur M . Fischer, Inc.
Removing the old builtup roof was Houston, Texas Houston, Texas
next. This arduous, tlme-consuming
task took three months because the
work had to be done by hand. The Roof goes on over new addition before Old one was removed Alfcondmomng and skyllgnt
older structure could not support the Units also remained In place until bUlldmg was enclosed
weight of heavy demolition equipment.
Two complete asphalt - and - gravel

-
roofs had to be removed, and three
inches of lightweight concrete taken
off of the 1,500 original double tees.

More Surprises
The double·tees presented another
surprise. They were supposed to be
arched to a positive camber-but 18
years had flattened them out. Before a
-
new floor could be poured, every one
of the 1,500 tees had to be surveyed at
each end and In the middle, to check
the proper arch. Where they had nega-
tive arches, workmen had to go into
stores, remove the ceiling and jack up
the tees with shores.


With the old roof gone, a delight-
fully spacious 5O-ft atrium was created
for Sharpstown 's center court. The
final stages of the extensive remod-
eling Included a pre-finished metal
ceiling, new storefronts, three esca·
lators, glass elevators and decorative
stairways.

Old It Pay Off?


The Sharpstown expansion has provo
en to be a very successful venture.
Over 85 new tenants moved into the
center, some making their Initial entry
into the booming Houston market·
place.
"The continued growth of South-
west Houston, plus tt]e tremendous
customer acceptance of products and
services offered by Sharpstown retail·
ers, dictated this expansion. Though
we took a risk of sorts In this prec-
edent·setting expansion, we couldn't
be more pleased with the outcome.
Dollar for dollar, Sharpstown's expan·
sion proves that, for the shopping cen -
ter industry of the future, the only way
to go Is up." 0


Q1e shortcut to save lime was to remove old
precast folded plates before structure was
enclosed along SIdeS MaSSIVB BB,()()().pound
pteC8S were gingerly lowered by special steel
beam J'9S shown
AMERICAN INSTITUTE OF STEEL CONSTRUCTION

~
The Wrigley Building, 400 North Michigan Avenue
Chicago, IL 60611
ULK RATE~
US POSTAGE
PAID
WHEATON, ILL
Address Correction Requested Permit No. 1786

Bridge to Renewal-Color it Red!


A pedestrian bridge in Harrisburg,
Pennsylvania was suggested as a
first step to the city's downtown re-
newal plan. The new Walnut Street
Bridge crosses a major street to con·


nect the hillside Capitol Park to a new
mixed·use complex named Strawberry
Square.
The park·level bridge permits those
who work In the capital buildings, sit·
uated In the park, to have easy access
to other state buildings, offices, res·
taurants, entertainment and retail
shops in the Square. Future phases of
the renewal plan Include extensions of
this pedestrian walkway.
The structure, which spans 130 It
from the park sidewalk to the second
floor of the Dept. of Revenue Building,
consists of two unusual steel girders,
connected by wide-flange beams and
topped with a concrete slab.
In plan, elevation and cross'sectlon,
the bridge Is shaped to sallsfy the dlf·
ferent needs of park and building. The equipped with down lights that be- General Contractor
vertical curve of the lower girder come a nlghllme marker for the street· Mellon·Stuart Company
flanges suggests the support and level entrance. Harrisburg, Pennsylvania
spring of traditional bridge construc· The bright red paint shouts this is Steel Fabricator
lion. The bridge deck widens as It ap- no railroad bridge-but rather new life Will iamsport Fabricators, Inc.
proaches the building to provide a for downtown Harrisburg. 0 Williamsport , Pennsylvania
gracious entryway-a width not re-
quired for the street crossing. The top Steel Erector
Architects C & S Engineers
flanges of the girders slope downward
lawrie & Green·Mitchell/Glurgola New Cumberland, Pennsylvania
toward the deck at a 45-degree angle


ijolnt arch itectural venture) Owner
to discourage pedestrians sitting and
Philadelphia, Pennsylvan ia Harristown Development Corporation
climbing.
The windscreen Is glazed with tem· Structural Engineer Harrisburg , Pennsylvania
peredllamlnated glass. The soffit, en· Skilling, Helle, Christiansen, Robertson
closed with an aluminum ceiling, Is New York , New York