Definition:-
Objective :-
Production plan is available and one has to schedule the plan across
different production version and resources using the planning Table.
Planned orders are already available, but it might be required to create
planned order manually through while using MF50 transaction. At the
end of this document one will be able to create Planned order through
MF50 transaction code.
Prerequisites:-
Production Plan
Production versions and Resources
Menu path :-
Note: The top part of the table shows the work centers.
The bottom part of the screen shows the products that can be
manufactured at the work centers and the present production
schedule.
8. Press in the required row and column where you want to create
your planned order, for example, row PE-1 RX-1 and column 05.11.02
16. The message bar displays “Changes were made to the master
plan”