F F

770
E E

760

D D

750

C C

740

B B

730

A A

720

Sheet Number
NOTES : PROJECT : Scale :-1:
DRAWING TITLE : BARAHI HOTEL, LAKESIDE, POKHARA

ROCKFALL Date :-

SANJU JAIN GEOTECH FIRM PVT. Drawn By:-

PROTECTION DESIGN LTD


Design By:-
Sheet

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

BUILDING
CONSTRUCTION
E E

AREA ISMB200

M20 CONCRETE
D

Double Layer Gabion


mesh
C C

Ø75mm MS Pipe-3m
Long
Ø10mm Steel Cable
pulled to full strength
M20 CONCRETE
B B

Double Layer Gabion


mesh BOUNDARY GABION
WALL

A
ROCKFALL PROTECTION Ø10mm Steel Cable
pulled to full strength
A

@ BUILDING CONSTRUCTION
Sheet Number
NOTES : PROJECT : Scale :-1:
DRAWING TITLE : BARAHI HOTEL, LAKESIDE, POKHARA

ROCKFALL Date :-

SANJU JAIN GEOTECH FIRM PVT. Drawn By:-

PROTECTION DESIGN LTD


Design By:-
Sheet

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

E E

D D

C C

ROCKFALL PROTECTION @ Ø75mm MS Pipe-3m

OTHER AREA THAN BUILDING


Long

M20 CONCRETE
B B

CONSTRUCTION Double Layer Gabion


mesh BOUNDARY GABION
WALL

A Ø10mm Steel Cable A


pulled to full strength

Sheet Number
NOTES : PROJECT : Scale :-1:
DRAWING TITLE : BARAHI HOTEL, LAKESIDE, POKHARA

ROCKFALL Date :-

SANJU JAIN GEOTECH FIRM PVT. Drawn By:-

PROTECTION DESIGN LTD


Design By:-
Sheet

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

E E

D D

Ø10mm Steel Cable


C pulled to full strength C

B B

A A

Sheet Number
NOTES : PROJECT : Scale :-1:
DRAWING TITLE : BARAHI HOTEL, LAKESIDE, POKHARA

ROCKFALL
Date :-

SANJU JAIN GEOTECH FIRM PVT. Drawn By:-

PROTECTION DESIGN LTD


Design By:-
Sheet

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

E Ø75mm MS Pipe-3m E

Long
D D

M20 CONCRETE
C C

B B

Double Layer Gabion


A

mesh BOUNDARY GABION A

WALL
Sheet Number
NOTES : PROJECT : Scale :-1:
DRAWING TITLE : BARAHI HOTEL, LAKESIDE, POKHARA

ROCKFALL
Date :-

SANJU JAIN GEOTECH FIRM PVT. Drawn By:-

PROTECTION DESIGN LTD


Design By:-
Sheet