PROYEK KERETA CEPAT JAKARTA - BANDUNG

RELOKASI FASOS FASUM AREA 2

DRAWINGS ALBUM
RELOCATION OF ROAD SUKATANI VILLAGE
DK 108+300 - DK 108+600
KABUPATEN BANDUNG BARAT

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273
APPROVAL SHEET

RELOCATION WORK:

ROAD SUKATANI VILLAGE


DK 108+300 - DK 108+600
KABUPATEN BANDUNG BARAT

PREPARED BY APPROVED BY APPROVED BY

PT.WIJAYA KARYA CRDC HSRCC HSRCC


PT WIJAYA KARYA (Persero) Tbk.

( ................................... ) ( ................................... ) ( ................................... )


....................... ....................... .......................

APPROVED BY APPROVED BY APPROVED BY

PT.KCIC PT.PSBI ASSET OWNER


Pilar Sinergi BUMN Indonesia

( ................................... ) ( ................................... ) ( ................................... )


....................... ....................... .......................


- -


ROAD RELOCATION
DESIGN PT. DYACON


DRAINAGE
LENGHT=129M

BARRIER
LENGHT=79M
DRAINAGE
LENGHT=382.53M


- -

65
124
87

91
125

88

123
127a

127

90
89 128a
128
130

129 129a
133
132

135a
135 134
BOX CULVERT
137 138a
STA.0+130
136
137a
RELOCATION ROAD
138 139a
136a
SUKATANI VILLAGE
139

138a 146a
140
141
146

144

149
144a

149a

i
an
kat

a
uly
Su

m
sa

rta
De

Ke
sa
De
REVISION HISTORY

BARRIER
LENGHT=252M

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -

P101

A3

ROAD RELOCATION
DESIGN PT. DYACON

DRAINAGE
LENGHT=129M

DRAINAGE
LENGHT=382.53M

BARRIER
LENGHT=79M

BOX CULVERT
STA.0+130

RELOCATION ROAD
SUKATANI VILLAGE

REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

BARRIER
LENGHT=252M

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -

P101

A3
TYPICAL 1

CL

TYPICAL DETAILS OF THE ROAD

TYPICAL 2

REVISION HISTORY

CL

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

TYPICAL DETAILS OF THE ROAD


REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -
P101

A3
TYPICAL 3

CL

TYPICAL DETAILS OF THE ROAD

REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
a
146
a
1 39
a
138

146
a
a

129
128

139
a
127

141
124

128

149
129

140
125

144

a
14 9
132

138
127

a
144
136
3
12

Ground Road R Ground Road L


Desain Road CL
Ground Road CL

CENTER OF TRACK
DK 108+420 DK 108+440 DK 108+460 DK 108+480
DK 108+320 DK 108+360 DK 108+380 DK 108+400
DK 108+260 DK 108+280
DK 108+240
DK 108+220 DK 108+300 DK 108+340
DK 108+200
DK 108+180
DK 108+160
DK 108+140

Ground Road L
Desain Road CL

REVISION HISTORY

Ground Road R
Desain Road CL PT. ANDIKA PERSADA RAYA
PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -

P101

A3
Desa Kertamulya
Desa Sukatani

DK 108+560 DK 108+580 DK 108+600 DK 108+700


DK 108+480 DK 108+500 DK 108+520 DK 108+540

Ground Road L Ground Road CL Desain Road CL


Ground Road R

Ground Road L
Desain Road CL REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

Ground Road R
Desain Road CL

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -

P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
Protection fence
Landmark post
36.61 22.29

2.00
Arch revetment slope protection
5.0%
713.55
DIIK 108 +320.00

Protection fence
2.00

Landmark post
1:2.
00
Arch revetment slope protection
5.0% 709.62

Left Track Right Track Arch revetment slope protection


1:2. CL CL
00
6.00 00
2.00
5.0% 4.40 4.55 4.90 2.00 1:2.
5.0% 5.0%
703.77 5.0% 703.74
Graded crushed stone with 5% cement
702.45 Group A, B fill materials 702.15 702.43
0.50m crushed stone bedding layer and pile capping 701.25
700.67 700.65
Range of CFG Pile reinforcement
5.00

696.25
14.65

30.14 21.35
Protection fence
Landmark post

Arch revetment slope protection


REVISION HISTORY
2.00

Protection fence
Landmark post
5.0% DIIK 108 +340.00
710.33 2.00
1:2. 5.0%
00
Arch revetment slope protection 708.77
1:2. Left Track Right TrackArch revetment slope protection
00 CL CL
6.00
00
PT. ANDIKA PERSADA RAYA
2.00
5.0% 4.40 4.54 4.90 2.00 1:2. PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
5.0% 5.0%
703.76 5.0% 703.74
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

Graded crushed stone, 0.6m


702.41 Group A, B fill materials 702.15 702.39
0.50m crushed stone bedding layer and pile capping 701.25
700.63 700.61

Range of CFG Pile reinforcement 5.00

696.25

14.64

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
23.57 19.79

Protection fence
Landmark post

Protection fence
Landmark post
DIIK 108 +359.07
2.00
708.98 Arch revetment slope protection
1:2. 707.74
0 0 Left Track Right Track Arch revetment slope protection
CL CL
2.00 4.40 4.52 4.90 2.00 00
5.0% 5.0% 1:2.
703.74 5.0% 5.0% 703.72
Graded crushed stone, 0.6m
702.37 Group A, B fill materials
702.12 702.35
0.50m crushed stone bedding layer and pile capping
701.22
700.59 700.57

Range of CFG Pile reinforcement5.00

696.22

14.62

DIIK108+405.00 Side ditch


Protection fence
Landmark post

19.32 17.50

Protection fence
Landmark post
DIIK 108 +380.31
REVISION HISTORY
Arch revetment slope protection
2.00 Left Track Right Track Arch revetment slope protection
5.0% CL CL
705.68 1:2. 705.50
00 2.00 4.40 4.51 4.86 2.00
5.0% 5.0%
5.0% 0
703.72 5.0% 703.70 1:2.0
Graded crushed stone, 0.6m
PT. ANDIKA PERSADA RAYA
702.33 Group A, B fill materials702.10 702.31 PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
0.50m crushed stone bedding layer and pile capping
701.20 JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

700.55 700.53

Range of CFG Pile reinforcement


6.00

695.20

14.57

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
9.80 12.66
DIIK 108 +405.00

Protection fence
Protection fence

Landmark post
Landmark post
Left Track Right Track
CL CL

4.40 4.49 4.82


703.70 5.0% 703.92 5.0% 703.67
Graded crushed stone, 0.6m
702.50 Group A, B fill materials702.08 702.26
0.50m crushed stone bedding layer and pile capping
701.18
700.50 700.48

Range of CFG Pile reinforcement 7.00

694.18
14.52

Protection fence

12.27 14.78
Landmark post

Protection fence
DIIK 108 +425.00

Landmark post
Left Track Right Track REVISION HISTORY
CL CL

2.00 4.40 4.48 4.79 2.00


1:2. 5.0% 5.0%
00 703.68 5.0% 703.98 5.0% 703.66
Graded crushed stone, 0.6m
702.24 Group A, B fill materials702.06 702.22 PT. ANDIKA PERSADA RAYA
Arch revetment slope protection 0.50m crushed stone bedding layer and pile capping
701.16 PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
700.46 700.44 JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

Range of CFG Pile reinforcement 8.00

693.16
14.46

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
10.85 14.84

Protection fence
DIIK 108 +441.81

Landmark post

Protection fence
Landmark post
Left Track Right Track
CL CL

2.00 4.40 4.47 4.76 2.00


1:2. 5.0% 5.0%
00 703.66 5.0% 703.62 5.0% 703.64
Graded crushed stone, 0.6m
702.21 Group A, B fill materials
702.04 702.19
Arch revetment slope protection 0.50m crushed stone bedding layer and pile capping
701.14
700.43 700.41

Range of CFG Pile reinforcement 8.00

693.14
14.42

10.55 15.33
DIIK 108 +460.56
Protection fence

Protection fence
REVISION HISTORY
Landmark post

Left Track Right Track

Landmark post
CL CL

2.00 4.40 4.45 4.73 2.00


703.64 5.0% 5.0% 703.62
5.0% 702.85Graded crushed stone, 0.6m 5.0%
702.17 Group A, B fill materials 701.96 702.15 PT. ANDIKA PERSADA RAYA
0.50m crushed stone bedding layer and pile capping 701.06 PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
700.39 700.37 JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

Range of CFG Pile reinforcement 8.00

693.06

17.08

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
DIIK 108 +480.00
15.05 19.50

Protection fence
Protection fence

Landmark post
Landmark post
Left Track Right Track
CL CL

4.40 4.44 4.69


Arch revetment slope protection 703.62 5.0% 5.0% Arch revetment slope protection
703.61
Graded crushed stone, 0.6m 1:1.
7 5
1:1. Group A, B fill materials 75
2.00 701.53 701.36 2.00
5.0% 5.0%
700.15 0.50m crushed stone bedding layer and pile capping 700.46 700.13

Range of CFG Pile reinforcement

9.00

691.46
23.25

14.62 19.95

Protection fence
DIIK 108 +495.97

Landmark post
Protection fence
Landmark post

Left Track Right Track


CL CL
REVISION HISTORY
4.40 4.44 4.67
Arch revetment slope protection 703.60 5.0% 5.0% Arch revetment slope protection
703.59
Graded crushed stone, 0.6m
75 1:1.
2.00 1:1. Group A, B fill materials 75
701.25 2.00
5.0% 700.86 5.0%
700.12 0.50m crushed stone bedding layer and pile capping 699.96 699.90 PT. ANDIKA PERSADA RAYA
PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

Range of CFG Pile reinforcement


9.00

690.96
23.60

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
14.12 19.48

Protection fence
DIIK 108 +520.64

Landmark post

Protection fence
Landmark post
Left Track Right Track
CL CL

Bilateral geogrid 4.40 4.43 4.62


DIIK108+510.00-DIIK108+710.00 703.58 5.0% 5.0% 2.00
703.57 Arch revetment slope protection
Arch revetment slope protection Graded crushed stone, 0.6m Bilateral geogrid
75 Group A, B fill materials,1.9m 1:1. DIIK108+510.00-DIIK108+610.00
2.00 1:1. 75
5.0%
700.07 700.11 Group A, B or C fill materials
0.50m crushed stone bedding layer and pile capping 700.26 5.0%
699.36 699.65

Range of CFG Pile reinforcement


10.00

689.36
25.19

DIIK 108 +543.56


14.52 19.84
Protection fence

Protection fence
Landmark post

Landmark post
Left Track Right Track
CL CL

4.40 4.42 4.58


Arch revetment slope protection703.56 5.0% 5.0% 703.55 Arch revetment slope protection REVISION HISTORY
Bilateral geogrid Graded crushed stone, 0.6m
75
Bilateral geogrid
2.00 1:1. Group A, B fill materials,1.9m 1:1.
75
5.0% Group A, B or C fill materials 2.00
700.02 700.14
0.50m crushed stone bedding layer and pile capping 700.29 5.0%
699.36 699.40
PT. ANDIKA PERSADA RAYA
Range of CFG Pile reinforcement PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

10.00

689.36
24.48

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -


P101

A3
14.87 21.20
DIIK 108 +568.92

Protection fence
Landmark post
Left Track Right Track
CL CL

Protection fence
4.40 4.41 4.54

Landmark post
Arch revetment slope protection 703.53 5.0% 5.0% 703.52 Arch revetment slope protection
Graded crushed stone, 0.6m
Bilateral geogrid 5 1:1. Bilateral geogrid
:1.7 1 Group A, B fill materials 75
2.00
5.0% 700.26
699.61
700.27 0.50m crushed stone bedding layer and pile capping 1.00
1.50 699.36 5.0%
698.46

Range of CFG Pile reinforcement

12.00
DIIK108+551.30 culvert
DIIK108+551.30 culvert

687.36
26.26

13.95 20.88
DIIK 108 +585.00
Protection fence

Left Track Right Track


Landmark post

CL CL

Protection fence
4.40 4.41 4.51

Landmark post
Bilateral geogrid
Arch revetment slope protection703.52 5.0% 5.0% 703.51 Arch revetment slope protection
Graded crushed stone, 0.6m REVISION HISTORY
75 1:1. Bilateral geogrid
2.00 1:1. Group A and Group B soil,1.9m 75
5.0% 1.00
Group A, B or C fill materials 700.26
700.13 700.32 0.50m crushed stone bedding layer and pile capping 5.0%
699.36
698.50
PT. ANDIKA PERSADA RAYA
PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

Range of CFG Pile reinforcement

13.00

686.36
25.59
REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -
P101

A3

a
146
a
a

139
138

146
a
a

129
128

139
a
127

141
124

128

149
129

140
125

144

a
149
132

138
127

a
144
136
3
12
134
65

130

REVISION HISTORY

a
138
87

133

137

a
136
88

135
89

a
137
a

PT. ANDIKA PERSADA RAYA


135

PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT


90
91

JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -

P101

A3
Desa Kertamulya
Desa Sukatani

REVISION HISTORY

PT. ANDIKA PERSADA RAYA


PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -

P101

A3
B

SECTION - B
SCALE 1 : 50

PLAN OF BOX CULVERT


SCALE 1 : 50

REVISION HISTORY

DETAIL OF PARAPET
PT. ANDIKA PERSADA RAYA
PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273

SECTION - A
REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -
P101

SCALE 1 : 50

A3
SECURITY FENCE STANDARDS

INLET INLET INLET

CROSS SECTION LONG SECTION OF SECURITY FENCE

5
15Ø10 (N5)

Ø16-100 (N1)

N1
Ø12-100 (N7)

PAGAR PENGAMAN

Ø12-200 (N6) Ø16-200 (N2)

4
Ø12-200 (N4) Ø16-200 (N3)
3

2
PONDASI 6

CROSS SECTION LONG SECTION OF SECURITY FENCE

14.5
15.6

10

REVISION HISTORY
20.5
45
10

∅16 Ø16-100 (B1)


42+h/cos5.9°

235.8 N1
23.

∅16 ∅16 ∅12 ∅12 ∅16 6 6


184.8 B1
3

44+h

103.8+h N2 71+h/cos5.9°N3 70+h N4 33.4 N7 ∅16 ∅10


B3 35.6
100.4

1 ∅12 184.8 B2 Ø10-200 (B3)


114+h N6 17.4 63.6
30+h

23
9.51

Ø16-100 (B2)
85.3

39+h

6
23.6

23.6

58.6 58.6
20 29 26
∅10
20
63.6 35.6 B4 Ø10-200 (B4) PT. ANDIKA PERSADA RAYA
23
10 10 23.6 PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
∅10 ∅10 JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273
L-8
N5 B5
100

BAR TABLE OF SECURITY FENCE BAR TABLE OF FOUNDATION SECURITY FENCE

VOLUME TABLE OF SECURITY FENCE / M VOLUME TABLE OF FOUNDATION SECURITY FENCE / M


DIAMETER LENGHT TOTAL TOTAL TOTAL TOTAL DIAMETER LENGHT TOTAL TOTAL TOTAL TOTAL
CODE CODE
OF IRON OF IRON LENGHT WEIGHT WEIGHT OF IRON OF IRON LENGHT WEIGHT WEIGHT
(cm) (m) (kg) (kg) (cm) (m) (kg) (kg)
N1 BjTU 16 235.8 10 23.58 37.26 B1 BjTU 16 184.8 10 18.48 29.20
53.34
N2 BjTU 16 123.8 5 6.19 9.78 54.22 B2 BjTU 16 152.8 10 15.28 24.14
N3 BjTU 16 90.89 5 4.54 7.18 B3 BjTP 10 35.6 15 5.48 3.38
17.35
REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -
P101

N4 BjTP 12 90 5 4.5 3.99 B4 BjTP 10 35.6 10 3.65 2.25


N5 BjTP 10 100 15 15.0 9.26 22.16 B5 BjTP 10 100 19 19.00 11.72
N6 BjTP 12 134 5 6.7 5.94 CONCRETE K-300 = 0.315 M3; BjTU = 53.34 Kg; BjTP = 17.35 Kg
N7 BjTP 12 33.4 10 3.34 2.97
CONCRETE K-300 = 0.39 M3; BjTU = 54.22 Kg; BjTP = 22.16 Kg

A3

You might also like