DRAWINGS ALBUM
RELOCATION OF ROAD SUKATANI VILLAGE
DK 108+300 - DK 108+600
KABUPATEN BANDUNG BARAT
RELOCATION WORK:
′
ROAD RELOCATION
DESIGN PT. DYACON
″
DRAINAGE
LENGHT=129M
BARRIER
LENGHT=79M
DRAINAGE
LENGHT=382.53M
-
-
- -
-
65
124
87
91
125
88
″
123
127a
127
90
89 128a
128
130
129 129a
133
132
135a
135 134
BOX CULVERT
137 138a
STA.0+130
136
137a
RELOCATION ROAD
138 139a
136a
SUKATANI VILLAGE
139
138a 146a
140
141
146
144
149
144a
149a
i
an
kat
a
uly
Su
m
sa
rta
De
Ke
sa
De
REVISION HISTORY
BARRIER
LENGHT=252M
P101
A3
″
ROAD RELOCATION
DESIGN PT. DYACON
DRAINAGE
LENGHT=129M
DRAINAGE
LENGHT=382.53M
BARRIER
LENGHT=79M
BOX CULVERT
STA.0+130
RELOCATION ROAD
SUKATANI VILLAGE
REVISION HISTORY
BARRIER
LENGHT=252M
P101
A3
TYPICAL 1
CL
TYPICAL 2
REVISION HISTORY
CL
A3
TYPICAL 3
CL
REVISION HISTORY
A3
a
146
a
1 39
a
138
146
a
a
129
128
139
a
127
141
124
128
149
129
140
125
144
a
14 9
132
138
127
a
144
136
3
12
CENTER OF TRACK
DK 108+420 DK 108+440 DK 108+460 DK 108+480
DK 108+320 DK 108+360 DK 108+380 DK 108+400
DK 108+260 DK 108+280
DK 108+240
DK 108+220 DK 108+300 DK 108+340
DK 108+200
DK 108+180
DK 108+160
DK 108+140
Ground Road L
Desain Road CL
REVISION HISTORY
Ground Road R
Desain Road CL PT. ANDIKA PERSADA RAYA
PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273
P101
A3
Desa Kertamulya
Desa Sukatani
Ground Road L
Desain Road CL REVISION HISTORY
Ground Road R
Desain Road CL
P101
A3
REVISION HISTORY
A3
REVISION HISTORY
A3
REVISION HISTORY
A3
REVISION HISTORY
A3
REVISION HISTORY
A3
REVISION HISTORY
A3
REVISION HISTORY
A3
REVISION HISTORY
A3
REVISION HISTORY
A3
Protection fence
Landmark post
36.61 22.29
2.00
Arch revetment slope protection
5.0%
713.55
DIIK 108 +320.00
Protection fence
2.00
Landmark post
1:2.
00
Arch revetment slope protection
5.0% 709.62
696.25
14.65
30.14 21.35
Protection fence
Landmark post
Protection fence
Landmark post
5.0% DIIK 108 +340.00
710.33 2.00
1:2. 5.0%
00
Arch revetment slope protection 708.77
1:2. Left Track Right TrackArch revetment slope protection
00 CL CL
6.00
00
PT. ANDIKA PERSADA RAYA
2.00
5.0% 4.40 4.54 4.90 2.00 1:2. PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
5.0% 5.0%
703.76 5.0% 703.74
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273
696.25
14.64
A3
23.57 19.79
Protection fence
Landmark post
Protection fence
Landmark post
DIIK 108 +359.07
2.00
708.98 Arch revetment slope protection
1:2. 707.74
0 0 Left Track Right Track Arch revetment slope protection
CL CL
2.00 4.40 4.52 4.90 2.00 00
5.0% 5.0% 1:2.
703.74 5.0% 5.0% 703.72
Graded crushed stone, 0.6m
702.37 Group A, B fill materials
702.12 702.35
0.50m crushed stone bedding layer and pile capping
701.22
700.59 700.57
696.22
14.62
19.32 17.50
Protection fence
Landmark post
DIIK 108 +380.31
REVISION HISTORY
Arch revetment slope protection
2.00 Left Track Right Track Arch revetment slope protection
5.0% CL CL
705.68 1:2. 705.50
00 2.00 4.40 4.51 4.86 2.00
5.0% 5.0%
5.0% 0
703.72 5.0% 703.70 1:2.0
Graded crushed stone, 0.6m
PT. ANDIKA PERSADA RAYA
702.33 Group A, B fill materials702.10 702.31 PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
0.50m crushed stone bedding layer and pile capping
701.20 JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273
700.55 700.53
695.20
14.57
A3
9.80 12.66
DIIK 108 +405.00
Protection fence
Protection fence
Landmark post
Landmark post
Left Track Right Track
CL CL
694.18
14.52
Protection fence
12.27 14.78
Landmark post
Protection fence
DIIK 108 +425.00
Landmark post
Left Track Right Track REVISION HISTORY
CL CL
693.16
14.46
A3
10.85 14.84
Protection fence
DIIK 108 +441.81
Landmark post
Protection fence
Landmark post
Left Track Right Track
CL CL
693.14
14.42
10.55 15.33
DIIK 108 +460.56
Protection fence
Protection fence
REVISION HISTORY
Landmark post
Landmark post
CL CL
693.06
17.08
A3
DIIK 108 +480.00
15.05 19.50
Protection fence
Protection fence
Landmark post
Landmark post
Left Track Right Track
CL CL
9.00
691.46
23.25
14.62 19.95
Protection fence
DIIK 108 +495.97
Landmark post
Protection fence
Landmark post
690.96
23.60
A3
14.12 19.48
Protection fence
DIIK 108 +520.64
Landmark post
Protection fence
Landmark post
Left Track Right Track
CL CL
689.36
25.19
Protection fence
Landmark post
Landmark post
Left Track Right Track
CL CL
10.00
689.36
24.48
A3
14.87 21.20
DIIK 108 +568.92
Protection fence
Landmark post
Left Track Right Track
CL CL
Protection fence
4.40 4.41 4.54
Landmark post
Arch revetment slope protection 703.53 5.0% 5.0% 703.52 Arch revetment slope protection
Graded crushed stone, 0.6m
Bilateral geogrid 5 1:1. Bilateral geogrid
:1.7 1 Group A, B fill materials 75
2.00
5.0% 700.26
699.61
700.27 0.50m crushed stone bedding layer and pile capping 1.00
1.50 699.36 5.0%
698.46
12.00
DIIK108+551.30 culvert
DIIK108+551.30 culvert
687.36
26.26
13.95 20.88
DIIK 108 +585.00
Protection fence
CL CL
Protection fence
4.40 4.41 4.51
Landmark post
Bilateral geogrid
Arch revetment slope protection703.52 5.0% 5.0% 703.51 Arch revetment slope protection
Graded crushed stone, 0.6m REVISION HISTORY
75 1:1. Bilateral geogrid
2.00 1:1. Group A and Group B soil,1.9m 75
5.0% 1.00
Group A, B or C fill materials 700.26
700.13 700.32 0.50m crushed stone bedding layer and pile capping 5.0%
699.36
698.50
PT. ANDIKA PERSADA RAYA
PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273
13.00
686.36
25.59
REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -
P101
A3
″
a
146
a
a
139
138
146
a
a
129
128
139
a
127
141
124
128
149
129
140
125
144
a
149
132
138
127
a
144
136
3
12
134
65
130
REVISION HISTORY
a
138
87
133
137
a
136
88
135
89
a
137
a
P101
A3
Desa Kertamulya
Desa Sukatani
REVISION HISTORY
P101
A3
B
SECTION - B
SCALE 1 : 50
REVISION HISTORY
DETAIL OF PARAPET
PT. ANDIKA PERSADA RAYA
PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273
SECTION - A
REBAR CAGE CONFIGURATION BRIDGE #46 DK134 -
P101
SCALE 1 : 50
A3
SECURITY FENCE STANDARDS
5
15Ø10 (N5)
Ø16-100 (N1)
N1
Ø12-100 (N7)
PAGAR PENGAMAN
4
Ø12-200 (N4) Ø16-200 (N3)
3
2
PONDASI 6
14.5
15.6
10
REVISION HISTORY
20.5
45
10
235.8 N1
23.
44+h
23
9.51
Ø16-100 (B2)
85.3
39+h
6
23.6
23.6
58.6 58.6
20 29 26
∅10
20
63.6 35.6 B4 Ø10-200 (B4) PT. ANDIKA PERSADA RAYA
23
10 10 23.6 PLANNING, MAPPING, DESIGN, SUPERVISOR, MANAGEMENT
∅10 ∅10 JL. PUALAM NO. 9A BUAHBATU - BANDUNG TELP 022.7320273
L-8
N5 B5
100
A3