Project : CONSTRUCTION OF ABUSAG BRIDGE,APPROACHES & DETOURS

Location : Baggao, Cagayan

RECTIFICATION WORKS FOR COMPLETED STRUCTURES

No. Date Issued Items Decription Location Category Status Date Rectified

Finishing of rough areas at the termination of


1 Feb. 5, 2021 Abutment A B OPEN
column and coping beam.

For Skim application for some rough areas of


2 Feb. 5, 2021 Abutment A B OPEN
abutment A column

Finishing of rough areas at the termination of


3 Feb. 5, 2021 Pier 1 B OPEN
column and coping beam.

For Skim application for some rough areas of


4 Feb. 5, 2021 Pier 1 B OPEN
pier column

Finishing of rough areas at the termination of


5 Feb. 5, 2021 Pier 2 B OPEN
column and coping beam.

For Skim application for some rough areas of


6 Feb. 5, 2021 Pier 2 B OPEN
pier column

Finishing of rough areas at the termination of


7 Feb. 5, 2021 Pier 3 B OPEN
column and coping beam.

For Skim application for some rough areas of


8 Feb. 5, 2021 Pier3 B OPEN
pier column

Finishing of rough areas at the termination of


9 Feb. 5, 2021 Pier 4 B OPEN
column and coping beam.

For Skim application for some rough areas of


10 Feb. 5, 2021 Pier 4 B OPEN
pier column

Finishing of rough areas at the termination of


11 Feb. 5, 2021 Pier 5 B OPEN
column and coping beam.

For Skim application for some rough areas of


12 Feb. 5, 2021 Pier 5 B OPEN
pier column

Finishing of rough areas at the termination of


13 Feb. 5, 2021 Pier 6 B OPEN
column and coping beam.

For Skim application for some rough areas of


14 Feb. 5, 2021 Pier 6 B OPEN
pier column

Finishing of rough areas at the termination of


15 Feb. 5, 2021 Pier 7 B OPEN
column and coping beam.

For Skim application for some rough areas of


16 Feb. 5, 2021 Pier 7 B OPEN
pier column

Finishing of rough areas at the termination of


17 Feb. 5, 2021 Pier 8 B OPEN
column and coping beam.

For Skim application for some rough areas of


18 Feb. 5, 2021 Pier 8 B OPEN
pier column

Finishing of rough areas at the termination of


19 Feb. 5, 2021 Pier 9 B OPEN
column and coping beam.

For Skim application for some rough areas of


20 Feb. 5, 2021 Pier 9 B OPEN
pier column

Finishing of rough areas at the termination of


21 Feb. 5, 2021 Pier 10 B OPEN
column and coping beam.

For Skim application for some rough areas of


22 Feb. 5, 2021 Pier 10 B OPEN
pier column
Project : CONSTRUCTION OF ABUSAG BRIDGE,APPROACHES & DETOURS
Location : Baggao, Cagayan

RECTIFICATION WORKS FOR COMPLETED STRUCTURES

No. Date Issued Items Decription Location Category Status Date Rectified

Finishing of rough areas at the termination of


23 Feb. 5, 2021 Pier 11 B OPEN
column and coping beam.

For Skim application for some rough areas of


24 Feb. 5, 2021 Pier 11 B OPEN
pier column

Finishing of rough areas at the termination of


25 Feb. 5, 2021 Pier 12 B OPEN
column and coping beam.
LEGEND
For Skim application
* Worksfor someaboved
decribe rough was
areas of
categorized depending
26 Feb. 5, 2021 Pier 12on its priority B OPEN
pier column level as follows:
A - signifies HIGH priority level
27Prepared By2021 Finishing of rough
Feb. 5,
areas at
B - signifies the termination
MEDIUM
Checked By of
priority level Noted
Pier By
13 B OPEN
column and coping beam.LOW priority level
C - signifies
JUNE KRISTIAN ESICO JAY MAR ISORENA
QC For Skim application for some rough areas of
28 Feb. 5,Engineer
2021 Materials Engineer Pier 13
Operation's B
Representative OPEN
pier column

Finishing of rough areas at the termination of


29 Feb. 5, 2021 Pier 14 B OPEN
column and coping beam.

For Skim application for some rough areas of


30 Feb. 5, 2021 Pier 14 B OPEN
pier column

Finishing of rough areas at the termination of


31 Feb. 5, 2021 Pier 15 B OPEN
column and coping beam.

For Skim application for some rough areas of


32 Feb. 5, 2021 Pier 15 B OPEN
pier column

Finishing of rough areas at the termination of


33 Feb. 5, 2021 Pier 16 B OPEN
column and coping beam.

For Skim application for some rough areas of


34 Feb. 5, 2021 Pier 16 B OPEN
pier column

Finishing of rough areas at the termination of


35 Feb. 5, 2021 Abutment B B OPEN
column and coping beam.

For Skim application for some rough areas of


36 Feb. 5, 2021 Abutment B B OPEN
pier column

Removal of excessive or overflowed mortar on


37 Feb. 5, 2021 along Alignment B B OPEN
the exposed side of stone masonry works

Chipping and fixing of dimension of intermediate


38 Feb. 5, 2021 Pier B OPEN
diaphragm

39 Feb. 5, 2021 Cutting of excees length GI Pipe Drain Pier 6 (Sidewalk) B OPEN
Remarks
Remarks

For repair of
some minor
spalls

For repair of
some minor
spalls

This covers all


throughout
stone
masonry.
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao,
Date : Cagayan
February 05, 2021

The following are the Descriptioned items on the completed structures that is subject for rectification.

Description Finishing of rough areas at the


termination of column and coping
beam.

Location Pier Abutment A


1 Remarks :

Description For Skim application for some rough


areas of abutment A column
Location Pier Abutment A
Remarks :

Description Finishing of rough areas at the


termination of column and coping
beam.

Location Pier 1
3 Remarks :

Description For Skim application for some rough


areas of pier column

Location Pier 1
Remarks :
4

Description Finishing of rough areas at the


termination of column and coping
beam.
Location Pier 2
Remarks :
5

Description For Skim application for some rough


areas of pier column
Location Pier 2

Remarks :
6
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao,
Date : Cagayan
February 05, 2021

The following are the Descriptioned items on the completed structures that is subject for rectification.

Description Finishing of rough areas at the


termination of column and coping
beam.
Location Pier 3
Remarks :
7

Description For Skim application for some rough


areas of pier column

Location Pier 3
Remarks :
8

Description Finishing of rough areas at the


termination of column and coping
beam.
Location Pier 4
Remarks :
9

Description For Skim application for some rough


areas of pier column
Location Pier 4

Remarks :
10

Description Finishing of rough areas at the


termination of column and coping
beam.

Location Pier 5
11
Remarks :

Description For Skim application for some rough


areas of pier column
Location Pier 5

Remarks :
12
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao,
Date : Cagayan
February 05, 2021

The following are the Descriptioned items on the completed structures that is subject for rectification.

Description Finishing of rough areas at the


termination of column and coping
beam.
Location Pier 6

13 Remarks :

Description For Skim application for some rough


areas of pier column
Location Pier 6

Remarks :
14

Description Finishing of rough areas at the


termination of column and coping
beam.
Location Pier 7

15 Remarks :

Description For Skim application for some rough


areas of pier column
Location Pier 7

Remarks :
16

Description Finishing of rough areas at the


termination of column and coping
beam.
Location Pier 8

17 Remarks :

Description For Skim application for some rough


areas of pier column

Location Pier 8

18 Remarks :
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao,
Date : Cagayan
February 05, 2021

The following are the Descriptioned items on the completed structures that is subject for rectification.

Description Finishing of rough areas at the


termination of column and coping
beam.
Location Pier 9
19 Remarks :

Description For Skim application for some rough


areas of pier column
Location Pier 9

Remarks :
20

Description Finishing of rough areas at the


termination of column and coping
beam.

Location Pier 10
21
Remarks :

Description For Skim application for some rough


areas of pier column
Location Pier 10

Remarks :
22

Description For Skim application for some rough


areas of pier column

Location Pier 11

Remarks :
23

Description Finishing of rough areas at the


termination of column and coping
beam.

Location Pier 11

24 Remarks :
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao,
Date : Cagayan
February 05, 2021

The following are the Descriptioned items on the completed structures that is subject for rectification.

Description Finishing of rough areas at the


termination of column and coping
beam.
Location Pier 12
25

Description For Skim application for some rough


areas of pier column
Location Pier 12

26 Remarks :

Description Finishing of rough areas at the


termination of column and coping
beam.
Location Pier 13
27

Description For Skim application for some rough


areas of pier column
Location Pier 13

28 Remarks :

Description Finishing of rough areas at the


termination of column and coping
beam.

Location Pier 14
29

Description For Skim application for some rough


areas of pier column
Location Pier 14

Remarks : For repair of some minor spalls


30
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao,
Date : Cagayan
February 05, 2021

The following are the Descriptioned items on the completed structures that is subject for rectification.

Description Finishing of rough areas at the


termination of column and coping
beam.
Location Pier 15

31 Remarks:

Description For Skim application for some rough


areas of pier column
Location Pier 15

Remarks : For repair of some minor spalls


32

Description Finishing of rough areas at the


termination of column and coping
beam.
Location Pier 16
33 Remarks:

Description For Skim application for some rough


areas of pier column
Location Pier 16

Remarks :
34

Description Finishing of rough areas at the


termination of column and coping
beam.

Location Abutment B
35

Description For Skim application for some rough


areas of pier column

Location Abutment B

36 Remarks :
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin -
Sta. Margarita Road
Location : Baggao,
Date : Cagayan
February 05, 2021

The following are the Descriptioned items on the completed structures that is subject for rectification.

Description Removal of excessive or overflowed


mortar on the exposed side of stone
masonry works

Location along Alignment B


37 Remarks: This covers all throughout stone
masonry.

Description Chipping and fixing of dimension of


intermediate diaphragm
Location Pier

Remarks :
38

Description Cutting of excees length GI Pipe


Drain
Location on Sidewalk near Pier 6

Remarks :
39

Prepared by Checked by Verified by

JUNE KRISTIAN ESICO JAY MAR ISORENA


QC Engineer Materials Engineer Operations Representative
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Construction of Abusag Bridge, Approaches and Detours

Project Start Date 2/1/2021 (Monday) Display Week 1 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8
1 Feb 2021 8 Feb 2021 15 Feb 2021 22 Feb 2021 1 Mar 2021 8 Mar 2021 15 Mar 2021 22 Mar 2021
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

%
WBS TASK LEAD START END DAYS M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
DONE

1 Abutment A -
1.1 Scaffolding Erection Mon 2/01/21 Mon 2/01/21 1 0%
Column Piers and Corbel
q10 Tue 2/02/21 Tue 2/02/21 1 0%
Repair
0.1 Skim Coating Application Wed 2/03/21 Wed 2/03/21 1 0%

0.2 Scaffolding Dismantling Thu 2/04/21 Thu 2/04/21 1 0%

1 Pier 1 -
1.1 Scaffolding Erection Thu 2/04/21 Thu 2/04/21 1 0%
Column Piers and Corbel
1.2 Wed 2/03/21 Thu 2/04/21 2 0%
Repair
1.3 Skim Coating Application Fri 2/05/21 Fri 2/05/21 1 0%

1.4 Scaffolding Dismantling Sat 2/06/21 Sat 2/06/21 1 0%


2 Pier 2 -
2.1 Scaffolding Erection Sat 2/06/21 Sat 2/06/21 1 0%
Column Piers and Corbel
2.2 Fri 2/05/21 Sat 2/06/21 2 0%
Repair
2.3 Skim Coating Application Sun 2/07/21 Sun 2/07/21 1 0%

2.4 Scaffolding Dismantling Mon 2/08/21 Mon 2/08/21 1 0%

3 Pier 3 -
3.1 Scaffolding Erection Mon 2/08/21 Mon 2/08/21 1 0%
Column Piers and Corbel
3.2 Sun 2/07/21 Mon 2/08/21 2 0%
Repair
3.3 Skim Coating Application Tue 2/09/21 Tue 2/09/21 1 0%

3.4 Scaffolding Dismantling Wed 2/10/21 Wed 2/10/21 1 0%

4 Pier 4 -
4.1 Scaffolding Erection Wed 2/10/21 Wed 2/10/21 1 0%
Column Piers and Corbel
4.2 Tue 2/09/21 Wed 2/10/21 2 0%
Repair
4.3 Skim Coating Application Thu 2/11/21 Thu 2/11/21 1 0%

4.4 Scaffolding Dismantling Fri 2/12/21 Fri 2/12/21 1 0%

5 Pier 5 -
5.1 Scaffolding Erection Fri 2/12/21 Fri 2/12/21 1 0%
Column Piers and Corbel
5.2 Thu 2/11/21 Fri 2/12/21 2 0%
Repair
5.3 Skim Coating Application Sat 2/13/21 Sat 2/13/21 1 0%

5.4 Scaffolding Dismantling Sun 2/14/21 Sun 2/14/21 1 0%

6 Pier 6 -
6.1 Scaffolding Erection Sun 2/14/21 Sun 2/14/21 1 0%
Column Piers and Corbel
6.2 Sat 2/13/21 Sun 2/14/21 2 0%
Repair
6.3 Skim Coating Application Mon 2/15/21 Mon 2/15/21 1 0%

6.4 Scaffolding Dismantling Tue 2/16/21 Tue 2/16/21 1 0%


RECTIFICATION WORKS OF COMPLETED STRUCTURES
Construction of Abusag Bridge, Approaches and Detours

Project Start Date 2/1/2021 (Monday) Display Week 1 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8
1 Feb 2021 8 Feb 2021 15 Feb 2021 22 Feb 2021 1 Mar 2021 8 Mar 2021 15 Mar 2021 22 Mar 2021
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

%
WBS TASK LEAD START END DAYS M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
DONE

7 Pier 7 -
7.1 Scaffolding Erection Tue 2/16/21 Tue 2/16/21 1 0%
Column Piers and Corbel
7.2 Mon 2/15/21 Tue 2/16/21 2 0%
Repair
7.3 Skim Coating Application Wed 2/17/21 Wed 2/17/21 1 0%

7.4 Scaffolding Dismantling Thu 2/18/21 Thu 2/18/21 1 0%

8 Pier 8 -
8.1 Scaffolding Erection Thu 2/18/21 Thu 2/18/21 1 0%
Column Piers and Corbel
8.2 Wed 2/17/21 Thu 2/18/21 2 0%
Repair
8.3 Skim Coating Application Fri 2/19/21 Fri 2/19/21 1 0%

8.4 Scaffolding Dismantling Sat 2/20/21 Sat 2/20/21 1 0%


9 Pier 9 -
9.1 Scaffolding Erection Sat 2/20/21 Sat 2/20/21 1 0%
Column Piers and Corbel
9.2 Fri 2/19/21 Sat 2/20/21 2 0%
Repair
9.3 Skim Coating Application Sun 2/21/21 Sun 2/21/21 1 0%

9.4 Scaffolding Dismantling Mon 2/22/21 Mon 2/22/21 1 0%

10 Pier 10 -
10.1 Scaffolding Erection Mon 2/22/21 Mon 2/22/21 1 0%
Column Piers and Corbel
10.2 Sun 2/21/21 Tue 2/23/21 3 0%
Repair
10.3 Skim Coating Application Wed 2/24/21 Wed 2/24/21 1 0%

10.4 Scaffolding Dismantling Thu 2/25/21 Thu 2/25/21 1 0%

11 Pier 11 -
11.1 Scaffolding Erection Sun 3/07/21 Sun 3/07/21 1 0%
Column Piers and Corbel
11.2 Sat 3/06/21 Sun 3/07/21 2 0%
Repair
11.3 Skim Coating Application Mon 3/08/21 Mon 3/08/21 1 0%

11.4 Scaffolding Dismantling Tue 3/09/21 Tue 3/09/21 1 0%

12 Pier 12 -
12.1 Scaffolding Erection Tue 3/09/21 Tue 3/09/21 1 0%
Column Piers and Corbel
12.2 Mon 3/08/21 Tue 3/09/21 2 0%
Repair
12.3 Skim Coating Application Wed 3/10/21 Wed 3/10/21 1 0%

12.4 Scaffolding Dismantling Thu 3/11/21 Thu 3/11/21 1 0%

13 Pier 13 -
13.1 Scaffolding Erection Thu 3/11/21 Thu 3/11/21 1 0%
Column Piers and Corbel
13.2 Wed 3/10/21 Thu 3/11/21 2 0%
Repair
13.3 Skim Coating Application Fri 3/12/21 Fri 3/12/21 1 0%

13.4 Scaffolding Dismantling Sat 3/13/21 Sat 3/13/21 1 0%


RECTIFICATION WORKS OF COMPLETED STRUCTURES
Construction of Abusag Bridge, Approaches and Detours

Project Start Date 2/1/2021 (Monday) Display Week 1 Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8
1 Feb 2021 8 Feb 2021 15 Feb 2021 22 Feb 2021 1 Mar 2021 8 Mar 2021 15 Mar 2021 22 Mar 2021
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

%
WBS TASK LEAD START END DAYS M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
DONE

14 Pier 14 -
14.1 Scaffolding Erection Thu 2/25/21 Thu 2/25/21 1 0%
Column Piers and Corbel
14.2 Wed 2/24/21 Fri 2/26/21 3 0%
Repair
14.3 Skim Coating Application Sat 2/27/21 Sat 2/27/21 1 0%

14.4 Scaffolding Dismantling Sun 2/28/21 Sun 2/28/21 1 0%

15 Pier 15 -
15.1 Scaffolding Erection Sun 2/28/21 Sun 2/28/21 1 0%
Column Piers and Corbel
15.2 Sat 2/27/21 Sun 2/28/21 2 0%
Repair
15.3 Skim Coating Application Mon 3/01/21 Mon 3/01/21 1 0%

15.4 Scaffolding Dismantling Tue 3/02/21 Tue 3/02/21 1 0%


16 Pier 16 -
16.1 Scaffolding Erection Tue 3/02/21 Tue 3/02/21 1 0%
Column Piers and Corbel
16.2 Mon 3/01/21 Wed 3/03/21 3 0%
Repair
16.3 Skim Coating Application Thu 3/04/21 Thu 3/04/21 1 0%

16.4 Scaffolding Dismantling Fri 3/05/21 Fri 3/05/21 1 0%

17 Abutment B -
17.1 Scaffolding Erection Fri 3/05/21 Fri 3/05/21 1 0%
Column Piers and Corbel
17.2 Thu 3/04/21 Fri 3/05/21 2 0%
Repair
17.3 Skim Coating Application Sat 3/06/21 Sat 3/06/21 1 0%

17.4 Scaffolding Dismantling Sun 3/07/21 Sun 3/07/21 1 0%

MANPOWER REQUIREMENT MATERIALS REQUIREMENT EQUIPMENT REQUIREMENTS


Scaffolder 3 nos Scaffoldings 1 lot Chisel 4 pc/s
Mason 2 nos Cement, 40 kg 30 bags Grinding Disk 2 pc/s
Labor 1 nos Washed Sand 1 cu m Brush, 3 in 10 pc/s
Skim Coat 200 pail/s Trowel 2 pc/s
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

The following are the punchlisted items on the completed structures that is subject for rectification.

For Skim application for some rough areas


Pier Abutment A
of Column Pier Abutment A L

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier Abutment A R

For Skim application for some rough areas


Pier 1
of Column Pier 1L
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 1R

For finishing of rough areas at the


termination of coulumn and coping beam.

For Skim application for some rough areas


Pier 2
of Column Pier 2L
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 2R

For finishing of rough areas at the


termination of coulumn and coping beam.

For Skim application for some rough areas


Pier 3
of Column Pier 3L
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 3R

For finishing of rough areas at the


termination of coulumn and coping beam.

For Skim application for some rough areas


Pier 4
of Column Pier 4L
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 4R

For finishing of rough areas at the


termination of coulumn and coping beam.

For Skim application for some rough areas


Pier 5
of Column Pier 5L
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 5R

For finishing of rough areas at the


termination of coulumn and coping beam.

For Skim application for some rough areas


Pier 6
of Column Pier 6L
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 6R

For finishing of rough areas at the


termination of coulumn and coping beam.

For Skim application for some rough areas


Pier 7
of Column Pier 7L
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 7R

For finishing of rough areas at the


termination of coulumn and coping beam.

For Skim application for some rough areas


Pier 8
of Column Pier 8L
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 8R

For finishing of rough areas at the


termination of coulumn and coping beam.

For Skim application for some rough areas


Pier 9
of Column Pier 9L
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 9R

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 9R

For repair of some minor spalls and skim


Pier 10 coating application for smooth finishes at
Pier 10L
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For repair of some minor spalls and skim


For finishing of rough areas at the
coating application for smooth finishes at
termination of coulumn and coping beam.
Pier 10R

For repair of some minor spalls and skim


For finishing of rough areas at the
coating application for smooth finishes at
termination of coulumn and coping beam.
Pier 10R

For Skim application for some rough areas


Pier 11
of Column Pier 11L
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For Skim application for some rough areas


of Column Pier 11R

For Skim application for some rough areas


Pier 12
of Column Pier 12L

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 12R
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the


termination of coulumn and coping beam.

For Skim application for some rough areas


Pier 13
of Column Pier 13L

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 13R
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the


termination of coulumn and coping beam.

For repair of some minor spalls and skim


Pier 14 coating application for smooth finishes at
Pier 14L

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 14R
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the


termination of coulumn and coping beam.

For repair of some minor spalls and skim


Pier 15 coating application for smooth finishes at
Pier 15L

For repair of some minor spalls and skim


For finishing of rough areas at the
coating application for smooth finishes at
termination of coulumn and coping beam.
Pier 15L
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For Skim application for some rough areas For finishing of rough areas at the
of Column Pier 15R termination of coulumn and coping beam.

For Skim application for some rough areas


Pier 16
of Column Pier 16L

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier 16R
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the


termination of coulumn and coping beam.

For Skim application for some rough areas


Pier Abutment B
of Column Pier Abutment BL

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier Abutment BR
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the


termination of coulumn and coping beam.

Removal of excessive or overflowed mortar Removal of excessive or overflowed mortar


on the exposed side of stone masonry on the exposed side of stone masonry
works. works

Chipping and fixing of dimension of


intermediate diaphragm
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

For finishing of rough areas at the For Skim application for some rough areas
termination of coulumn and coping beam. of Column Pier Abutment BR
RECTIFICATION WORKS OF COMPLETED STRUCTURES
Project : 18B00053: Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program:
Replacement of Permanent Weak Bridges - Abusag Bridge (B04258LZ) along Baybayog - Baggao - Dalin
- Sta. Margarita Road
Location : Baggao, Cagayan

Prepared By: Checked and Verified by:

ANALYN R. BUSCAS JAY MAR T. ISORENA


Laboratory Technician Materials Engineer