FIR No:

Bureau Veritas FIELD INSPECTION REPORT JSL/KAN/OGC/92091/FIR/148


(India) Private Limited
BVIL REF: IND.A.4.20.0177 R1 BVIL Date: 10/01/2021

Project: South Grid Debottlenecking Phase II Project Manufacturer: M/s. Jindal Saw Ltd.
Supply Intended For: OQ Gas Network (OGC) Order No/ LOA No: OGC-21-2019-LOA-92091
Inspection Ordered By: M/s. Jindal Saw Ltd. Place with: OQ Gas Network (OGC) to Jindal Saw Ltd.
Supplier: M/s. Jindal Saw Ltd. Supply / Item: Bare LSAW Pipes
Performing Office (PO): BV – Gandhidham Contracting Office (CO): BV – Ahmedabad
Drawing No: -N.A.- Rev.: -N.A.- ITP No. : Q-OGC-2020S Rev. : C Dated : 03/07/2020

A] Measuring Instruments Used (including satisfactory verification of suitability)


 Please refer Plant Calibration Record Report No. JSLM/ICR/J1/21/0002 Rev.0 Dated 03.01.2021
 Please refer Lab Calibration Record Report No. JSLM/LAB/CALIBRATION LIST/2021/02 Rev.0 Dated 08.01.2021

Quantity Offered: Quantity Accepted: Quantity Rejected:


As per “Today’s Qty” of Table – 1 As per “Today’s Qty” of Table – 1 Nil

TABLE – 1: LOA Status (Cumulative Qty is accepted qty from Final Visual & Dimensional Inspection)
Ordered
Ordered Previous Today’s Cumulative Balance
Qty
Qty Qty Qty Qty Qty
combined
Sr. %
Item Description In
No. In Meters In Meters Completed
In In Meters
(No's of (No's of In Meters
Meters Meters (No's of
Pipe) Pipe)
Pipe)
PART 36" Pipe, 22.23mm WT, API 5L
24 24 0.000 0.000 0.000 24.000 0.00%
A/014 Gr. X65MS / L450MS, PSL2, SAWL
PART 32" Pipe, 22.23mm WT, API 5L
48 48 0.000 0.000 0.000 48.000 0.00%
A/016 Gr. X65MS / L450MS, PSL2, SAWL

TABLE – 2: Production Status of Item mentioned in Table – 1 (36” OD X 22.23 MM WT)


Inspection Stage Previous Qty Today’s Qty Cumulative Qty
Plates Received at Plant 10 8 18
Plate Auto UT 8 8 16
Pipe Forming 6 0 6
Tack Welding 6 0 6
ID Welding 6 0 6
OD Welding 6 0 6
Cold Expansion 5 0 5
Hydro Test 5 0 0
Magnetic Particle Inspection 5 0 0
Final Auto Weld UT 5 0 0
End X-Ray 5 0 0
Repair Required 5 0 0
Repair Pipe Accepted 5 0 0
Pipes Accepted from Final Visual & Dimensional Inspection (No’s of Pipe) 3 0 3
Pipes Accepted from Final Visual & Dimensional Inspection (Meters) 37.395 0.000 37.395
Pipes Released (No’s of Pipe) 0 0 0
Pipes Released (Meters) 0.000 0.000 0.000
Pipe Rejected (No's of Pipe) 0 0 0

B] Details of Inspection Carried out :

For MPQT of Pipe Size: 36” OD X 22.23 MM WT.:-


 Reviewed welding consumables– Found meeting the requirements.
 Witnessed sampling marking for control Tensile and Control Chemical for MPQT Plate.
 Witnessed visual & dimensional inspection of incoming plats as per ITP Sr. No. 2.1 – Found within tolerance.
 Witnessed visual & dimensional inspection of incoming plats before plate ultrasonic testing as per ITP Sr. No. 2.3 –
Found within tolerance.
 Witnessed plate auto UT calibration as per ITP Sr.No. 2.4 – Found satisfactory.
 Witnessed Automatic Ultrasonic testing of Plate as per ITP Sr. No. 2.4 – No significant indications were observed during
test.

Format FIR r5 – 19th Aug 2015 Page 1 of 2


FIR No:
Bureau Veritas FIELD INSPECTION REPORT JSL/KAN/OGC/92091/FIR/148
(India) Private Limited
BVIL REF: IND.A.4.20.0177 R1 BVIL Date: 10/01/2021

B] Details of Inspection Carried out :

Identification: Nil
Remark: Photographs not attached due to USB access not permitted to JSL premises.

Attending Inspectors: Nimesh Patel - Day Shift & Mohit Solanki – Night Shift
Category: (1) Accepted, (2) Conditionally Accepted, (3) Re-Inspection Required, (4) Rejected, (5) Advice / Instruction from Client Required.
Inspection Date(s):
ANY NON Yes
09/01/2021
CONFORMITY
FOUND? No

Complete
Inspection Place(s): ORDER Kaushikkumar Patel
JCO – I, Jindal Saw Ltd, STATUS Supplier’s Signature & Date Date: 10.01.2021
Nanakapaya, Mundra Balance Mobile No. +91-9687000073
Telephone No.
`

Format FIR r5 – 19th Aug 2015 Page 2 of 2