Professional Documents
Culture Documents
Fieldbustutorialpart2 Justifyingfiledbus 101110165259 Phpapp02
Fieldbustutorialpart2 Justifyingfiledbus 101110165259 Phpapp02
Fieldbustutorialpart2 Justifyingfiledbus 101110165259 Phpapp02
Agenda
Process In
Fielbus H1 - two wires
1 14 15 16
Catalyst Tube
1
2
3 Cooling
Fluid In
4
5
6
7 Cooling
Fluid Out
8
Up to 24
wires ! Process Out
Chemical Reactors
[File Name or Event]
Emerson Confidential
27-Jun-01, Slide 5
Reduced Capital and Engineering
Costs
Drawing Cost
– With FOUNDATION fieldbus, one instrument segment
drawing can replace as many as 16 traditional
instrument loop drawings.
Commissioning Cost100
– Checking wiring
– Connecting instruments
– Troubleshooting.
15
256 I/O
4,000
Fieldbus ‘I/O’
Terminator Terminator
Power
Filter
Backup Configurator
LAS Local
Operator Visiting Device
Lowest Permanent Address Interface Addresses: 248 to 255
Power
Filter
Permanent Device Addresses: 17 to 247
Zero This
Transmitter!
24 V DC
Power
Supply Terminators
Power
Conditioner
* Number of instruments
19.7 V / * Weakest signal
* LAS signal
* Voltage
* Noise level
* Peak Noise
[File Name or Event]
Emerson Confidential
27-Jun-01, Slide 18
Device Maintains Statistics For Communication
Diagnostics
To PC
Field Wiring
To DCS
Coax
Field Wiring
Remote I/O Rack
Field Wiring
Terminator To DCS
Field Wiring
PLC w/MMI
DCS w/Fieldbus
DCS w/RI/O
PLC w/MMI
Performance
Security
PLC w/MMI
Phy Installation
Std Powerful
Control, Mon,
Diagnostics
Open
PLC w/MMI
Interoperability
PLC w/MMI