LAPORAN ON THE JOB TRAINING

PT. Lintech Duta Pratama

LAPORAN KEGIATAN MINGGUAN


Nama : Prayoga Afdill Alkarim (0715040046)
: Muhammad Naufal Candra Darmawan (0715040049)
: Ilham Wicaksono (0715040063)
Program Studi : Teknik Pengelasan
Jurusan : Teknik Bangunan Kapal
Waktu : Minggu ke-1 pelaksanaan OJT
Nama Pembimbing : David Ruston ST.

Hari Jam Kegiatan


07.30-08.00 Pengumpulan syarat administrasi
08.00-09.30 Safety Induction
09.30-12.00 Pengenalan dan penempatan workshop
Senin, 10-09-2018
12.00-12.45 Ishoma
13.00-15.00 Pengenalan staf QC
15.30-16.00 Pengenalan staf QC
Selasa,11-09-2018 LIBUR LIBUR
Inspeksi project air duct secondary
07.25-07.30
MHPS
Inspeksi project air duct secondary
07.30-08.00
MHPS
Inspeksi project air duct secondary
08.00-09.00
MHPS
Rabu, 12-09-2018 Inspeksi project air duct secondary
09.30-11.30
MHPS
11.30-12.00 Inspeksi project air duct secondary
MHPS
12.00-12.45 ISHOMA
Inspeksi dimensi project steel
13.00-16.00
structure Frame Conveyor
07.30-08.00 Inspeksi Frame Conveyor
08.00-09.30 Inspeksi Frame Conveyor
09.30-12.00 Inspeksi Frame Conveyor
12.00-12.45 Ishoma
Kamis, 13-09- 12.45-15.00 Inspeksi MT Frame Conveyor
15.00-16.00 Inspeksi dimensi project Frame
2018
Conveyor
LAPORAN ON THE JOB TRAINING
PT. Lintech Duta Pratama

Hari Jam Kegiatan


07.30-08.00 Penetrant Test project Air Duct
Secondary MHPS
08.00-09.30 Visual Test project Air Duct Secondary
Jumat,14-09-2018
MHPS
09.30-11.00 Visual Test project Air Duct Secondary
MHPS
11.00-13.00 Ishoma
13.00-15.00 Inspeksi Visual Test project Frame
Conveyor
15.00-16.00 Inspeksi Visual Test project Frame
Conveyor

Catatan, keterangan, saran, dll.