RFQ and Purchase Order Specification Work Sheets: Twip Assembly

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

RFQ and Purchase Order Section: R406.

014
Date: 11-1-2011
Supersedes: NEW
Specification Work Sheets Page 1

TWIP
Assembly

Please complete all information fields in this worksheet and


submit with your RFQ (Request For Quote) or Purchase Order.
The use of these worksheets has proven to greatly decrease
Engineering time and virtually eliminate specification errors.
Order Specification Sheet for
Section: R406.014
Reliance Turbine Water Date: 11-1-2011
Induction Protection (TWIP) Supersedes: NEW
Page 2
System
Must accompany P.O with all fields
completed

Customer: Contact Name:


Project Name: E-mail:
Project Location: Phone Number:
Date: RFQ/P.O. Number:

TWIP COLUMN REQUIRED INFORMATION


Model No. (See page 2):
Design Pressure:
Design Temperature:

STEAM & WATER CONNS.


(1” MSW Pipe Projection is standard)
Steam & Water Connections (other than standard
– specify size & type Req'd.):
Male Socket Weld
(Pipe Projection):
PROBE REQUIREMENTS
Female Socket Weld:
Quantity Req’d: Z Brazed Type
Flange Size:
“T” Type “FG” Type
Flange Class:
“V” Type F Brazed Type
Flange Face:
“ZG” Type FSB Compression
Other (please
specify): MATERIAL REQUIREMENTS
DRAIN CONN. Carbon Steel:
(1/2” FSW is standard with TWIP Column)
P22 Chrome-Moly
Drain Connection (other than standard – specify
P91 Chrome-Moly
size & type Req'd.):
Type 316 Stainless Steel
Female Socket Weld:
Male Socket Weld OPTIONS REQUIRED
(Pipe Projection):
Flange Size: Integral junction box: NEMA 4 NEMA 4X

Flange Class: Additional probe wire


(specify length required):
Flange Face:
FlexPak Insulation
Other (please specify): Jacket:
Section: R406.014
Date: 11-1-2011
Supersedes: NEW
Page 3
REQUIRED DIMENSIONAL INFORMATION Section: R406.014
Date: 11-1-2011
6 Supersedes: NEW
Page 4
J BODY OVERALL (TO BE CALCULATED AT THE FACTORY)

B
H STEAM AND WATER CENTERS

B
H
5

J -----

1 PROBE TWIP COLUMN


A

1/2" FSW DRAIN


CONNECTION

6
J BODY OVERALL (TO BE CALCULATED AT THE FACTORY)

C
H STEAM AND WATER CENTERS

A
B

B
C
H
A

J -----

2 PROBE TWIP COLUMN


1/2" FSW DRAIN
CONNECTION

DIMENSIONAL NOTES:
1) MINIMUM DISTANCE BETWEEN PROBES IS 1”
2) MINIMUM “A” DIMENSION IS 1”
3) MINIMUM DISTANCE BETWEEN TOP PROBE AND STEAM
CONNECTION (UPPER CONNECTION) IS 1”

Additional notes:
REQUIRED DIMENSIONAL INFORMATION Section: R406.014
Date: 11-1-2011
Supersedes: NEW
Page 5
6

D
G BODY OVERALL (TO BE CALCULATED AT THE FACTORY)

A
F STEAM AND WATER CENTERS

C
C
D
B

H
J -----
A

3 PROBE TWIP COLUMN


1/2" FSW DRAIN
CONNECTION

6
E

A
G BODY OVERALL (TO BE CALCULATED AT THE FACTORY)

B
D
F STEAM AND WATER CENTERS

C
D
C

E
H
B

J -----
A

4 PROBE TWIP COLUMN


1/2" FSW DRAIN
CONNECTION

DIMENSIONAL NOTES:
1) MINIMUM DISTANCE BETWEEN PROBES IS 1”
2) MINIMUM “A” DIMENSION IS 1”
3) MINIMUM DISTANCE BETWEEN TOP PROBE AND STEAM
CONNECTION (UPPER CONNECTION) IS 1”

Additional notes:
REQUIRED DIMENSIONAL INFORMATION Section: R406.014
Date: 11-1-2011
6
Supersedes: NEW
Page 6

F
J BODY OVERALL (TO BE CALCULATED AT THE FACTORY)
B

E
C
H STEAM AND WATER CENTERS

D
E
F

C
H
B

J -----
A

5 PROBE TWIP COLUMN


1/2" FSW DRAIN
CONNECTION

A
G

B
F
J BODY OVERALL (TO BE CALCULATED AT THE FACTORY)

C
H STEAM AND WATER CENTERS

D
E
D

F
C

G
H
B

J -----
A

1/2" FSW DRAIN


CONNECTION
6 PROBE TWIP COLUMN

DIMENSIONAL NOTES:
1) MINIMUM DISTANCE BETWEEN PROBES IS 1”
2) MINIMUM “A” DIMENSION IS 1”
3) MINIMUM DISTANCE BETWEEN TOP PROBE AND STEAM
CONNECTION (UPPER CONNECTION) IS 1”

Additional notes:
Section: R406.014
Date: 11-1-2011
CONTROL UNIT REQUIRED INFORMATION Supersedes: NEW
Page 7

Base Model Number:


No Indicator R#00L
With Indicator ECIL-#R
# = Number of relays required (One relay for each probe)

Power Requirements:
120 VAC
240 VAC
Enclosure Required Environment:
NEMA 1 (Std.) Indoor
Outdoor
NEMA 4 (W’proof)
Hazardous
NEMA 4X (W’proof Area
Stn. Stl.)
NEMA 7 (Ex'proof)
No Enclosure Req’d.
Conduit hubs
Quantity _____ Size ________

Options Required:
Purge System for hazardous areas
Slave Relays for additional Aux. contacts
Voting Logic Package
Dead Band Relays
ECID-66 Intrinsically Safe Barrier for probe circuit
ECID-67 Intrinsically Safe Barrier for indicator circuit

Relay Requirements:
Direct Mode (Std.)
Inverse Mode (Specify Probe Location) ____ ____ ____
Water Conductivity (Normal is 10 – 50 mho) _________
Time Delay (Specify Probe Location) ____ ____ ____ ____
Other Requirements:_________________________________________________
Section: R406.014
Date: 11-1-2011
Supersedes: NEW
Page 8
INDICATOR REQUIRED INFORMATION

Number of Probes/Relays _______


Type of Indicator Required
MTI Miniature LED Indicator (Red Lights only)
MTI Miniature LED Bi-color Indicator (Red/Green Lights)
SMI Sub-miniature LED Bi-color Indicator (Panel Mount)
SMI Sub-miniature LED Bi-color Indicator (Encl. Door Mount)

Environment
Indoor
Outdoor
Hazardous Area

Indicator Options
Wall Mounting Bracket
Weatherproof Enclosure
Weatherproof Enclosure – NEMA 4X Stainless Steel
Conduit hubs
Quantity _____ Size ________
NEMA 7/4 Enclosure for SMI Indicators only
Purge System for hazardous areas

CABLE REQUIREMENTS
Amount Required (only available in lengths of 100, 500, or 1000 feet)
_______ X174882 18 AWG Cable 15 Conductor
_______ X174883 18 AWG Cable 25 Conductor
_______ X174808 18 AWG Shielded Cable 4 Conductor
_______ X174886 16 AWG Cable 19 Conductor (High Temp.)
_______ X174887 16 AWG Cable 4 Conductor (High Temp.)
_______ X174895 16 AWG Cable 9 Conductor (High Temp.)