WEEKLY ACCOMPLISHMENT & WEEKLY PLAN REVISION: (-)

Project : Wampu HEEP


Name : Yan F Sinulingga
Location Work : Office , Main Dam , Intake , Connecting Tunnel, Waterway
NO WORK ITEM COMP. DATE
th th
A. WEEKLY ACCOMPLISHMENT (for the Period of Oct 25 –Oct 31 2014)
th th
1. Compile of Daily Record and Attending concrete strength test in laboratory Oct 25 –Oct 31 2014
th th
2. Review of Documents (Daily Report, Transmittal Letter, Drawing & Material inspection) from/to contractor for approval Oct 25 –Oct 31 2014
th th
3. Monitoring, supervise and coordination to install rebar and formwork until joint Inspection for pouring concrete of Main Dam Oct 25 –Oct 31 2014
th th
4. Monitoring, supervise and coordination to install rebar and formwork until joint Inspection for pouring concrete of Connecting Tunnel Oct 25 –Oct 31 2014
th th
5. Monitoring and supervise and coordination to install rebar, formwork, excavation for final level until joint Inspection for pouring concrete of Oct 25 –Oct 31 2014
Waterway
th th
6. Monitoring and supervise coordination excavation work at intake , checking elevation like following drawing Oct 25 –Oct 31 2014
th th
7. Make daily activity report , weekly report and monthly progress report civil work Oct 25 –Oct 31 2014
8. Checking BOQ (Bill of Quantity) civil work for interim payment
st th
B. WEEKLY PLAN (for the Period of Oct 01 –Oct 6 2014)
st th
1. Compile of Daily Record and Attending concrete strength test in laboratory Oct 01 –Oct 6 2014
st th
2. Review of Documents (Daily Report, Transmittal Letter, Drawing & Material inspection) from/to contractor for approval Oct 01 –Oct 6 2014
st th
3. Monitoring, supervise and coordination to install rebar and formwork until joint Inspection for pouring concrete of Main Dam Oct 01 –Oct 6 2014
st th
4. Monitoring, supervise and coordination to install rebar and formwork until joint Inspection for pouring concrete of Connecting Tunnel Oct 01 –Oct 6 2014
st th
5. Monitoring and supervise and coordination to install rebar, formwork, excavation for final level until joint Inspection for pouring concrete of Oct 01 –Oct 6 2014
Waterway
st th
6. Monitoring and supervise coordination excavation work at intake , checking elevation like following drawing and Install rebar and formwork Oct 01 –Oct 6 2014
st th
7. Make daily activity report , weekly report and monthly progress report civil work Oct 01 –Oct 6 2014

Prepered by :

Yan F Sinulingga

Page 1 of 1

Wampu HEPP (3x15 MW)