EDCVCM DE-BOTTLENECKING PLANT-PR05 Date : 21-Apr-20
EPCL MANUFACTURER
ITEM ACTIVITY ACCEPTANCE CRITERIA VERIFYING DOCUMENTS REMARKS
Status Sign Status Sign
1 DOCUMENTATION
1.1 Drawings Drawings H H
1.2 Welding Procedures Specification,WQT ASME Sec-IX DWGS WPS/PQR R -
1.3 Marking and Cutting Plan As per Drawing - R R
1.4 Material Identification/ Verification & Control of Heat Number Material Test Certificate MTCs H H
2 Material Identification/ Verification & Control of Heat Number PO/ ASME II Part A/ DWGS MTCs H W
2.1 Column As per Drawing Specs. R
2.2 Base Plates As per Drawing Specs. R
2.3 Corner Beams As per Drawing Specs. R
2.4 Mid Beams As per Drawing Specs. R
2.5 Mid Support Beams As per Drawing Specs. R
2.6 Gusset Plates As per Drawing Specs. R
2.7 Bracings of Structure As per Drawing Specs. R
2.8 Internal and External Direct Attachments As per Drawing Specs. R
2.9 Supporting Saddles As per Drawing Specs. R
3 FABRICATION Drawings QIP W H
3.1.1 Marking Inspection Before Cutting of All Parts As per Drawing W H
3.1.2 Cutting of marked parts As per Drawing W H
3.2 MACHINING AND DRILLING As per Dwg.Specifciation QIP/Insp Report W H
3.2.1 Inspection of hole marking before drilling As per Drawing W H
3.2.2 Drilling of Plates / Hole diameter measurement As per Drawing W H
3.2.3 Extra edges flushing and Burr Removal As per Drawing W H
3.3 FIT-UP Drawings QIP H H
3.3.1 Fit-up check of each weld as per Drawing
3.4 WELDING ASME Sec:IX & QIP W R
Dwgs.
3.4.1 Welding of each weld as per WPS
4 FINAL INSPECTION ASME SEC-V,Drawings Inspection & Test Reports H H
4.1 Visual & Dimensional inspection according to last revised drawing H W
4.2 Surface preparation for painting W W
4.3 Painting and DFT as per specifications R R
5 NDE
5.1 100% DPT of all column joints W H
5.2 20% DPT of bracings W H
5.3 100% VT of all Joints W H
ROUTE PREPARED BY REVIEWED BY APPROVED BY
NAME ALTAF KHAN NAUMAN SURIA
SIGNATURE
DATE 24/8/2020 24/8/2020
Legends
H = Hold Point (Mandatory)
M = Monitor
R = Review (Documentation)
W = Witness
IMRAN:file:///conversion/tmp/scratch/515738749.xls
RELEASE OF STRUCTURE MATERIAL FOR Rev. : 0
EDCVCM DE-BOTTLENECKING PLANT-OVR Date : 16-Jun-20
4.3 Painting and DFT as per specifications First Layer coat paint visualy checked
by Engro
IMRAN:file:///conversion/tmp/scratch/515738749.xls
RELEASE OF STRUCTURE MATERIAL FOR Rev. : 0
EDCVCM DE-BOTTLENECKING PLANT-OVR Date : 16-Jun-20
2.3 Painting and DFT as per specifications First Layer coat paint visualy checked