Professional Documents
Culture Documents
03 Rebar Inspection
03 Rebar Inspection
Following the request for inspection, the works as per the above listed items and supportive documents have
been evaluated and permission to proceed is hereby Granted / Refused
Signature
After performing the works the contractor is to report on a daily bases the progress and performance of works.