Civil Engineering
8445/16/49 Design (K) Ltd
CONSULTING ENGINEERS
418% March 2016 ‘Sti Satya Sai Cente,
Musa Gitau Road, Off Wayaki Way
0 Box 4531-00200 Cy Square
Mandeep Singh Construction (K) Ltd, Nairobi — Kenya
P.0 Box 18608-00500, Tek (254)-020- a06st41
Nairobi -Kenya (254) 0718-00476
E-maltinfo@oad.co ke
Attn: Mr Davinder Singh Saimbi
Dear Sir,
KENCHIC PROCES PLANT DEVELOPMENT
COMPLETION OF PENDING WORKS AND SNAG ITEMS
‘We refer to the above contract, practical completion of which was achieved on 30" November
2015
1. schedule of outstanding works/snag items was issued vide email of 17" February 2016
following a joint meeting in our offices on 15th February 2016. Regrettably completion dates
agreed have not been honoured
2. Pursuant to Clause 22.0 of the Conditions of Contract, you are instructed to expeditiously
‘complete the outstanding and snag work items. Note that if within fourteen days of this written
notice you do not comply therewith, then the Employer may employ and pay other persons to
‘execute any work whatsoever which may be necessary to give effect to such instructions. All
costs incurred in connection with such employment shall be recoverable from yourselves by
the Employer as a debt or may be deducted from any money due or to become due to
yourselves under this contract.
3. An updated schedule compiled following our joint inspection of the works on 4" March 2016 is
attached hereto.
4. Your attention is further drawn to the general provisions of Clause 23.0 and in particular clause
23.5 of the Conditions of Contract relating to ‘Specification of Goods, Materials and
‘Workmanship’
All works must be duly supervised to ensure that they are executed in accordance with the
contract.
Yours faithfully,
Hardip Sura
For: Civil Engine
ing Design (K) Ltd
cc Kenchic Ltd
ANE Solutions
‘YMR Partnership
Encl