LARSEN AND TOUBRO LIMITED

MAURITIUS METRO EXPRESS PROJECT


ENGINEERING, PROCUREMENT AND CONSTRUCTION WORKS
Format No.:LT/MLRT/TF-01 Rev No : 00
Employer : Metro Express Limited (MEL)
PMC : RITES
Contractor : Larsen & Toubro Limited
SIEVE ANALYSIS OF SOILS
[As per BS : 1377, Part 2]
Laboratory Job No. : MLRT/LNT/Soil/GSA- Date Sampled : 18/08/2020
Type of Material : Soil+Crusher Run Sampled by : Jointly
: St Jean Stock Pile Soil (80%) +
Source Date Tested : 18/08/2020
Crusher Run (20%)
Location : St Jean Stock Pile Tested by : Jointly
Proposed Use : Structural Backfilling
Blending of Soil & Crusher Run for Structural Backfilling ( 80% & 20% )
Sieve Size Soil Crusher Run
S No Soil 80 mm Ballast % Passing
(mm) 80% 20%
1 75.0 100.00 84.92 80.00 16.98 96.98
2 63.0 100.00 53.63 80.00 10.73 90.73
3 50.0 98.76 31.40 79.01 6.28 85.29
4 37.5 93.94 17.27 75.15 3.45 78.61
5 28.0 90.90 9.35 72.72 1.87 74.59
6 20.0 87.67 7.04 70.14 1.41 71.54
7 14.0 84.45 5.13 67.56 1.03 68.59
8 10.0 82.24 3.86 65.79 0.77 66.56
9 6.3 78.10 2.56 62.48 0.51 62.99
10 5.0 76.54 2.08 61.23 0.42 61.65
11 3.35 74.60 1.77 59.68 0.35 60.03
12 2.0 70.97 1.46 56.78 0.29 57.07
13 1.18 68.38 1.19 54.70 0.24 54.94
14 0.600 63.46 1.03 50.77 0.21 50.97
15 0.425 60.23 0.95 48.18 0.19 48.37
16 0.300 57.77 0.90 46.22 0.18 46.40
17 0.212 54.01 0.78 43.21 0.16 43.36
18 0.150 52.46 0.73 41.97 0.15 42.11
19 0.063 47.92 0.53 38.34 0.11 38.44
Remarks:

For Contractor(L&T) For PMC


Name: Name:
Date: Date:
Signature: Signature:
LARSEN AND TOUBRO LIMITED
MAURITIUS METRO EXPRESS PROJECT
ENGINEERING, PROCUREMENT AND CONSTRUCTION WORKS
Format No.:LT/MLRT/TF-01 Rev No : 00
Employer : Metro Express Limited (MEL)
PMC : RITES
Contractor : Larsen & Toubro Limited
SIEVE ANALYSIS OF SOILS
[As per BS : 1377, Part 2]
Laboratory Job No. : MLRT/LNT/Soil/GSA- Date Sampled : 18/08/2020
Type of Material : Soil+Crusher Run Sampled by : Jointly
: St Jean Stock Pile Soil (80%) +
Source Date Tested : 18/08/2020
Crusher Run (20%)
Location : St Jean Stock Pile Tested by : Jointly
Proposed Use : Structural Backfilling
Blending of Soil & Crusher Run for Structural Backfilling ( 80% & 20% )
Sieve Size Soil Crusher Run
S No Soil 40 mm Ballast % Passing
(mm) 80% 20%
1 75.0 100.00 100.00 80.00 20.00 100.00
2 63.0 100.00 99.01 80.00 19.80 99.80
3 50.0 98.76 78.88 79.01 15.78 94.78
4 37.5 93.94 37.42 75.15 7.48 82.64
5 28.0 90.90 10.53 72.72 2.11 74.83
6 20.0 87.67 1.64 70.14 0.33 70.46
7 14.0 84.45 0.57 67.56 0.11 67.67
8 10.0 82.24 0.47 65.79 0.09 65.89
9 6.3 78.10 0.41 62.48 0.08 62.56
10 5.0 76.54 0.39 61.23 0.08 61.31
11 3.35 74.60 0.38 59.68 0.08 59.76
12 2.0 70.97 0.36 56.78 0.07 56.85
13 1.18 68.38 0.34 54.70 0.07 54.77
14 0.600 63.46 0.32 50.77 0.06 50.83
15 0.425 60.23 0.30 48.18 0.06 48.24
16 0.300 57.77 0.27 46.22 0.05 46.27
17 0.212 54.01 0.24 43.21 0.05 43.26
18 0.150 52.46 0.20 41.97 0.04 42.01
19 0.063 47.92 0.15 38.34 0.03 38.37
Remarks:

For Contractor(L&T) For PMC


Name: Name:
Date: Date:
Signature: Signature: