HSE-ICG/PCJ-3075-CA/JSA.

001
Date:
PetroChina International Jabung Ltd. Job Safety Analysis Tanggal :

Job: Trenching activity Title of person Analyzed by:


who does the job: Operator dan Rigger, Signalman,
Surveyor,

Work Crew Leader


Department : Section: Reviewed by: Approved by:
PT. IndoCipta Gemilang Construction Work Crew Supv: Area Supv: F/S Supv:

Construction Manager

Personal protective equipment (PPE) : Write down correct specifications of personal protective

Put on PPE required for a safe job. equipment required (Consult HSE Dept) :
1. Safety hat / helmet √ 6. Face shield 11. SCBA 16. Safety shoes / boots √
2. Safety glasses √ 7. Ear plugs / muffs 12. Gloves – Ordinary 17. Rubber boots
3. Goggles – ordinary √ 8. Dust mask 13.Gloves - Chemicals 18. Prot. Clothing /
Apron
4. Goggles – tinted 9. Air-purifying respirator 14. Gloves – Thermal 19. Body harnesses, L-
lenses line
5. Goggles – Chemicals 10. Air-line respirator 15. Rubber gloves 20. Life vest
Sequence of Basic Job Steps Potential Hazards Protective Equipment Safe Procedures
1) Team Work & Communication  Misscommunication  Pre – Job safety meeting
 Missunderstanding  Discuss JSA to workers before job
 Failure  Discuss emergency respons preparedness
to workers if emmergency situation
happen
 Good Communication with personel
 Everyone has permission to stop the job
 Melakukan rapat keselamatan sebelum
melakukan pekerjaan
 Kesalahan komunikasi
 Membicarakan JSA kepada pekerja
1) Kerjasama dan Komunikasi  Kesalahpahaman
sebelum bekerja
 Terjadi kegagalan
 Membicarakan tanggap darurat ke pekerja
jika terjadi situasi darurat
2) Prepare Document, Tools and  Pinch Point  Use hand Gloves  Be careful when pick up tools
Equipment  Miss Comunication  Every one must pay attention at all times
 Missunderstanding  Stay focused
 Failure  Ensure tools ready to use
 Ensure all document already accepted
and reviewed by PCI
2) Mempersiapkan dokumen dan alat –  Terjepit  Gunakan Sarung Tangan  Berhati – hati ketika mengambil
alat  Miskomunikasi peralatan
 Kesalahpahaman  Setiap orang harus memperhatikan
Page 1 of 4
 Terjadi Kegagalan pekerjaannya dan lingkungannya setiap
waktu
 Tetap fokus
 Memastikan semua peralatan siap untuk
digunakan
 Memastikan semua dokumen telah
disetujui dan dan ditinjau kembali oleh
pihak PCI
3) Secure area  Unauthorized personel  Barricade tape/safety line  Supervisor must know area for work
 Other activity in the same area  Warning sign  To ensure area safe for work
 Barricade area with tag line and give
warning sign for unauthorized personel
3)Mengamankan area kerja  Personil tidak berkepentingan  Garis barricade  Supervisor harus mengetahui area kerja
 Kegiatan lain di area kerja  Tanda bahaya yang akan dikerjakan
 Memastikan area kerja aman untuk
bekerja
 Barrikade area dengan garis barikade
dan tanda bahaya
4) Unloading material pipe 6” from trailler  Pipe fall  Stopper  Install stopper so the pipe are not lose
by long arm excavator  Sling broke up  Barricade and fall from trailler
 Trailler reversed  Hand gloves  Ensure unauthorized personel do not at
 Pinch by pipe work location
 Make sure sling refer to safe load
 Make sure hand position do not pinch
point
 Make sure position of trailler and
excavator on safe location
 Make sure the material is tied properly
 Ensure unloding pipe 6” is directed by
personel trainned
4) Menurunkan material pipa 6” dari  Kejatuhan material  Stopper  Pasang stopper pada pipa
Trailler menggunakan Long Arm  Sling putus  Barricade  Pastikan tidak ada pekerja yang tidak
Excavator  Terbalik  Sarung tangan berkepentingan
 Terjepit  Pastikan kekuatan sling aman untuk
digunakan dan tidak melebihi beban da
sudah dilakukan inspeksi oleh PCI
 Tangan tidak berada pada titik jepit
 Trailler dan Excavator diposisikan di
tempat aman dan rata dan keras
 Pastikan material terikat dengan benar
 Pastikan penurunan pipa 6” material
diarahkan oleh personel yang terlatih
 Gunakan tug line pada saat unloading

5) Stringging pipe 6” schedule 40 on its  Pinch of pipe  Hand Gloves  Make sure hand position do not under the
Page 2 of 4
psosition  Hit by pipe pipe
 Use wood to blocks to prop
 Wear hand gloves
 Ensure the workers are at safe distance
 Workers unauthorized are not allowed at
the construction area
5) Menempatkan pipa 6“ schedule 40 pada  Terjepit pipa  Sarung tangan  Pastikan posisi tangan tidak di bawah pipa
tempatnya  Tertimpa pipa  Gunakan balok kayu sebagai ganjal
 Gunakan sarung tangan
 Pekerja berada dalam jarak yang aman
 Pekerja yang tidak berkepentingan tidak
diperbolehkan berada di area kerja
 Pastikan tidak ada pekerja yang berada
didaerah line offire kecuali signal man
6) Working at Night  Poor illumination  Use Additional Lamp, Use  Ensure Additional lights are available
Standard PPE (Safety • Ensure availability of drinking water
 Injury person
Helm,safety glasses,coverall, • Ensure replacement of shift workers for
 Tripping night shifts
safety shoes), Enough Rest.
 Animal attack Availability Mineral Water

6) Pekerjan Pada Malam Hari  Penerangan yang buruk  Gunakan Lampu Tambahan,  Pastikan lampu tambahan tersedia
 Orang yang cedera Gunakan PPE standard • Pastikan ketersediaan air minum
 Tersandung (Helm,Kacamata, coverall, • Pastikan penggantian pekerja shift untuk
 Serangan binatang sepatu), istirahat yang cukup, shift malam
Tersedianya Air Mineral

7) Housekeeping  Garbage  Trash bag


 Scratched wood scraps / abrasions  Gloves
 Ensure there is no trash
 Ensure the worker use handgloves
Ensure work area is clean from trash.
Separate organic non-organic and
Dangerous goods waste
 Ensure that no workers are in the off-line
area except signal man

7) Merapikan area kerja  Sampah  Tempat Sampah  Pastikan tidak ada sampah
 Tergores sisa kayu /lecet  Sarung Tangan  Pastikan pekerja menggunakan sarung
tangan
 Pastikan area kerja bersih dari sampah
dan memisahkan sampah organic, non
organic dan B3.
Remarks: