Professional Documents
Culture Documents
Petrochina International Jabung LTD.: Job Safety Analysis
Petrochina International Jabung LTD.: Job Safety Analysis
001
Date:
PetroChina International Jabung Ltd. Job Safety Analysis Tanggal :
Construction Manager
Personal protective equipment (PPE) : Write down correct specifications of personal protective
Put on PPE required for a safe job. equipment required (Consult HSE Dept) :
1. Safety hat / helmet √ 6. Face shield 11. SCBA 16. Safety shoes / boots √
2. Safety glasses √ 7. Ear plugs / muffs 12. Gloves – Ordinary 17. Rubber boots
3. Goggles – ordinary √ 8. Dust mask 13.Gloves - Chemicals 18. Prot. Clothing /
Apron
4. Goggles – tinted 9. Air-purifying respirator 14. Gloves – Thermal 19. Body harnesses, L-
lenses line
5. Goggles – Chemicals 10. Air-line respirator 15. Rubber gloves 20. Life vest
Sequence of Basic Job Steps Potential Hazards Protective Equipment Safe Procedures
1) Team Work & Communication Misscommunication Pre – Job safety meeting
Missunderstanding Discuss JSA to workers before job
Failure Discuss emergency respons preparedness
to workers if emmergency situation
happen
Good Communication with personel
Everyone has permission to stop the job
Melakukan rapat keselamatan sebelum
melakukan pekerjaan
Kesalahan komunikasi
Membicarakan JSA kepada pekerja
1) Kerjasama dan Komunikasi Kesalahpahaman
sebelum bekerja
Terjadi kegagalan
Membicarakan tanggap darurat ke pekerja
jika terjadi situasi darurat
2) Prepare Document, Tools and Pinch Point Use hand Gloves Be careful when pick up tools
Equipment Miss Comunication Every one must pay attention at all times
Missunderstanding Stay focused
Failure Ensure tools ready to use
Ensure all document already accepted
and reviewed by PCI
2) Mempersiapkan dokumen dan alat – Terjepit Gunakan Sarung Tangan Berhati – hati ketika mengambil
alat Miskomunikasi peralatan
Kesalahpahaman Setiap orang harus memperhatikan
Page 1 of 4
Terjadi Kegagalan pekerjaannya dan lingkungannya setiap
waktu
Tetap fokus
Memastikan semua peralatan siap untuk
digunakan
Memastikan semua dokumen telah
disetujui dan dan ditinjau kembali oleh
pihak PCI
3) Secure area Unauthorized personel Barricade tape/safety line Supervisor must know area for work
Other activity in the same area Warning sign To ensure area safe for work
Barricade area with tag line and give
warning sign for unauthorized personel
3)Mengamankan area kerja Personil tidak berkepentingan Garis barricade Supervisor harus mengetahui area kerja
Kegiatan lain di area kerja Tanda bahaya yang akan dikerjakan
Memastikan area kerja aman untuk
bekerja
Barrikade area dengan garis barikade
dan tanda bahaya
4) Unloading material pipe 6” from trailler Pipe fall Stopper Install stopper so the pipe are not lose
by long arm excavator Sling broke up Barricade and fall from trailler
Trailler reversed Hand gloves Ensure unauthorized personel do not at
Pinch by pipe work location
Make sure sling refer to safe load
Make sure hand position do not pinch
point
Make sure position of trailler and
excavator on safe location
Make sure the material is tied properly
Ensure unloding pipe 6” is directed by
personel trainned
4) Menurunkan material pipa 6” dari Kejatuhan material Stopper Pasang stopper pada pipa
Trailler menggunakan Long Arm Sling putus Barricade Pastikan tidak ada pekerja yang tidak
Excavator Terbalik Sarung tangan berkepentingan
Terjepit Pastikan kekuatan sling aman untuk
digunakan dan tidak melebihi beban da
sudah dilakukan inspeksi oleh PCI
Tangan tidak berada pada titik jepit
Trailler dan Excavator diposisikan di
tempat aman dan rata dan keras
Pastikan material terikat dengan benar
Pastikan penurunan pipa 6” material
diarahkan oleh personel yang terlatih
Gunakan tug line pada saat unloading
5) Stringging pipe 6” schedule 40 on its Pinch of pipe Hand Gloves Make sure hand position do not under the
Page 2 of 4
psosition Hit by pipe pipe
Use wood to blocks to prop
Wear hand gloves
Ensure the workers are at safe distance
Workers unauthorized are not allowed at
the construction area
5) Menempatkan pipa 6“ schedule 40 pada Terjepit pipa Sarung tangan Pastikan posisi tangan tidak di bawah pipa
tempatnya Tertimpa pipa Gunakan balok kayu sebagai ganjal
Gunakan sarung tangan
Pekerja berada dalam jarak yang aman
Pekerja yang tidak berkepentingan tidak
diperbolehkan berada di area kerja
Pastikan tidak ada pekerja yang berada
didaerah line offire kecuali signal man
6) Working at Night Poor illumination Use Additional Lamp, Use Ensure Additional lights are available
Standard PPE (Safety • Ensure availability of drinking water
Injury person
Helm,safety glasses,coverall, • Ensure replacement of shift workers for
Tripping night shifts
safety shoes), Enough Rest.
Animal attack Availability Mineral Water
6) Pekerjan Pada Malam Hari Penerangan yang buruk Gunakan Lampu Tambahan, Pastikan lampu tambahan tersedia
Orang yang cedera Gunakan PPE standard • Pastikan ketersediaan air minum
Tersandung (Helm,Kacamata, coverall, • Pastikan penggantian pekerja shift untuk
Serangan binatang sepatu), istirahat yang cukup, shift malam
Tersedianya Air Mineral
7) Merapikan area kerja Sampah Tempat Sampah Pastikan tidak ada sampah
Tergores sisa kayu /lecet Sarung Tangan Pastikan pekerja menggunakan sarung
tangan
Pastikan area kerja bersih dari sampah
dan memisahkan sampah organic, non
organic dan B3.
Remarks:
Page 3 of 4
Page 4 of 4