Professional Documents
Culture Documents
MEMO - May 19 - UHSE - As Build PnID Verification Vs Actual at Site
MEMO - May 19 - UHSE - As Build PnID Verification Vs Actual at Site
MEMO - May 19 - UHSE - As Build PnID Verification Vs Actual at Site
No.: 201905270039
MEMORANDUM
For Your Information [Internal]
Status: Closed
Reference: UHSSE PSD RCI 0678
Date: 24 May 2019
To: See distribution list
From: Joseph Podtung - Datuk (HSE/Upstream)
CC: See distribution list
Subject: Requirement for Asset to verify as-built P&ID as constructed
Dear All,
In a recent fire incident in Upstream, it was found that P&ID was updated, however the latest revision did not capture
certain equipment though it was being operated at location and was captured in previous P&ID revision.
Based on this lesson learnt, Upstream Assets are required to verify that all as-built P&ID drawings are updated exactly as
constructed.
The purpose of the verification is to ensure that similar findings are not repeated and operation team are operating and
maintaining the facilities safely.
All Assets are required to complete the verification by December 2019.
Should you need further clarification, please contact Clista Sintian, Head of Process Safety at clista@petronas.com
Thank you.
Datuk Joseph Podtung
Head, Upstream HSSE
Distribution List
Hasliza Bt Othman (PMO/Upstream)
Head (Peninsular Malaysia)
Mazri B Mohd Ali (SBA/Upstream)
Head (Sabah)
Anuar B Ismail (SKO/Upstream)
Head (Sarawak - Oil)
Morris Ak Mail (SKG/Upstream)
Head (Sarawak - Gas)
To:
M Nazlee B Rasol (PRES/PETH)
Head (Indonesia)
Liau Min Hoe (MO/Upstream)
Head (Myanmar)
Sohaime B Abdullah (IRQ/Upstream)
Head (Garraf)
Ruslan B Abdul Ghani (TO/Upstream)
Head (Turkmenistan)
M Jukris B Wahab (VP_MalAsset/Upstream)
VP (Malaysia Assets)
Bacho B Pilong @ Pelu (VP_IA/Upstream)
VP (International Assets)
Clista Bt Sintian (HSE/Upstream)
Head (Process Safety)
Anneeza Abd Ghani (HSE/Upstream)
Head (PTS - Standards & Performance)
Downloaded on 07 June 2019 12:55:32 PM by Clista Bt Sintian (HSE/Upstream) Page 1 of 2
Edmund Tan Chee Keong (HSE/Upstream)
CC:
Manager (HSE International)
Khairun Najmiah Bt M Salimun (HSE/Upstream)
Manager (HSE Malaysia)
Asziliawati Bt Ramli (GIA/PETH)
Manager (HSE System & Documentation)
M Nazrul B Abu Bakar (HSE/Upstream)
Executive (Site Safety)
Rafedah Bt Md Tap (Fin&Risk/Upstream)
Head, Network Project
This is a computer generated document issued by the authorized users of PETROLIAM NASIONAL BERHAD (PETRONAS)
and requires no signature. Circulation of this document must comply with its security classification; non-compliance is
tantamount to a breach of confidentiality. Should you require further information or assistance, please do not hesitate to
contact the PETRONAS ICT Service Desk at ict.servicedesk@petronas.com or call +60323313333 / 83513333 (PETRONET)
Downloaded on 07 June 2019 12:55:32 PM by Clista Bt Sintian (HSE/Upstream) Page 2 of 2