Professional Documents
Culture Documents
Highway SCH - Metric
Highway SCH - Metric
Highway SCH - Metric
limits)designated places. -
Compaction of natural ground
upto depth of 20 cm
104 NHA
2 (8"inch)below the natural %Sft 177.56 Sq.m 16.5 - -
specifications
ground level compacted upto
90% density modified AASHTO -
Prparing improved sub grade
consisting of 30 cm ( 12"
thick) under sub base with an
approved blended materials
of PI not more than 6% of
uniformally mixed ,compacted 110 NHA
3 %Cft 10223.51 Cum 360.87 - -
to 95% of max: dry density as specifications
per modified AASHTO shall
have CBR value more than 8%.
(Rates i/c all costs of A3
material for blending i/c its
carriage upto 3 miles) -
Earthwork excavation of road 2.1 to 2.4 which ever
side nallies i/c forming its is apllicable
banks or putting the same on
4 embankment as directed clod %0Cft 1437 Cum 50.72 - -
breaking dressing etc
complete.(throw work in
ordinary soil) -
Earthwork for embankment 2.1 to 2.4 which ever
from barrow pits i/c laying in is apllicable
6" layers ,clod
5 %0Cft 2208.37 Cum 78 - -
breaking,ramming,dressing
complete(lead upto 100 ft and
lift upto 5' ft in ordinary soil) -
Earthwork for road 2.1 to 2.4 which ever
embankment by bulldozers i/c is apllicable
ploughing mixing clod
breaking dressing and
6 %0Cft 629.05 -
compacting with optimum
moisture content .lead upto
100 ft and lift upto 5 ft in all
types of soil except rock. -
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
S.No Description Unit Unit Specifications Remarks
Labour Composite Labour Composite
(1) If earthwork is done by
deprtment -
- -
(a)For 95-100% modified 2.1 to 2.4 which ever
AASHO density %0Cft 5627.43 Cum 198.76 is apllicable -
- -
(b)For 90% modified AASHO 2.1 to 2.4 which ever
density %0Cft 4302.31 Cum 151.96 is apllicable -
- -
(c)For 85% modified AASHO 2.1 to 2.4 which ever
density %0Cft 3097.66 Cum 109.41 is apllicable -
- -
(2) If earthwork is done by
other than deprtmental
agency. -
-
(a)For 95-100% modified 2.1 to 2.4 which ever
AASHO density %0Cft 6190.7 Cum 218.64 is apllicable -
- -
(b)For 90% modified AASHO 2.1 to 2.4 which ever
density %0Cft 4732.54 Cum 167.16 is apllicable -
- -
(c)For 85% modified AASHO 2.1 to 2.4 which ever
density %0Cft 3656.23 Cum 129.14 is apllicable -
- -
earthwork compaction by
sheep foot roller and power
roller with optimum moisture -
content.
-
(a)For 95-100% modified 2.1 to 2.4 which ever
AASHO density %0Cft 3975.35 Cum 140.41 is apllicable -
7 -
(b)For 90% modified AASHO 2.1 to 2.4 which ever
density %0Cft 2650.23 Cum 93.61 is apllicable -
-
(c)For 85% modified AASHO 2.1 to 2.4 which ever
density %0Cft 1445.58 Cum 51.06 is apllicable -
-
Extra for every 50 ft additional
lead or part thereof
-
-
(a)For Earthwork in soft 2.1 to 2.4 which ever
8 ordinary of very hard soil is apllicable
%0Cft 100.78 Cum 3.56 -
-
(b)For Earthwork in gravel 2.1 to 2.4 which ever
shingle or rock. %0Cft 105.49 Cum 3.72 is apllicable -
-
Preparing sub grade in cluding
earth excavation or filling to
an average depth of 9"
dressing to camber and 3.1 to 3.4 which ever
9 consolidation with power %Sft 526.28 Sqm 56.66 is apllicable -
roller.
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Excavation in existing berms
for widening the road i/c
preparation of subgrade after
watering rolling dressing the 2.1 to 2.4 which ever
10 excavated stuff,complete. %Sft 526.27 Sqm 56.62 is apllicable -
preparation of subgrade after
watering rolling dressing the 2.1 to 2.4 which ever
10 excavated stuff,complete. %Sft 526.27 Sqm 56.62 is apllicable -
-
(a)Preparing sub base course
by supplying and spreading
stone metal 1-1/2"-2" guage
of approved quality from
approved quarry in required
thickness to prper camber and
grade i/c handpacking filling
voids with 20% pit/canal sand
having plasticity index not
having more than 6% of
suitable quality ,watering and
compacting to achieve 98- 3.1 to 3.4 which ever
11 100% density as per modified %Cft 1257.76 4381.76 Cum 444.44 1548.33 is apllicable -
AASHO specifications(Rates
icludes all cost of materials
T&P and carriage upto 3
chains)
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
(c)Preparing sub base course
by supplying and spreading
stone metal 1-1/2"-2" guage
of approved quality from
approved quarry in required
thickness to prper camber and
grade i/c handpacking filling
voids with 10 cft screening
aand non plastic quarry fines
of approved quality and guage
from approved source
,watering and compacting to
achieve 98-100% density as 3.1 to 3.4 which ever
per modified AASHO %Cft 1257.76 4359.76 Cum 444.44 1540.55 is apllicable -
of approved quality and guage
from approved source
,watering and compacting to
achieve 98-100% density as 3.1 to 3.4 which ever
per modified AASHO %Cft 1257.76 4359.76 Cum 444.44 1540.55 is apllicable -
specifications(Rates icludes all
cost of materials T&P and
carriage upto 3 chains)
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Preparing base course by
supplying and spreading stone
metal 1-1/2" guage of
approved quality from
approved quarry in required
thickness to prper camber and
grade i/c handpacking filling
voids with 15 cft screening
and non plastic quarry fines of
approved quality and guage
from approved source
13 ,watering and compacting to 4.1 to 4.6 which ever
%Cft 1257.76 5252.41 Cum 444.44 1855.98 is apllicable -
(a) achieve 100% density as per
modified AASHO
specifications(Rates icludes all
cost of materials T&P and
carriage upto 3 chains)
carriage upto 3 chains)
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Provding surface dressing Ist
coat on new or existing
surafce with 40 lbs bitmen
and 5.50 cft of crsh bajri of
required size iclding cleaning
the road surface rolling etc
complete.(Rates includes all -
cost of materials T&P and
15 carriage upto 3 chains)
A
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
(a) Using Much bajri 5.1 to 5.60 which ever
%Sft 159.35 1228.2 Sqm 17.14 132.14 is apllicable -
(b) Usiing crush bajri
%Sft 159.35 1211.54 Sqm 17.14 130.34 do -
(c) Using Jharo bajri
%Sft 159.35 1197.17 Sqm 17.14 128.8 do -
Provding surface dressing 2nd
coat on new or existing
surafce with 25 lbs bitmen
and 2.75 cft of crsh bajri of
required size iclding cleaning
the road surface rolling etc
complete.(Rates includes all -
cost of materials T&P and
carriage upto 3 chains)
17
B
18
A
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Providing 1-1/2" thick
premixed consolidated carpet
in proper camber and Grade
including supplying 15 cft bajri
5 cft hillsand of approved
quality and grade ,bitumen of
80/100 penetration including
mixing in mechanical mixer in
required proportion i/c
heating materials and
cleaning the road surface
(Hillsand 3 cft for mixing and 2 -
cft for dusting).(Rates includes
all cost of materials T&P and
19 carriage upto 3 chains)
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
(a) Using Much bajri 5.1 to 5.60 which ever
%Sft 1095.19 4168.4 Sqm 117.83 448.46 is apllicable -
(b) Usiing crush bajri
%Sft 1095.19 4107.84 Sqm 117.83 441.94 do -
(c) Using Jharo bajri
%Sft 1095.19 4055.59 Sqm 117.83 436.32 do -
Providing 3/42" thick
premixed consolidated carpet
in proper camber and Grade
including supplying 7.50 cft
bajri3.50 cft hillsand of
approved quality and grade
,bitumen of 80/100
penetration including mixing
in mechanical mixer in
required proportion i/c
heating materials and
cleaning the road surface -
(Hillsand 3 cft for mixing and 2
cft for dusting).(Rates includes
22 all cost of materials T&P and
carriage upto 3 chains)
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
4"(100 mm) Asphaltic Base Course Plant Mix
Providing and laying plant mix
asphalt concrete binder
course compacted thickness
4" inches (100 mm) as per
approved job mix formuale
using crush aggregates from
approved sources .Using
asphalt of grade 60/70 during
laying temperature not less
than 140C compacted by steel
wheel and PTR roller .The
procedure of laying binder
course materials and
methodology shall fully 203 NHA
comply with AASHTO specifications
23 standards and as directed by
Engineer Incharge .minmum
Note: The quantities
B bitumen content shold be provided in the RAs are
%Sft 3732.47 13758.75 Sqm 401.56 1480.23 for estimationpurpose -
3.5% binder course shall be .The actual quantities
spreading using paver are tobe worked out as
machine .Rolling and finishing per approved JMF.
to design proper grade line
level and camber etc.(Rates
i/c all cost of materials ,POLs
& craiiage upto site)
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Providing premixed patch
repair s 1" thick with
(40+12+15)=67 lbs 10 cft of
bajri and 4 cft hillsand
including cleaning cutting
sacteerted patches in proper
shape laying premixed
chips.rolling etc complete. -
(Rates includes all cost of
materials T&P and carriage
25 upto 3 chains)
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
APPLYING BITUMEMOUS COAT
Applying 2nd coat with
pressure bitumen boiler
binder of approved quality
and penetration at the
required rate including
cleaning the road surface
29 removing the loose materials 5.1 to 5.60 which ever
heating the binder to required %Sft 113.65 - Sqm 12.22 -- is apllicable -
temperature and spreading
chips in required quantity.
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
ROLLING WITH POWER ROLLER
Rolling over earthwork
charges of 10-12 tons road
33 roller. 2.1 to 2.4 which ever
P/hour 822.52 - is apllicable -
MISCELLANOUS
Jungle clearance and
removing within 100 ft
- -
1
(a) THIN JUNGLE -
%0Sft 69.58 %Sqm 74.82
(b) THICK JUNGLE
%0Sft 139.15 %Sqm 149.62
Making and maintaining
diversion during construction
i/c supplying necessary
barriers notice boards with
lighting arrangements and
providing temporary crossing
over the water course where
2 ever necessary so as to be P/mile 90870.89 - P/Km 56476.63 -
good motorable condition
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
S.No Description Unit Unit Specifications Remarks
Labour Composite Labour Composite
Cutting and removing trees
within distances of 100 ft
- - -
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
KERB STONES
Providing and fixing precast
brick edge block 3750 PSI
industrial made sze 6"thick
12" long and 12" high
including the cost of cartaqge
Providing and fixing precast
brick edge block 3750 PSI
industrial made sze 6"thick
12" long and 12" high
including the cost of cartaqge
excavation form work for
14 haunching 1450 PSI lean
concrete 2250 PSI concrete rft - 297.01 Rm 974.19 -
for haunching 1:4 cement
sand mortor.
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Traffic Signs tringular
Providing and fxing traffic sign 3"
dia GI pipe post and sign of
18 equilateral tringle shape each
A side 3' long i/c painting ,marking Each -- 14600 -
as directed each.
Kilometre Post
providing and fixing precast RCC
18 KMs posts i/c foundation
C work,painting and writing as
( II ) directed each. Each -- 5600 -
XTRA LEAD
Extra for every 50 ft additional
lead or a part there of earthwork
19 excavation in gravel shingle or
rock. %0Cft 120.94 -
Cut
earthwork excavation in ashes
21 sand soft or silt clearance
undressed lead upto 50 ft. %0Cft 1663.75 -
Dressing
dressing and levelling of
earthwork to designed section etc %0Cft 1664.75 -
complete.
22 soil
(a) Ashes,sand,silt or soft
%0Cft 96.8 -
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Compaction
earthwork compaction by
rolling(This does not includes the
hire charges of the roller. -
28
(a)Ordinary soil.
%0Cft 2420 -
1211.54
858.82
2070.36
159.35
0
116.95
276.3
1916.41 206.17
906
50.33333333333
0
604
0
7248
82500
498300
Providing and fixing precast brick edge block 3750
PSI industrial made sze 6"thick 12" long and 12"
high including the cost of cartaqge excavation
form work for haunching 1450 PSI lean concrete
2250 PSI concrete for haunching 1:4 cement sand
mortor.
CARRIAGE IN KMS
Bricks
LEAD S/METAL C/Bajri Hillsand 1000 Nos Cement Bitumen
P Cum P Cum P Cum P/Bag P/Bag P/Ton REMARKS
1 Kilomete 89.32 89.32 89.32 202.36 3.79 75.89
2 Kilomete
62.59 62.59 62.59 141.81 2.66 53.17
3 Kilomete 20.96 20.96 20.96 47.48 0.89 17.81
172.87
4 Kilomete 17.77 17.77 17.77 40.24 - -
5 Kilomete
16.63 16.63 16.63 37.68 - -
6 Kilomete 15.46 15.46 15.46 35.04 - -
7 Kilomete
14.71 14.71 14.71 33.3 - -
8 Kilomete
14.17 14.17 14.17 31.97 - -
9 Kilomete
12.72 12.72 12.72 28.82 - -
10 Kilomete
10.75 10.75 10.75 22.29 - -
Total 275.08 275.08 275.08 620.99 7.34 146.87
Subs: 7.15 7.15 7.15 16.19 0.37 6.07
25% Hilly Portion 37.98 - - - - -
89.32 151.91
78
140
307.32
569.88 172.87
151.91
431.89
172.87
391.65
STONE METAL SCREENING SAND CRUSH BAJRI HILLSAND BITUMEN BRICKS Stone Dust
ITEM OF WORK
P Cum P Cum P Cum P Cum P Cum Ton Nos P Cum
Sub Base Course
Qtyx1.33 - Qtyx0.20 - - - - -
with 20 cft Pit/Canal sand
Bricks on Edge - - - - - - Qtyx 13.5 -
Base Course
with 15 cft Screening Qtyx1.33 Qtyx0.15 - - - - - -
First Coat - - - Qtyx0.017 - Qtyx 1.92 Kg - -
(5.5 Cft C/Bajri 40 lbs bitumen) 1000
First Coat Qtyx 1.44 Kg
(4 Cft C/Bajri 30 lbs bitumen) - - - Qtyx0.012 - 1000 - -
0.059 4.66
1-/12 bajri Bitumrn Sand
Two coat asphalt Total First coat 0.012 1.44 0.015
0.030 Bajri 0.013 0.055 0.068 25mm 0.046 4.47
Sand 0.011 0.011 293.92