SCHEDULE OF RATE

VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)


Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Clearing and grubbing the site

by cutting uprooting and

1 removing all rubbish and %Sft 97.07 Sq.m 10.44 - 2.1 -


shrubs i/c disposal to (outside

limits)designated places. -
Compaction of natural ground
upto depth of 20 cm
104 NHA
2 (8"inch)below the natural %Sft 177.56 Sq.m 16.5 - -
specifications
ground level compacted upto
90% density modified AASHTO -
Prparing improved sub grade
consisting of 30 cm ( 12"
thick) under sub base with an
approved blended materials
of PI not more than 6% of
uniformally mixed ,compacted 110 NHA
3 %Cft 10223.51 Cum 360.87 - -
to 95% of max: dry density as specifications
per modified AASHTO shall
have CBR value more than 8%.
(Rates i/c all costs of A3
material for blending i/c its
carriage upto 3 miles) -
Earthwork excavation of road 2.1 to 2.4 which ever
side nallies i/c forming its is apllicable
banks or putting the same on
4 embankment as directed clod %0Cft 1437 Cum 50.72 - -
breaking dressing etc
complete.(throw work in
ordinary soil) -
Earthwork for embankment 2.1 to 2.4 which ever
from barrow pits i/c laying in is apllicable
6" layers ,clod
5 %0Cft 2208.37 Cum 78 - -
breaking,ramming,dressing
complete(lead upto 100 ft and
lift upto 5' ft in ordinary soil) -
Earthwork for road 2.1 to 2.4 which ever
embankment by bulldozers i/c is apllicable
ploughing mixing clod
breaking dressing and
6 %0Cft 629.05 -
compacting with optimum
moisture content .lead upto
100 ft and lift upto 5 ft in all
types of soil except rock. -

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
S.No Description Unit Unit Specifications Remarks
Labour Composite Labour Composite
(1) If earthwork is done by
deprtment -
- -
(a)For 95-100% modified 2.1 to 2.4 which ever
AASHO density %0Cft 5627.43 Cum 198.76 is apllicable -
- -
(b)For 90% modified AASHO 2.1 to 2.4 which ever
density %0Cft 4302.31 Cum 151.96 is apllicable -
- -
(c)For 85% modified AASHO 2.1 to 2.4 which ever
density %0Cft 3097.66 Cum 109.41 is apllicable -
- -
(2) If earthwork is done by
other than deprtmental
agency. -
-
(a)For 95-100% modified 2.1 to 2.4 which ever
AASHO density %0Cft 6190.7 Cum 218.64 is apllicable -
- -
(b)For 90% modified AASHO 2.1 to 2.4 which ever
density %0Cft 4732.54 Cum 167.16 is apllicable -
- -
(c)For 85% modified AASHO 2.1 to 2.4 which ever
density %0Cft 3656.23 Cum 129.14 is apllicable -
- -
earthwork compaction by
sheep foot roller and power
roller with optimum moisture -
content.
-
(a)For 95-100% modified 2.1 to 2.4 which ever
AASHO density %0Cft 3975.35 Cum 140.41 is apllicable -
7 -
(b)For 90% modified AASHO 2.1 to 2.4 which ever
density %0Cft 2650.23 Cum 93.61 is apllicable -
-
(c)For 85% modified AASHO 2.1 to 2.4 which ever
density %0Cft 1445.58 Cum 51.06 is apllicable -
-
Extra for every 50 ft additional
lead or part thereof
-
-
(a)For Earthwork in soft 2.1 to 2.4 which ever
8 ordinary of very hard soil is apllicable
%0Cft 100.78 Cum 3.56 -
-
(b)For Earthwork in gravel 2.1 to 2.4 which ever
shingle or rock. %0Cft 105.49 Cum 3.72 is apllicable -
-
Preparing sub grade in cluding
earth excavation or filling to
an average depth of 9"
dressing to camber and 3.1 to 3.4 which ever
9 consolidation with power %Sft 526.28 Sqm 56.66 is apllicable -
roller.

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Excavation in existing berms
for widening the road i/c
preparation of subgrade after
watering rolling dressing the 2.1 to 2.4 which ever
10 excavated stuff,complete. %Sft 526.27 Sqm 56.62 is apllicable -
preparation of subgrade after
watering rolling dressing the 2.1 to 2.4 which ever
10 excavated stuff,complete. %Sft 526.27 Sqm 56.62 is apllicable -

-
(a)Preparing sub base course
by supplying and spreading
stone metal 1-1/2"-2" guage
of approved quality from
approved quarry in required
thickness to prper camber and
grade i/c handpacking filling
voids with 20% pit/canal sand
having plasticity index not
having more than 6% of
suitable quality ,watering and
compacting to achieve 98- 3.1 to 3.4 which ever
11 100% density as per modified %Cft 1257.76 4381.76 Cum 444.44 1548.33 is apllicable -
AASHO specifications(Rates
icludes all cost of materials
T&P and carriage upto 3
chains)

(b)Preparing sub base course


by supplying and spreading
stone metal 1-1/2"-2" guage
of approved quality from
approved quarry in required
thickness to prper camber and
grade i/c handpacking mixed
with shingle pit run gravel
fines having plasticity index
not having more than 6% of
suitable quality ,watering and
compacting to achieve 98-
100% density as per modified
AASHO specifications(Rates
icludes all cost of materials
T&P and carriage upto 3 3.1 to 3.4 which ever
chains) %Cft 1220.03 3380.43 Cum 431.11 1194.5 is apllicable -

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
(c)Preparing sub base course
by supplying and spreading
stone metal 1-1/2"-2" guage
of approved quality from
approved quarry in required
thickness to prper camber and
grade i/c handpacking filling
voids with 10 cft screening
aand non plastic quarry fines
of approved quality and guage
from approved source
,watering and compacting to
achieve 98-100% density as 3.1 to 3.4 which ever
per modified AASHO %Cft 1257.76 4359.76 Cum 444.44 1540.55 is apllicable -
of approved quality and guage
from approved source
,watering and compacting to
achieve 98-100% density as 3.1 to 3.4 which ever
per modified AASHO %Cft 1257.76 4359.76 Cum 444.44 1540.55 is apllicable -
specifications(Rates icludes all
cost of materials T&P and
carriage upto 3 chains)

(d)Preparing sub base course


by supplying and spreading
well graded pit run gravel
having a liqiud limit not
greater than 25 and plastic
index not greater than 6 from
approved quarry in required
thickness to prper camber and
grade i/c ,watering and
compacting in layers thickness
of each compacted layer not
exceeding 6" to achieve 98-
100% density as per modified 3.1 to 3.4 which ever
AASHO specifications(Rates %Cft 192.5 3341.71 Cum 68.02 1180.82 is apllicable -
icludes all cost of materials
T&P and carriage upto 3
chains)

laying bricks on end edging


including supplying 9"x4-
1/2"x3" first class brcks
excavation for laying edging
with small size parallel to the
3.1 to 3.4 which ever
12 road (Rates icludes all cost of %Rft 282.94 2482.94 Mtrs 10 81.49 is apllicable -
materials upto 3 chains)

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Preparing base course by
supplying and spreading stone
metal 1-1/2" guage of
approved quality from
approved quarry in required
thickness to prper camber and
grade i/c handpacking filling
voids with 15 cft screening
and non plastic quarry fines of
approved quality and guage
from approved source
13 ,watering and compacting to 4.1 to 4.6 which ever
%Cft 1257.76 5252.41 Cum 444.44 1855.98 is apllicable -
(a) achieve 100% density as per
modified AASHO
specifications(Rates icludes all
cost of materials T&P and
carriage upto 3 chains)
carriage upto 3 chains)

Providing and laying


aggreagte base corse in
proper cmaber and grade CBR
80% as per AASHTO standards
specifications,i/c spreading
and compacting by approved
mechancial means (Motor
grader vibratory roller and
smooth wheel roller
etc)wtaering to maintain the
13 moistre content the
%Cft 19.93 5542.24 Cum 7.04 1958.39 202 NHA
-
(b) compaction of each layer shall specifications
100 % to the maximum dry
density .(Rates includes all
costs of materials T&P and
carriage upto 3 chains)

Provding surface dressing Ist


coat on new or existing
surafce with 50 lbs bitmen
and 6 cft of crsh bajri of
required size iclding cleaning
the road surface rolling etc
complete.(Rates includes all -
14 cost of materials T&P and
carriage upto 3 chains)

(a) Using Much bajri 5.1 to 5.60 which ever


%Sft 234.91 2391.99 Sqm 25.27 257.34 is apllicable -
(b) Usiing crush bajri
%Sft 234.91 2355.66 Sqm 25.27 253.43 do -
(c) Using Jharo bajri
%Sft 234.91 2324.31 Sqm 25.27 250.06 do -

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Provding surface dressing Ist
coat on new or existing
surafce with 40 lbs bitmen
and 5.50 cft of crsh bajri of
required size iclding cleaning
the road surface rolling etc
complete.(Rates includes all -
cost of materials T&P and
15 carriage upto 3 chains)
A

(a) Using Much bajri 5.1 to 5.60 which ever


%Sft 234.91 1987.72 Sqm 25.27 213.85 is apllicable -
(b) Usiing crush bajri %Sft 234.91 1954.42 Sqm 25.27 210.27 do -
(c) Using Jharo bajri %Sft 234.91 1925.68 Sqm 25.27 207.17 do -
Provding surface dressing Ist
coat on new or existing
surafce with 40 lbs bitmen
and 5.0 cft of crsh bajri of
required size iclding cleaning
the road surface rolling etc
complete.(Rates includes all -
cost of materials T&P and
and 5.0 cft of crsh bajri of
required size iclding cleaning
the road surface rolling etc
complete.(Rates includes all -
cost of materials T&P and
carriage upto 3 chains)
15
B

(a) Using Much bajri 5.1 to 5.60 which ever


%Sft 234.91 1968.34 Sqm 25.27 211.76 is apllicable -
(b) Usiing crush bajri %Sft 234.91 1938.06 Sqm 25.27 208.51 do -
(c) Using Jharo bajri %Sft 234.91 1911.93 Sqm 25.27 205.69 do -
Provding surface dressing Ist
coat on new or existing
surafce with 30 lbs bitmen
and 4.0 cft of crsh bajri of
required size iclding cleaning
the road surface rolling etc
complete.(Rates includes all -
cost of materials T&P and
carriage upto 3 chains)
16

(a) Using Much bajri 5.1 to 5.60 which ever


%Sft 234.91 1544.67 Sqm 25.27 166.18 is apllicable -
(b) Usiing crush bajri %Sft 234.91 1520.45 Sqm 25.27 163.58 do -
(c) Using Jharo bajri %Sft 234.91 1499.55 Sqm 25.27 161.33 do -
Provding surface dressing 2n
coat on new or existing
surafce with 25 lbs bitmen
and 2.75 cft of crsh bajri of
required size iclding dcleaning
17 the road surface rolling etc
complete.(Rates includes all do -
A cost of materials T&P and
carriage upto 3 chains)

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
(a) Using Much bajri 5.1 to 5.60 which ever
%Sft 159.35 1228.2 Sqm 17.14 132.14 is apllicable -
(b) Usiing crush bajri
%Sft 159.35 1211.54 Sqm 17.14 130.34 do -
(c) Using Jharo bajri
%Sft 159.35 1197.17 Sqm 17.14 128.8 do -
Provding surface dressing 2nd
coat on new or existing
surafce with 25 lbs bitmen
and 2.75 cft of crsh bajri of
required size iclding cleaning
the road surface rolling etc
complete.(Rates includes all -
cost of materials T&P and
carriage upto 3 chains)
17
B

(a) Using Much bajri 5.1 to 5.60 which ever


%Sft 159.35 1257.28 Sqm 17.14 135.26 is apllicable -
(b) Usiing crush bajri
%Sft 159.35 1236.09 Sqm 17.14 132.98 do -
(c) Using Jharo bajri
%Sft 159.35 1217.8 Sqm 17.14 131.02 do -
Provding surface dressing 3rd
coat on new or existing
surafce with 14 lbs bitmen
and 1.50 cft of crsh bajri of
required size iclding cleaning
the road surface rolling etc
surafce with 14 lbs bitmen
and 1.50 cft of crsh bajri of
required size iclding cleaning
the road surface rolling etc
complete.(Rates includes all
cost of materials T&P and -
carriage upto 3 chains)

18
A

(a) Using Much bajri 5.1 to 5.60 which ever


%Sft 116.95 713.95 Sqm 12.58 76.81 is apllicable -
(b) Usiing crush bajri
%Sft 116.95 704.87 Sqm 12.58 75.83 do -
(c) Using Jharo bajri
%Sft 116.95 697.03 Sqm 12.58 74.99 do -
Provding surface dressing 3rd
coat on new or existing
surafce with 18 lbs bitmen
and 1.50 cft of crsh bajri of
required size iclding cleaning
the road surface rolling etc
complete.(Rates includes all -
cost of materials T&P and
carriage upto 3 chains)
18
B

(a) Using Much bajri 5.1 to 5.60 which ever


%Sft 116.95 867.9 Sqm 12.58 93.37 is apllicable -
(b) Usiing crush bajri
%Sft 116.95 858.82 Sqm 12.58 92.4 do -
(c) Using Jharo bajri
%Sft 116.95 850.98 Sqm 12.58 91.55 do -

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Providing 1-1/2" thick
premixed consolidated carpet
in proper camber and Grade
including supplying 15 cft bajri
5 cft hillsand of approved
quality and grade ,bitumen of
80/100 penetration including
mixing in mechanical mixer in
required proportion i/c
heating materials and
cleaning the road surface
(Hillsand 3 cft for mixing and 2 -
cft for dusting).(Rates includes
all cost of materials T&P and
19 carriage upto 3 chains)

(a) Using Much bajri 5.1 to 5.60 which ever


%Sft 1587.6 5582.07 Sqm 170.8 632.82 is apllicable -
(b) Usiing crush bajri
%Sft 1587.6 5791.23 Sqm 170.8 623.05 do -
(c) Using Jharo bajri
%Sft 1587.6 5712.86 Sqm 170.8 614.62 do -
1-1/2" Carpet laying with
Paver machine.Providing and
laying to proper line and
grade 1-1/2" premixed carpet
with paver machine Prepared
to specfied formulae
according to job mix formulae
approved by engineer
incharge including rolling and
20 finishing to proper line and %Sft 4662.57 6488.32 Sqm 480.1 698.04 -
grade llevel and camber etc.
according to job mix formulae
approved by engineer
incharge including rolling and
20 finishing to proper line and %Sft 4662.57 6488.32 Sqm 480.1 698.04 -
grade llevel and camber etc.
(Rates includes all cost of
materials T&P and carriage
upto 3 chains.)

Providing 1" thick premixed


consolidated carpet in proper
camber and Grade including
supplying 10 cft bajri 4 cft
hillsand of approved quality
and grade ,bitumen of 80/100
penetration including mixing
in mechanical mixer in
required proportion i/c
heating materials and
21 cleaning the road surface -
(Hillsand 2 cft for mixing and 2
cft for dusting).(Rates includes
all cost of materials T&P and
carriage upto 3 chains)

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
(a) Using Much bajri 5.1 to 5.60 which ever
%Sft 1095.19 4168.4 Sqm 117.83 448.46 is apllicable -
(b) Usiing crush bajri
%Sft 1095.19 4107.84 Sqm 117.83 441.94 do -
(c) Using Jharo bajri
%Sft 1095.19 4055.59 Sqm 117.83 436.32 do -
Providing 3/42" thick
premixed consolidated carpet
in proper camber and Grade
including supplying 7.50 cft
bajri3.50 cft hillsand of
approved quality and grade
,bitumen of 80/100
penetration including mixing
in mechanical mixer in
required proportion i/c
heating materials and
cleaning the road surface -
(Hillsand 3 cft for mixing and 2
cft for dusting).(Rates includes
22 all cost of materials T&P and
carriage upto 3 chains)

(a) Using Much bajri 5.1 to 5.60 which ever


%Sft 789.8 3252.37 Sqm 84.97 349.9 is apllicable -
(b) Usiing crush bajri
%Sft 789.8 3206.95 Sqm 84.97 345.02 do -
(c) Using Jharo bajri
%Sft 789.8 3167.77 Sqm 84.97 340.8 do -
3"(75mm) Asphaltic Base Course Plant Mix
Providing and laying plant mix
asphalt concrete binder course
compacted thickness 3" inches
(75 mm) as per approved job mix
formuale using crush aggregates
from approved sources .Using
asphalt of grade 60/70 during
laying temperature not less than
140C compacted by steel wheel
and PTR roller .The procedure of
formuale using crush aggregates
from approved sources .Using
asphalt of grade 60/70 during
laying temperature not less than
140C compacted by steel wheel
and PTR roller .The procedure of
laying binder course materials
and methodology shall fully
comply with AASHTO standards
and as directed by Engineer 203 NHA
Incharge .minmum bitumen specifications
content shold be 3.5% binder
23 course shall be spreading using Note: The quantities
A paver machine .Rolling and provided in the RAs are
%Sft 2846.92 10769.91 Sqm 306.26 1158.68 for estimationpurpose -
finishing to design proper grade
line level and camber etc.(Rates .The actual quantities
i/c all cost of materials ,POLs & are tobe worked out as
craiiage upto site) per approved JMF.

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
4"(100 mm) Asphaltic Base Course Plant Mix
Providing and laying plant mix
asphalt concrete binder
course compacted thickness
4" inches (100 mm) as per
approved job mix formuale
using crush aggregates from
approved sources .Using
asphalt of grade 60/70 during
laying temperature not less
than 140C compacted by steel
wheel and PTR roller .The
procedure of laying binder
course materials and
methodology shall fully 203 NHA
comply with AASHTO specifications
23 standards and as directed by
Engineer Incharge .minmum
Note: The quantities
B bitumen content shold be provided in the RAs are
%Sft 3732.47 13758.75 Sqm 401.56 1480.23 for estimationpurpose -
3.5% binder course shall be .The actual quantities
spreading using paver are tobe worked out as
machine .Rolling and finishing per approved JMF.
to design proper grade line
level and camber etc.(Rates
i/c all cost of materials ,POLs
& craiiage upto site)

1-1/2" thick Asphalt concrete Waering Course Plant Mix


Laying mechanically to prper
line and grade plant mix
asphalt concrete specified
formulae according to the job
mix formulae approved by the 204 NHA
Engineer Incharge rolling and specifications
24 finishing to design .proper Note: The quantities
A grade line level and camber provided in the RAs are
%Sft 1960.75 6873.79 Sqm 210.95 739.51 for estimationpurpose -
etc(Machinery with POLs cost
of material carriage) .The actual quantities
are tobe worked out as
per approved JMF.
2"(50 mm) thick Asphalt concrete Waering Course Plant Mix
Laying mechanically to prper
line and grade plant mix
asphalt concrete specified
formulae according to the job
mix formulae approved by the 204 NHA
Engineer Incharge rolling and specifications
24 finishing to design .proper Note: The quantities
B grade line level and camber provided in the RAs are
%Sft 1960.75 8274.73 Sqm 210.95 890.23 for estimationpurpose -
etc(Machinery with POLs cost
of material carriage) .The actual quantities
are tobe worked out as
per approved JMF.

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Providing premixed patch
repair s 1" thick with
(40+12+15)=67 lbs 10 cft of
bajri and 4 cft hillsand
including cleaning cutting
sacteerted patches in proper
shape laying premixed
chips.rolling etc complete. -
(Rates includes all cost of
materials T&P and carriage
25 upto 3 chains)

(a) Using Much bajri 5.1 to 5.60 which ever


%Sft 789.8 3252.37 Sqm 62.31 414.72 is apllicable
(b) Usiing crush bajri %Sft 789.8 3206.95 Sqm 62.31 406.57 do
(c) Using Jharo bajri %Sft 789.8 3167.77 Sqm 62.31 399.55 do
Providing premixed patch
repair s 3/4" thick with
(30+9+15)=54 lbs bitumen
7.50 cft of bajri and 3.50 cft
hillsand including cleaning
cutting sacteerted patches in
proper shape laying premixed
chips.rolling etc complete. -
(Rates includes all cost of
materials T&P and carriage
26 upto 3 chains)

Providing premixed patch repair 5.1 to 5.60 which ever -


%Sft 413.57 3045.46 Sqm 44.49 327.64 is apllicable
(b) Usiing crush bajri %Sft 413.57 2988.69 Sqm 44.49 321.54 do
(c) Using Jharo bajri %Sft 413.57 2939.72 Sqm 44.49 316.27 do
SPREADING STONE METAL
Spreading course aggregate in
required thickness to prpoer
camber and grade i/c hand
packing spreading screning at
required rate filling
27 depressions so as to bring it to 3.1 to 3.4 which ever
%Cft 533.94 - Cum 188.67 -- is apllicable -
proper camber and grade i/c
watering the same to full
compaction .

APPLYING BITUMEMOUS COAT


Applying first coat with
pressure bitumen boiler
binder of approved quality
and penetration at the
Applying first coat with
pressure bitumen boiler
binder of approved quality
and penetration at the
required rate including
cleaning the road surface
28 removing the loose materials 5.1 to 5.60 which ever
heating the binder to required %Sft 173.98 - Sqm 18.71 -- is apllicable -
temperature and spreading
chips in required quantity.

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
APPLYING BITUMEMOUS COAT
Applying 2nd coat with
pressure bitumen boiler
binder of approved quality
and penetration at the
required rate including
cleaning the road surface
29 removing the loose materials 5.1 to 5.60 which ever
heating the binder to required %Sft 113.65 - Sqm 12.22 -- is apllicable -
temperature and spreading
chips in required quantity.

APPLYING BITUMEMOUS COAT


Applying 3rd coat with
pressure bitumen boiler
binder of approved quality
and penetration at the
required rate including
cleaning the road surface
30 removing the loose materials 5.1 to 5.60 which ever
heating the binder to required %Sft 80.39 - Sqm 8.64 -- is apllicable -
temperature and spreading
chips in required quantity.

PRIME COAT OR TACK COAT


Applyinh prime coat or tack
coat with approved binder at
the required rate including
cleaning the road surface
thoroughly ,heatinhg to the
31 required temperature and 5.1 to 5.60 which ever
%Sft 64.96 - Sqm 6.98 - is apllicable -
spraying the binder with
pressurea as directed ect
complete.

APPLYING OF BITUMENOUS SURFACE


Laying to proper camber and
grade carpet mechanically
mixed of chips of approved
guage and in requirded
gradation and hillsand as
diirected premixed with
binder of approved quality
heated to required
temperature and mixed in the
required proportion as 5.1 to 5.60 which ever
directed requirded rates %Sft 65.96 - is apllicable -
,iincuding dusting and
32 finishing surface with hill sand
and providing and using side
forms etc complete.

(a)1-1/2" Premixed carpet 5.1 to 5.60 which ever -


%Sft 1443.96 Sqm 155.26 - is apllicable
(a)1-1/2" Premixed carpet 5.1 to 5.60 which ever -
%Sft 1443.96 Sqm 155.26 - is apllicable
(b)1" Premixed carpet %Sft 986.02 Sqm 106.02 - do
(c)3/4" Premixed carpet %Sft 706.48 Sqm 76 - do

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
ROLLING WITH POWER ROLLER
Rolling over earthwork
charges of 10-12 tons road
33 roller. 2.1 to 2.4 which ever
P/hour 822.52 - is apllicable -

ROLLING WITH POWER ROLLER


Rolling with power roller over
stone metal to compaction as
34 per modified AASHO 3.1 to 3.4 which ever
specifications %Cft 723.82 - Cum 255.77 is apllicable -

ROLLING WITH POWER ROLLER


Rolling with power roller
consolidating bitumenous
work. - -

(a) Ist coat 5.1 to 5.60 which ever -


%Sft 60.93 Sqm 6.56 - is apllicable
(b) 2nd coat
%Sft 45.7 Sqm 4.92 - do

35 ( c ) 3rd Coat %Sft 36.56 Sqm 3.93 - do


(d) 3/4" thick carpet 5.1 to 5.60 which ever -
%Sft 60.32 Sqm 6.49 - is apllicable
(e) 1" premixed carpet
%Sft 86.17 Sqm 9.27 - do
( f ) 1-1/2" Premixed carpet
%Sft 120.64 Sqm 12.98 - do
(g) 2" Premixed carpet %Sft 150.8 16.22 - 5.1 to 5.60 which ever -
is apllicable
Sqm

LAYING BRICK SOLING

Laying bricks of 9"xx4-1/2"x3"


size to prper camber and
grade i/c preparing subgrade
to proper level and grade i/c
ramming filling the joints with - -
pit sand etc complete.
36

(a) Bricks on edge 5.1 to 5.60 which ever -


%Sft 460 Sqm 49.46 - is apllicable
(b) Flat bricks
%Sft 269.1 Sqm 28.94 - do
( c ) Bricks on end edging.
%Sft 228.23 Sqm 24.55 - do
HEATING OF BITUMEN
Heating charges ofg bitumen
for various types of
bitumenous works including
37 contractors profit 5.1 to 5.60 which ever
P/ton 3574.04 - P/Kg 3.57 - is apllicable -
SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
MACHINERY WITH POLs.
1. Asphalt Plant -
P/hour 12999.6
2. Paver Finisher
P/hour 4913
3. P.T.R
P/hour 2463.6
4. Dumper Hino -
P/hour 2006.9
5. Fron End Loader
P/hour 3088.13
6. Smooth Wheel Roller
P/hour 1225.84
7. Bitumen tanker 1984 -
P/hour
38
8. Bitumen Distributor 4264.24 -
P/hour
9. D-7 Dozer
P/hour 3702.11 -

10. water Van


P/hour 1315.24 -

11. Prime mover


P/hour 3083.67 -

12. 10-12 Road Roller 822.52 -


P/hour
13. Motor Grade 3233.41 -
P/hour
14. Hire charges of bitumen P/day 4500 -
mixer

MISCELLANOUS
Jungle clearance and
removing within 100 ft
- -
1
(a) THIN JUNGLE -
%0Sft 69.58 %Sqm 74.82
(b) THICK JUNGLE
%0Sft 139.15 %Sqm 149.62
Making and maintaining
diversion during construction
i/c supplying necessary
barriers notice boards with
lighting arrangements and
providing temporary crossing
over the water course where
2 ever necessary so as to be P/mile 90870.89 - P/Km 56476.63 -
good motorable condition

Breaking stone blast screened


and stacked. - -

3 (a) 2--1-1/2" guage -


%Cft 974.05 Cum 344.19
(b) 1"-1-1/2" guage
%Cft 1113.3 Cum 393.36

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
S.No Description Unit Unit Specifications Remarks
Labour Composite Labour Composite
Cutting and removing trees
within distances of 100 ft
- - -

(a) Upto 2 ft girth -


Each 480.98
(b) 2-5 ft to 6 ft girth
4 Each 940.78
(c) removal of trees 150 mm
to 300 mm girth including
uprooting and disposal to Each 151.53
(out side limits) designated
places.
(a)Up rooting stumps and
removing within 100 ft
5 Each 556.6 - -

sacrifying the existing road


6 surface. %Sft 116.16 - Sqm 12.49 - -

Making diagonal grooves of 1-


1/2" x1-1/2" at 2 ft centre to
7 centre.in road surface. %Sft 146.41 - Sqm 15.74 - -

Breaking stone blast screening


and stacking 2 inch ring.
8 %cft 834.9 - Cum 295.02 -

Cleaning and grubbing the


service road within 12 ft width
9 for making and maintaining P/mile 5884.29 - P/Km 3657.11 -
divrsion.

Cost of 100 cft much bajri at


source of supply 3/8 to 3/4
10 guage free from dust and %Cft 3525.5 - Cum 1245.75 -
other materials.

Dismantling of existing asphalt


concrete road including
base/sub base course/ and
disposal of dismantled
11 materials to designated %Sft 773.86 - Cum 273.45 -
places.

CAT EYES/ROAD STUDS


Supplying and fixing
reflectorize Road Studs
12 Double Face,flush surface 609 NHA
Each 569.23 - -
type specifications

THERMO PLSTIC PAINT


pavement marking in
13 reflective Thermo Plastic
Paint for lines of 6" wiidth 608 NHA
Prft 41.24 - Rm 135.31 -
specifications

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
KERB STONES
Providing and fixing precast
brick edge block 3750 PSI
industrial made sze 6"thick
12" long and 12" high
including the cost of cartaqge
Providing and fixing precast
brick edge block 3750 PSI
industrial made sze 6"thick
12" long and 12" high
including the cost of cartaqge
excavation form work for
14 haunching 1450 PSI lean
concrete 2250 PSI concrete rft - 297.01 Rm 974.19 -
for haunching 1:4 cement
sand mortor.

Providing and laying fair faced


reinforced cement concrete
new jersy barrier having 3000
PSI compressive cylindrical
strength concrete (Ready
mixed concrete) ( area 3.50
Sft) as per drawing i/c the cost
excavation form work lean
15 concrete 1450 PSI PRft 514.13 1224.61 Rm 1686.35 4016.72 -
compressive cylindrcal
strength etc complete in all
respect(excluding cost steel
reinforcement)

Providing and laying fair faced


reinforced cement concrete
new jersy barrier having 3000
PSI compressive cylindrical
strength concrete (Ready
mixed concrete) ( area 2.0 Sft)
as per drawing i/c the cost
excavation form work lean
16 concrete 1450 PSI PRft 293.78 699.78 Rm 963.6 2295.28 -
compressive cylindrcal
strength etc complete in all
respect(excluding cost steel
reinforcement)

Providing and laying fair faced


reinforced cement concrete
new jersy barrier having 3000
PSI compressive cylindrical
strength concrete (Ready
mixed concrete) ( area 1.50
Sft) as per drawing i/c the cost
excavation form work lean
17 concrete 1450 PSI PRft 212.84 524.83 Rm 698.12 1721.44 -
compressive cylindrcal
strength etc complete in all
respect(excluding cost steel
reinforcement)

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Traffic Signs tringular
Providing and fxing traffic sign 3"
dia GI pipe post and sign of
18 equilateral tringle shape each
A side 3' long i/c painting ,marking Each -- 14600 -
as directed each.

Traffic Signs Circular


Providing and fxing traffic sign 3"
dia GI pipe post and sign of
18 equilateral circular shape each
B side 3' long i/c painting ,marking Each -- 14600 -
Providing and fxing traffic sign 3"
dia GI pipe post and sign of
18 equilateral circular shape each
B side 3' long i/c painting ,marking Each -- 14600 -
as directed each.

Traffic Signs Rectangualr


Providing and fxing rectangualr
18 shape 3'x2' comprising 2 nos 3"
C dia GI pipe i/c painting ,marking
( I ) as directed each. Each -- 16765 -

Informatory Sign Rectangualr/village board


Providing and fxing rectangualr
18 shape 4'x3' comprising 2 nos 3"
C dia GI pipe i/c painting ,marking
( II ) as directed each. Each -- 16956 -

Kilometre Post
providing and fixing precast RCC
18 KMs posts i/c foundation
C work,painting and writing as
( II ) directed each. Each -- 5600 -

XTRA LEAD
Extra for every 50 ft additional
lead or a part there of earthwork
19 excavation in gravel shingle or
rock. %0Cft 120.94 -

Rehandling of earthwork lead


20 upto sinle throw of Kassi phaorah %0Cft
or shovel.
756.25 -

Cut
earthwork excavation in ashes
21 sand soft or silt clearance
undressed lead upto 50 ft. %0Cft 1663.75 -

Dressing
dressing and levelling of
earthwork to designed section etc %0Cft 1664.75 -
complete.

22 soil
(a) Ashes,sand,silt or soft
%0Cft 96.8 -

(b) Ordinary or hard soil. 187.55 -


%0Cft
(c) Gravel work of soft rock 453.75 -
(Not require blasting) %0Cft
Dowel dressing(The rate s in
23 addition
earthwork
to payment for dressed %0Cft 1663.75 -

SCHEDULE OF RATE
VOLUME III PART VI (HIGHWAY WORKS FINISHED ITEMS)
Imperial Units Metric Units
S.No Description Unit Rate Rs. Unit Rate Rs. Specifications Remarks
Labour Composite Labour Composite
Compaction
earthwork compaction by
rolling(This does not includes the
hire charges of the roller. -

(a) Ashes,sand,silt or soft


%0Cft 635.25 -
24 soil
(b) Ordinary or hard soil. 756 -
%0Cft
( c )Hard soil 832 -
(Not require blasting) %0Cft
( d ) Admixture of shingle 952.88 -
(Not require blasting) %0Cft
Earthwork compaction (soft
,ordinary or hard soil) -
(a) Laying earth in 6" layers 3873.4504 -
,levelling and dressing etc %0Cft
24 complete.
(a) Laying earth in 6" layers 3873.4504 -
,levelling and dressing etc %0Cft
24 complete.
B soil
(b) Laying earth in 6" layers 4727.0788 -
levelling ,dressing & watering for
compaction etc complete. %0Cft

Barrow pit excvation undressed


lead upto 100 ft. -
25 (a)Ordinary or soft soil..
5432.7451 -
%0Cft
Extra for every 50 ft additional
lead or a part there of earthwork
excavation in ashes sand soft soil
26 or silt. %0Cft 104.08 -

Extra for every 50 ft additional


lead or a part there of earthwork
excavation in ordinary soil.
27 %0Cft 107.89 -

Earthwork excavation in irrigation


channels drains etc dressed to
desgn section.grades and prfles
excavated materials disposed off
within 50 ft lead. %0Cft 108.89 -

28

(a)Ordinary soil.
%0Cft 2420 -

(b) Hard soil. 2904 -


%0Cft
3870.83
1520.45 163.58 4 30
1211.54 130.34 2.75 25
2731.99 293.92 6.75 55

1211.54
858.82
2070.36

159.35
0
116.95

276.3

1916.41 206.17
906

50.33333333333
0
604
0
7248
82500

498300
Providing and fixing precast brick edge block 3750
PSI industrial made sze 6"thick 12" long and 12"
high including the cost of cartaqge excavation
form work for haunching 1450 PSI lean concrete
2250 PSI concrete for haunching 1:4 cement sand
mortor.
CARRIAGE IN KMS
Bricks
LEAD S/METAL C/Bajri Hillsand 1000 Nos Cement Bitumen
P Cum P Cum P Cum P/Bag P/Bag P/Ton REMARKS
1 Kilomete 89.32 89.32 89.32 202.36 3.79 75.89
2 Kilomete
62.59 62.59 62.59 141.81 2.66 53.17
3 Kilomete 20.96 20.96 20.96 47.48 0.89 17.81
172.87
4 Kilomete 17.77 17.77 17.77 40.24 - -
5 Kilomete
16.63 16.63 16.63 37.68 - -
6 Kilomete 15.46 15.46 15.46 35.04 - -
7 Kilomete
14.71 14.71 14.71 33.3 - -
8 Kilomete
14.17 14.17 14.17 31.97 - -
9 Kilomete
12.72 12.72 12.72 28.82 - -
10 Kilomete
10.75 10.75 10.75 22.29 - -
Total 275.08 275.08 275.08 620.99 7.34 146.87
Subs: 7.15 7.15 7.15 16.19 0.37 6.07
25% Hilly Portion 37.98 - - - - -
89.32 151.91
78
140
307.32

569.88 172.87
151.91
431.89

172.87

391.65
STONE METAL SCREENING SAND CRUSH BAJRI HILLSAND BITUMEN BRICKS Stone Dust
ITEM OF WORK
P Cum P Cum P Cum P Cum P Cum Ton Nos P Cum
Sub Base Course
Qtyx1.33 - Qtyx0.20 - - - - -
with 20 cft Pit/Canal sand
Bricks on Edge - - - - - - Qtyx 13.5 -
Base Course
with 15 cft Screening Qtyx1.33 Qtyx0.15 - - - - - -
First Coat - - - Qtyx0.017 - Qtyx 1.92 Kg - -
(5.5 Cft C/Bajri 40 lbs bitumen) 1000
First Coat Qtyx 1.44 Kg
(4 Cft C/Bajri 30 lbs bitumen) - - - Qtyx0.012 - 1000 - -

Second Coat Qtyx 1.20 Kg


- - Qtyx0.011 - - -
(3.5 Cft C/Bajri 25 lbs bitumen) 1000
Second Coat - - - Qtyx0.008 - Qtyx 1.20 Kg - -
(2.75 Cft C/Bajri 25 lbs bitumen) 1000
Third Coat - - - Qtyx0.005 - Qtyx 0.67 Kg - -
(1.50 Cft C/Bajri 14 lbs bitumen) 1000
1-1/2 Thick Carpet
(15 Cft C/Bajri 93 lbs bitumen) - - - Qtyx0.046 Qtyx0.015 Qtyx 4.47 Kg - -
1000
5 cft Hillsand
1-0" Thick Carpet
Qtyx 3.22 Kg
(10 Cft C/Bajri 67 lbs bitumen) - - - Qtyx0.047 Qtyx0.012 1000 - -
4 cft Hillsand
3/4" Thick Carpet
(7.5 Cft C/Bajri 54 lbs bitumen) - - - Qtyx0.031 Qtyx0.011 Qtyx 2.6 Kg - -
1000
3.5 cft Hillsand

2" Thick Asphalt


(12.81 Cft C/Bajri 3/4" and down
Qtyx 0.72 Kg
15 lbs bitumen for Tack Coat & Qtyx0.039(12.81) 1000
132.5 Lbs bitumen for mixing at - - - Qtyx0.011 - Qtyx0.006
plant) Qtyx0.016(5.34) Qtyx6.37
1000
C.Bajri 3/8 and down 5.34 cft
Stone dust 2.12 Cft

Bajri Bitumen Sand


Two coat 0.013 1.87 1 inch bajri Bitumrn Sand
38 mm carpet 0.047 4.47 0.015 First coat 0.012 1.44 0.012
0.060 6.34 25mm 0.047 3.22

0.059 4.66
1-/12 bajri Bitumrn Sand
Two coat asphalt Total First coat 0.012 1.44 0.015
0.030 Bajri 0.013 0.055 0.068 25mm 0.046 4.47
Sand 0.011 0.011 293.92
Bitumen 1.87 6.37 8.24 0.058 5.91