First of all, we would like to tell you what would be the covered area of 10 marla house
double story construction approximately 3400/sqft it is depends on your requirements
and in which society you are going to build your house some societies bylaws are very
tough you cannot cover the porch and third- oor plan only two stories can be build
boundary wall does not include in this estimate
Your labour (Tekhdar) should be very sincere with you while making your dream house
otherwise you can get involved into trouble with money or safety of the house mostly men
they do not know anything about construction they just do as you said they don’t have a
concern with your house safety and money all they need is money when they are full of
pockets they left you and not going to pick your phone calls
Labor cost depends on the construction project on what type of construction you are
going to construct.
There are many types of construction simple masonry work concrete work-frame structure
with columns and other more.
Nowadays the labor rate of construction is starting from 250-350/sqft as we told you it
depends on the construction of your house
If your house plan is a simple labor rate should be 270/sqft maximum without electric and
plumbing installation. 10 marla house construction grey structure should have completed
within three to four months maximum of 10 marla house construction
2
How much Bricks Do needs to build 10 marla House
construction cost?
Approximately 85,000 bricks need to build a 10 marla house from the foundation till
completion of the grey structure. ( if plot depth is 3 feet below from road level) although
bricks sizes are di erent but it does not make much di erence of the quantity all you have
st
to check is just the quality of brick it should be 1 class brick there are three types of
st nd rd
bricks 1 ( awal) 2 is (doum) 3 is ( khingar ) khingar is best for the foundation and
khingar must in install in foundation till D.P.C.
Khingar rate is 10 per brick if you are going to laying khingar on your foundation ask it
from your thekdar or foremen how much do need it approx. 20,000 brick required in the
foundation.
Approximately 1500 cement bags required for the 10 marla house construction there are
many brands cement available in the market but we strongly recommend to you use these
brand (MAPLE, D.G, BESTWAY, LUCKY) it doesn’t make any much di erence in the cost
Approximately 2100/sqft required for the 10 marla house construction normally there are
2 types of gravel used in Punjab ( Margla, Sargodha, Sargodha Plant )
Margla rate is 74/sqft and Sargodha rate 55/sqft and rohi rate is 62/sqft
Sargodha Plant rate is 68/sqft mostly recommend the best product for the RCC slab
Now the question comes in your mind What is the di erence between Sargodha and 2
margla gravel
Strength di erence after using Sargodha gravel if you go for test concrete 2700 PSI will
show in the test report but if you use margla gravel concrete PSI will come 2800 not a big
st
di erence and a single 1 class brick PSI/1800
How much sand do you need for the 10 Marla House
construction cost?
Approximately sand you will need 9 trucks for the completion 10 marla house construction
of the house till grey structure from foundation till P.C.C of the house each truck should
have 700/sqft sand.
There are many types of companies that making electric and plumbing pipes but we
recommend some of them to you for the electric pipes we will recommend only popular 2
good quality with reasonable price
And for the plumbing work, we also recommend popular same reason good quality with
the reasonable price in popular there are three type qualities 1 16 gauge than 20 & 25
gauges also pipes sizes plumbing pipes work a bit complicated for the understand until or
unless you know about it
P.C.C Stand for Plain Concrete Cement for the ooring for the PCC you will need Rori for
ooring lay it on the ooring and do compact in a good way with compactor then water
pouring you will need approximately1600/sqft Rori for the 10 marla house ooring each
trolley comes with 500/sqft so you will need 3 or 4 trolley max for the ooring
Auriga, mar ix are the best termite proo ng companies in Punjab for the foundation and
before ooring PCC must require so that your woodwork can be same from termite
approx. you will need 20 bottles for termite proo ng each bottle 500ml price is 2,200/=
and nowadays in the market termite pipes are also available for termite they install just
like you GAS pipelines in every room if you go for it that would be very great idea roughly
cost for the termite pipes 35,000/=
2200 x 20 = 44,000/= 2
Items Pr/sqft – price QTY Amount Total
6. All
1. Brick Work 7.
3. 4.
Leaning 2. 5. foundation Back lling
Water Termite
and Excavation P.C.C including with gaso
Boring proo ng
marking boundary ravi
wall
8. All
14. All
Brick work
PPRC
Super 13.
10. 12. Piping Gas
Structure 9. Door
R.C.C
11.
Safety
Boundary
Water 2
Including Frames Plasters wall Height
lentil Grills Sewerage
Door & 6 feet
& Electric
Windows
Pipes
Beam
15. 16. Roof
Under Mud Brick
Ground tiles
tank,
Septic
tank, Over
Head
Tank
For any inquiry feel free to Contact nishing items it is all up to you what type of
nishing you want to tile or marble for the ooring what type of woodwork do you want
aluminum paint job ceiling type gypsum or what type of sanitary things and kitchen work
and all that
Share your house working drawings with us and get an estimation ( Construction
Cost )of your dream house
Email info@constructioncompanylahore.com
Contact us
Facebook 2
Search
Recent Posts
Before House Plaster Instruction
Al Naafay Construction Company Lahore copy rights 2021