Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

Where is the SCF file located?

What is the name of the BBU port where the CAT5 Ethernet cable should be connected to?
Where is the BBU SW?
How do you know the Ethernet cable connection is physically successful?
What is the password to be used in your Smarphone when enabling mobile Hotspot?
What is the SSID name to be used in your Smarphone when enabling mobile Hotspot?
Do you always need a physical dedicated Hotspot for Jamura to connect?
Can you activate multiple Jamura boxes on-site?
Why does Jamura have an Un-interrupted Power Supply?
How do you turn OFF the Jamura unit?
How do you know the Jamura internal Un-interrupted Power Supply is charging?
To which micro USB port you should connect the external Power Adapter?
How do you know Jamura is turned ON?
Does Jamura have an internal Un-interrupted Power Supply?
Option D:
Thee site kick-off meeting with Nokia project (PM & GDC) and team leads is not required
What is the first step to be completed by GDC after receiving the call from the field?
Does the Un-interrupted Power Supply eliminates the need for connecting Jamura unit to the power source?
How many jamura
What is the third step to be completed by GDC after receiving the call from the field?
How do you know how much battery is left in the internal Un-interrupted Power Supply?
SCF FILE WILL PROVIDED BY NOKIA
lmp
it will be loaded
The LEDs In The
5gishere2017
5G Is Here
Yes, You should
Yes, you can bring
to keep jamura unit on
You will need to press a small
you will see a series of light
to the top micro usb
you wull see a green
1
Option D:
0
verify
The un-interrupted power Yes No

Click in to
the series
Work Distribution charts are called as: Yamazumi
Deploying 5S on site means: all of them
Sequence of kaizen process assessment: Observe- analyse-implement
What is the team composition for KAIZEN deployment in case study #1? 1negginer + 2technisi+1rigger
Rectification of Punch Point is what kind of waste? Rework
Value adding activity is one: is willing to pay
Prestaging of SRAN stacks at the warehouse: is worth

Among the below people, who shall contribute to the kaizen improvement cycle? all of them
Which of the work methodology is preferred in Lean/Kaizen? B&C
In 5-Why Analysis do we get the result exactly on the 5th Why? no
Basic principles of KAIZEN are: all of them
KAIZEN stands for? chage for good
Which of the below tricks reduce movement and waiting MUDA (select best 3
Options) Selain USE OF CABLE UNWIDER
Which of this is called as mother of all the wastes? Overproducting
After deploying KAIZEN, I will be able to do following: all of them
Identify the type of waste in the statement- I put four ties on weatherproofing
thinking it was a better job over processing
How many types of waste are there? 6
VSM Stands for: Value Stream
Identify the type of waste in the statement- I put four ties on weatherproofing
thinking it was a better job to do: Over Processing
Identify the type of waste in the statement- I climbed the tower and was idle as
antenna was not supplied on time by other technician: waiting
Select the correct statement: semua benar
Identify the type of waste in the statement- I assembled three antenna and kept it for Inventory
Identify the type of waste in the statement- The tool was kept in car by me & I have to Movement
go
Arrangement of the technician van (used for equipment delivery to site, tools and I&C tdrwaer + will money
Acronym for waste is: none of
Work Sequencing charts for KAIZEN process are called: yamamuzi chart
To maximize the kaizen benefits, the engagement of the field team is key and can be
facilitated by (Select 2 best options): to observation + manager
analyse-implement
+ 2technisi+1rigger

E OF CABLE UNWIDER

ation + manager

You might also like